Permit NumberBLD12-00851
StatusFinaled
Name PLATINUM PROS LLC
Site Address 350 N MILWAUKEE ST Unit: 1051
Project NameBTS - #1051 Nakedology
Customer Number 
ePlanReviewNo
Description
(NAKEDOLOGY – BTS SPACE # 1051) Permit is to combine two existing tenant suites (ste# 1051 and 1053) to create a 4,242 square foot retail / business tenant space. This space was previously occupied by “BacQuets” as part of space # 1053 under BLD08-00782. Scope of work includes: new unisex restroom, new accessible counter, [new partition walls to create a tanning rooms, spa rooms, a mechanical room, and work rooms], new lighting, new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/5/2013 DONE
DetailsTisha Gallop
mailed to Platinum Pros
First Follow up  1/17/2013 DONE
DetailsTisha Gallop
put Platinum Pros on hold // received 2-5-13
Third Notice 12/9/20121/3/2013 DONE
mailed with letter to Platinum Pros
Telephone call  12/6/2012 DONE
DetailsChristina Prado
Per conversation with Anna - Builders are out of the state on another project and will be able to submit final values once they return which will be at the first of the new year.
Third Notice 11/21/201212/4/2012 DONE
mailed
Third Notice 10/20/201211/16/2012 DONE
mailed
Second Notice 10/1/201210/15/2012 DONE
First Notice 9/14/20129/21/2012 DONE
mailed to GC
BLD-Final8/31/20129/4/20129/4/2012PPASS
DetailsMike Jordan
Anna Phone #: ###-####
FIRE-Final Inspection8/31/20129/4/20129/4/2012APASS
DetailsForrest France
Correction items are finished. Fire life safety final approved.
Permanent Occupancy  9/4/2012 DONE
BLD-Final8/30/20128/31/20128/31/2012PNR
DetailsJim Sly
call first//Anna Duletsky Phone #: ###-####
Need fire final........
FIRE-Final Inspection8/30/20128/31/20128/31/2012AFAIL
DetailsForrest France
Correction items include; adding missing exit sign shown per plan at the sales floor area, repair two non-functional exit signs, provide missing escutcheon, post PFE as discussed. Smoke evac test completed acceptable.
FIRE-Final Inspection8/24/20128/27/20128/27/2012AFAIL
DetailsTroy Cobbley
I left message on the contacts voice mail and also met the electrician for testing of the smoke evac system but the project was locked with no access. No inspection was performed.
BLD-Framing/Rough-in5/11/20125/14/20125/14/2012APASS
DetailsMike Jordan
Anna Phone #: ###-####
BLD-Framing/Rough-in5/10/20125/11/20125/11/2012APART
DetailsMike Jordan
anna Phone #: ###-####. Interior steel stud walls and hardlids. Needs to add the kickers as shown on plan. Pending plumbing rough in inspection.
Issue PAID IN FULL permit  5/4/2012 DONE
DetailsAlexandra L. DeYoung
(F) Reprint permit  5/4/2012 DONE
Routing - PLAN CHECK5/3/2012 5/3/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/3/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/3/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/3/2012 DONE
Permit Ready to Issue  5/3/2012 DONE
DetailsTisha Gallop
Telephone call  5/3/2012 DONE
DetailsTisha Gallop
called Chris and left message that permit is ready and fees.
Plan assigned to (TLW)  5/3/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/18/2012 5/2/2012 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
1st review completed  5/2/2012 DONE
DetailsTim L. Woodard
Plan resubmittals received  5/2/2012 DONE
DetailsChristina Prado
Received three sets of plans marked A2.01 & A4.01 as well as one Plan Correction Letter. Plans and document given to Tim Woodard for review
Routing - PUBLIC WORKS4/17/2012 4/18/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating4/18/2012 4/18/2012 PASS
DetailsConnie Baumgartner
Application received 4/17/20124/17/2012 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  4/17/2012 DONE
DetailsChristina Prado
Intake Approval  4/17/2012 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  4/17/2012 DONE
DetailsChristina Prado
Routing - Addressing4/17/2012 4/17/2012 PASS
DetailsTerry Records