Permanent Occupancy | | | 6/6/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 6/1/2012 | 6/1/2012 | 6/1/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 5/30/2012 | 5/31/2012 | 5/31/2012 | A | PASS |
Tom Arcoraci
|
|
|
Open at 10am Phone #: ###-####
|
FIRE-Final Inspection | 5/18/2012 | 5/21/2012 | 5/21/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/25/2012 | 4/26/2012 | 4/26/2012 | A | FAIL |
Troy Cobbley
|
|
|
Remove the wooden bar/brackets from the rear exit door. Remove the thumbturn dead bolt from the rear exit door and provide singel action hardware such as lever type. Provide automatic flush bolts on the in-active leaf of the main exit door. Provide covers on the electrical outlet boxes.
|
Issue PAID IN FULL permit | | | 4/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 4/17/2012 | 4/17/2012 | 4/24/2012 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 4/24/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2012 | | |
|
|
|
|
Print Occupancy Form | | | 4/24/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2012 | | |
|
|
|
|
Telephone call | | | 4/24/2012 | | |
|
|
|
4-24-12 called Amarjitpermit ready for pick up ///dld
|
Routing - PLAN CHECK | 4/23/2012 | | 4/23/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 4/23/2012 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 4/23/2012 | | DONE |
|
|
|
|
Application received | | 4/17/2012 | 4/17/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/17/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/17/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 6/16/2012 | | | |
|
|
|
|