Permit Information
Permit NumberBLD12-00818
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHEWLETT PACKARD-1-3 UPPER LINK
Customer Number 
ePlanReviewNo
Description
(HP – Bldg 1 & 3 upper link – Breakroom) Permit is to remodel to an existing open office area to create a new break room area. Work to include: [construction of one non-combustible full height partition walls to: separate the appliances from the open work space, installation of new booths, installation of new floor finishes, install new plumbing, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/2/201312/12/2013 DONE
Print Statement  12/12/2013 DONE
DetailsTisha Gallop
e-mailed to Jeff Tonkin at HC Company
Second Notice 11/10/201311/27/2013 DONE
First Notice10/1/201310/1/201310/31/2013 DONE
DetailsJim Sly
BLD-Final9/30/201310/1/201310/1/2013APASS
DetailsJim Sly
Jason Phone #: ###-####
DOC - Permit Finaled10/1/201310/1/201310/1/2013PPASS
DetailsJim Sly
FIRE-Final Inspection6/28/20126/28/20126/29/2012PPASS
DetailsTroy Cobbley
life safety passed
BLD-Other5/16/20125/17/20125/17/2012APASS
DetailsJim Sly
Ceiling grid inspection for the B1-3 Link Pantry
Contact Jeff Tonkin ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis
BLD-Framing/Rough-in4/27/20124/30/20124/30/2012APASS
DetailsJim Sly
JASON Phone #: ###-####
OK to cover pending Mech and Plumbing rough-in approvals.
Print Occupancy Form  4/27/2012 DONE
Permit Ready to Issue  4/27/2012 DONE
DetailsTisha Gallop
Telephone call  4/27/2012 DONE
DetailsTisha Gallop
called Brian/HC Company and left vm permit is ready and fees.
Issue PAID IN FULL permit  4/27/2012 DONE
DetailsBarbara Stitt
Plan assigned to (TLW)4/13/2012 4/26/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/26/2012 4/26/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/26/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  4/26/2012 DONE
DetailsTim L. Woodard
Plan resubmittals received  4/24/2012 DONE
DetailsTisha Gallop
received transmittal and two copies of plan sheet A-1; taken to Tim Woodard.
Routing - PLAN CHECK4/13/2012 4/20/2012 FAIL
DetailsTim L. Woodard
Refer to plan review report. Tim Woodard
1st review completed  4/20/2012 DONE
DetailsTim L. Woodard
Application received 4/13/20124/13/2012 DONE
DetailsBarbara Stitt
Intake Approval  4/13/2012 PASS
DetailsSam Zahorka
Recd Pcfee & Taken To Pln CK  4/13/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/13/2012 DONE
DetailsBarbara Stitt