CHANGE STATUS TO (FNL) | | | 9/9/2016 | | DONE |
|
|
|
Passed Final on 6-14-2012. Case Summary was pulled 9-7-2016 and put permit back into RDY status
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/7/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/11/2013 | | DONE |
|
|
|
|
Third Notice | | 10/30/2012 | 10/18/2012 | | DONE |
|
|
|
This permit finaled on the web by Richard Schultz
|
Third Notice | | 9/30/2012 | 10/16/2012 | | DONE |
|
|
|
faxed
|
Second Notice | | 8/11/2012 | 9/25/2012 | | DONE |
|
|
|
faxed
|
First Notice | | 7/1/2012 | 8/1/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/21/2012 | | DONE |
Tisha Gallop
|
|
|
received inspection record card via fax from RA Schultz. Faxed back perm occ certificate.
|
BLD-Final | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Jim Storey
|
|
|
Thanks Matt. Phone #: ###-#### >> Inspection requested via web by Richard Schultz
|
BLD-Final | 6/12/2012 | 6/13/2012 | 6/13/2012 | P | FAIL |
Jim Storey
|
|
|
Thanks Matt. Phone #: ###-#### >> Inspection requested via web by Richard Schultz need handrail to mez.
|
FIRE-Final Inspection | 6/12/2012 | 6/12/2012 | 6/12/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 6/8/2012 | 6/11/2012 | 6/12/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety approved pending one PFE is provided at the mezzanine level and signage regarding max. floor load psf is posted per stamped plan annotations.
|
BLD-Framing/Rough-in | 5/30/2012 | 5/30/2012 | 5/30/2012 | P | PART |
Jim Storey
|
|
|
matt Phone #: ###-#### c/n posted// handrail 1 1/2 clearance required// landing not atched per plan// 6x22ga studs installed arch spec. 20ga
|
1st review completed | | | 5/23/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 5/23/2012 | | DONE |
Tisha Gallop
|
|
|
sent e-mail to Matt Rhees plan reveiwe complete, have GC contact permit desk.
|
Permit Ready to Issue | | | 5/23/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/23/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 5/8/2012 | | 5/23/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/8/2012 | | 5/23/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with construction type change and restriction on mezzanine. Refer to redlines on the drawings. TLW
|
Routing - FIRE | 5/8/2012 | | 5/9/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Addressing | 5/8/2012 | | 5/9/2012 | | PASS |
Terry Records
|
|
|
|
Payment Received | | | 5/8/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Intake Approval | | | 5/8/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2012 | | 5/8/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 5/8/2012 | | 5/8/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 4/25/2012 | | FAIL |
Jason Blais
|
|
|
This site is located in an M-1D zone. Please upload approval documentation from Planning & Zoning Design Review section for exterior changes.
|
Application received | | | 4/24/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 24 2012 10:04AM
|