Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-00926
StatusFinaled
Name ROCKY MOUNTAIN GROUP INC
Site Address 357 N STEELHEAD WAY
Project NameSCP Sales Center 186
Customer Number 
ePlanReviewYes
Description
(SCP SALES CENTER) To remodel an existing 10,270 square foot office / warehouse tenant space that was created under BLD08-00549. Work is to include: [construction of new interior non-bearing walls to create two offices, open office area, separate sex accessible restrooms, a break room, and a communications room], installation of new lighting, installation of new plumbing, new mechanical ducting (existing RTU’s), and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/30/201211/1/2012 DONE
Third Notice 9/30/201210/16/2012 DONE
faxed
Second Notice 9/3/20129/25/2012 DONE
First Notice 8/3/20128/24/2012 DONE
Permanent Occupancy  7/24/2012 DONE
DetailsTisha Gallop
FIRE-Final Inspection7/23/20127/23/20127/23/2012PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final7/23/20127/23/20127/23/2012PPASS
DetailsMike Jordan
Mic Phone #: ###-####. POK for per occ. once fire/life/safety signs perm.
Plan Reviewer's activity  7/23/2012 DONE
DetailsTim L. Woodard
Approved revised floor plan in E-plan review. TLW
FIRE-Final Inspection7/20/20127/20/20127/20/2012PFAIL
DetailsTroy Cobbley
The exit signs and emergency lights in the warehouse area need to be finished and tested. Plans need to be resubmitted showing the actual wall layout.
BLD-Final7/20/20127/20/20127/20/2012PFAIL
DetailsMike Jordan
NICK Phone #: ###-####. Needs to submit plan mod showing the deletion of office and double doors. Also needs to have flusher on toilet installed on turning side. Provide special inspection report for racking and calll racking permit in for final. Ceiling grid ok to cover.
BLD-Framing/Rough-in7/2/20127/2/20127/2/2012PPART
DetailsJim Storey
Please call before....... Phone #: ###-#### >> Inspection requested via web by Mick Davis pending ele ri// ok to cover walls upon aproval// c/n isued to have ceilling covered to meet class c smoke/flame spread requirments.
FIRE-Conference6/25/20126/26/20126/26/2012ADONE
DetailsTroy Cobbley
Vic phone #: ###-#### Questions on insulation facing at the deck were deferred to Tim in plan review.
FIRE-Conference6/25/20126/25/20126/25/2012PDONE
DetailsForrest France
Please call prior -- Vic Phone #: ###-#### Conversation with contractor regarding IBC 719.1 and 719.3.
Print Occupancy Form  6/14/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  6/14/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  6/7/2012 DONE
DetailsBarbara Stitt
Routing - FIRE6/5/2012 6/5/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
PLANS/APPL TAKEN TO FRONT DESK  6/5/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)5/23/2012 6/5/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK5/23/2012 5/23/2012 PASS
DetailsTim L. Woodard
1st review completed  5/23/2012 PASS
DetailsTim L. Woodard
Routing - FIRE5/17/2012 5/21/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Intake Approval  5/15/2012 PASS
DetailsTim L. Woodard
Routing PW Sewer Rating5/15/2012 5/15/2012 PASS
DetailsConnie Baumgartner
Payment Received  4/27/2012 DONE
Payment received via Govolutions
Telephone call  4/27/2012  
DetailsRita DeYoung
sent email regarding plan intake fees
Application received  4/24/2012 DONE
Application submitted via PDS Online on Apr 24 2012 9:44AM