Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-00921
StatusFinaled
Name WEATHERTIGHT ROOFING INC
Site Address 8854 W EMERALD ST Unit: 220
Project NameWest Boise Professional Center
Customer Number 
ePlanReviewYes
Description
(KENDALL OFFICE - West Boise Professional Center - STE#220) Permit is build out a 5,116 square foot office space on the second floor of an existing shell and core building (BLD99-03170). Work to include: [construction of interior non-bearing / non-combustible walls to create 7 private offices, two storage rooms, a conference room, a break room, and open office area], new sink, new doors and hardware, new mechanical system, new lighting, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. NOTE: the adjacent 1,583 square foot unoccupied space will be considered a portion of this tenant until a remodel to provide different access to that space is completed. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/2/20129/13/2012 DONE
complete 9-13-12
Print Statement  9/13/2012 DONE
First Notice 8/11/20128/23/2012 DONE
DetailsChristina Prado
faxed
Permanent Occupancy  8/1/2012 DONE
DetailsTisha Gallop
BLD-Final7/24/20127/25/20127/25/2012APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by David Krings. ok for perm occ.
BLD-Final7/12/20127/16/20127/16/2012PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by David Krings. Side;ight is wired glass in a hazerdous location. Wiil needs to remove wired glass and provide 45 minute rated galzing/tempered glazing or provide code analysis to iliminate the rated corridor and provide tempered glazing only.
BLD-Final7/12/20127/16/20127/12/2012ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by David Krings Inspection cancelled from web by: David Krings
BLD-Final7/5/20127/6/20127/6/2012PPART
DetailsJim Sly
Please call when en route. Phone #: ###-#### >> Inspection requested via web by David Krings
OK for Temp Occ. OK for Perm when Plumbing Perms........non rated doors installed..........Glass at offices installed.
FIRE-Final Inspection7/6/20127/6/20127/6/2012PPASS
DetailsTroy Cobbley
Life safety passed. Jim Sly is taking care of the doors and associated hardware.
FIRE-Alarm Testing7/5/20127/6/20127/6/2012ADONE
DetailsTroy Cobbley
Fire alarm passed
FIRE-Alarm Testing7/5/20127/5/20127/5/2012PCANC
DetailsTroy Cobbley
Please confirm 4:00 pm testing time. Phone #: ###-#### >> Inspection requested via web by David Krings Inspection cancelled from web by: David Krings
Plan Reviewer's activity  7/5/2012 DONE
DetailsTim L. Woodard
Added the adjacent space into this permits square footage due to all access to that space being through this tenant space. TLW
BLD-Other7/2/20127/3/20127/3/2012APASS
DetailsJim Sly
Ceiling grid inspection. Phone #: ###-#### >> Inspection requested via web by David Krings
BLD-Other6/13/20126/14/20126/14/2012APASS
DetailsTom Arcoraci
Mike, I need to get the reception area and offices ceiling grid inpsected. Any questions, please give me a call. Thanks, Dave Phone #: ###-#### >> Inspection requested via web by David Krings
BLD-Framing/Rough-in5/18/20125/21/20125/21/2012APASS
DetailsMike Jordan
thanks Mike. Phone #: ###-#### >> Inspection requested via web by David Krings
BLD-Conference5/17/20125/18/20125/18/2012ANR
DetailsMike Jordan
Partial framing inspection. Owner occupied site. Please call before inspection and I will meet you there. Thanks. Phone #: ###-#### >> Inspection requested via web by David Krings. Needs to provide approved plans.
Issue PAID IN FULL permit  5/15/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  5/15/2012 DONE
DetailsBarbara Stitt
Permit Ready to Issue  5/14/2012 DONE
DetailsBarbara Stitt
1st review completed  5/9/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/9/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)4/30/2012 5/9/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK4/30/2012 5/9/2012 PASS
DetailsTim L. Woodard
Routing - FIRE4/30/2012 5/2/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing PW Sewer Rating4/30/2012 5/2/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS4/30/2012 4/30/2012 PASS
DetailsBeverly Mountain
Intake Approval  4/30/2012 PASS
DetailsTim L. Woodard
Payment Received  4/27/2012 DONE
Payment received via Govolutions
Telephone call  4/27/2012 DONE
DetailsRita DeYoung
sent email regarding fees
Intake Approval  4/25/2012 FAIL
DetailsTim L. Woodard
Dawna,

Sheets A2 and A3 nor any of the M, E, P's have the required stamping area. Please revise sheets and reupload with the exact same name. This will version the new sheets as V2.

Thanks Tim Woodard
Application received  4/23/2012 DONE
Application submitted via PDS Online on Apr 23 2012 2:41PM