Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-00827
StatusFinaled
Name David Thompson
Site Address 3027 N COLE RD
Project NameBoise Barber College
Customer Number 
ePlanReviewYes
Description
(BOISE BARBER COLLEGE - TENANT EXPANSION) This building does not have a fire sprinkler system. To expand an existing barber college into an adjacent area. After the expansion, this tenant space will have a total floor area of about 5,959 square feet. Work is to include interior nonbearing walls, interior doors, and a new exterior door with sidelights. A new structural header and trimmers will be provided at the new exterior door. Since source capture exhaust is not provided, this tenant space is not allowed to have nail stations. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/4/201210/8/2012 DONE
Third Notice 8/29/20129/20/2012 DONE
mailed to David Thompson
Second Notice 8/6/20128/24/2012 DONE
First Notice 7/23/20127/27/2012 DONE
BLD-Final7/12/20127/13/20127/13/2012APASS
DetailsTom Arcoraci
Bill Phone #: ###-####
FIRE-Final Inspection7/12/20127/13/20127/13/2012APASS
DetailsTroy Cobbley
life safety passed.
Zoning Approval7/13/20127/13/20127/13/2012 DONE
DetailsAndrea Tuning
Permanent Occupancy  7/13/2012 DONE
DetailsChristina Prado
FIRE-Final Inspection7/12/20127/12/20127/12/2012PFAIL
DetailsTroy Cobbley
Bill was not in the office when I was on site. Liz and I rescheduled for tomorrow.
Print Occupancy Form  7/12/2012 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  7/12/2012 DONE
DetailsChristina Prado
(F) Reprint permit  7/12/2012 DONE
DetailsChristina Prado
Plan assigned to (CJW)7/2/2012 7/3/2012 PASS
DetailsCarl Westfall
Plan modification received.
Routing - PLAN CHECK7/2/2012 7/3/2012 PASS
DetailsCarl Westfall
Plan modification approved with "red lines". Charge for 1 hour.
Plan Modification Accepted  7/2/2012 DONE
FIRE-Final Inspection6/22/20126/26/20126/26/2012ACANC
DetailsTroy Cobbley
Bill Phone #: ###-#### 6-25-12 per Liz cancel inspection not ready///dld
BLD-Final6/22/20126/26/20126/26/2012PCANC
DetailsJim Sly
Bill Phone #: ###-#### 6-25-12 per Liz cancel inspection not ready///dld
FIRE-Final Inspection6/21/20126/22/20126/22/2012AFAIL
DetailsTroy Cobbley
Mount the fire extinguisher as discussed and provide single action hardware on the doors as discussed. The exit signs and emergency lights functioned.
BLD-Final6/21/20126/22/20126/22/2012PCANC
DetailsJim Storey
Bill Phone #: ###-####
BLD-Framing/Rough-in5/29/20125/30/20125/30/2012PPART
DetailsJim Sly
liz Phone #: ###-####
Kings...Cripples and header South Ext. wall OK.
FIRE-Conference5/30/20125/30/20125/30/2012PDONE
DetailsTroy Cobbley
Bill and I went over life safety requirements. One exit at the end of a short corridor, with exit sign/emergency light on the north side of the building, has been walled off and is now in an office. Also Bill is interested in possibly deleting exit signs. I deferred deleting signs and the wall changes to the plan reviewer for re-verification. We also discussed relocating signs to where they will be more visable. Door hardware is not yet complete nor is the south store front assembly.
Permit Ready to Issue  5/25/2012 DONE
Issue PAID IN FULL permit  5/25/2012 DONE
Print Occupancy Form  5/25/2012 DONE
Plan assigned to (CJW)4/19/20124/19/20125/18/2012 PASS
DetailsCarl Westfall
BOISE BARBER COLLEGE (20 days - May 15) ePlanReview case.
PLANS/APPL TAKEN TO FRONT DESK  5/18/2012 DONE
Routing - Design Review5/17/2012 5/17/2012 PASS
DetailsSarah Schafer
Approved per CZC12-00102
Routing - PLAN CHECK5/15/2012 5/17/2012 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
Plan resubmittals received  5/15/2012 DONE
Routing - PLAN CHECK4/19/2012 5/14/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 12 and was finished on May 14. Revised drawings were required. See the plan review report.
1st review completed  5/14/2012 FAIL
Routing - FIRE4/19/2012 4/20/2012 PASS
DetailsScott Arellano
Routing - Design Review4/19/2012 4/19/2012 FAIL
DetailsSarah Schafer
Sarah Schafer - New storefront entry on south side (at new classroom)

A zoning certificate is needed for the change to the storefront. Bill Matter has been left a message.
Pending Assignment by JCB4/19/2012 4/19/2012 DONE
DetailsJason Blais
Intake Approval  4/18/2012 PASS
John Menard passed prescreen review on 4/16/12. Plan Review Fees paid on 4/18/12.
Telephone call  4/16/2012 DONE
DetailsBarbara Stitt
Sent e-mail that plan check fees are due 4-16-12 @ 1:35pm
Application received  4/13/2012 DONE
Application submitted via PDS Online on Apr 13 2012 4:28PM