Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-00940
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1000 W MYRTLE ST
Project NameJUMP-WALL SHORING
Customer Number 
ePlanReviewNo
Description
(JUMP) Permit to excavate, grub, compact site earth materials and shoring of the underground parking garage. No buildings are to be constructed or installed under this permit. Landscaping and striping are NOT included in this scope of work. Reference DRH10-00178
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  10/24/2017 DONE
DetailsChristina Prado
CHANGE STATUS TO (FNL)  10/24/2017 DONE
BLD-Final12/22/201612/22/201612/22/2016PPASS
DetailsDave Hannah
Requesting permit be finaled and closed. Phone #: ###-#### Inspection requested via web by Joe Borelli
PubWorks Occupancy Approval4/24/20144/24/20144/24/2014 DONE
DetailsTiffany Lowery
Routing PW Drainage4/18/2014 4/18/2014 PASS
DetailsBrian Murphy
CHANGE STATUS TO (ISS)  3/6/2014 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Permit Ready to Issue  2/18/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  2/18/2014 DONE
DetailsChristina Prado
Telephone call  2/18/2014 DONE
DetailsChristina Prado
called Noelle to advise permit is ready for pick up
Routing - Erosion and Sediment2/11/2014 2/13/2014 PASS
DetailsEvan Jenkins
activity added under bld12-01330. ACHD Approved prior to submission and approval by the City EEJ.
Routing Off Site - STRUCTURAL1/7/2014 1/8/2014 PASS
DetailsBarbara Stitt
E-mailed over structural review response comments-1-7-14
Plan resubmittals received  1/6/2014  
1-6-14 received 3 structural review response comments from Strata dated 12/27/13 inserted into plans after finding plans, scaning and emailing to outside engeineer///1-7-14
Routing Off Site - STRUCTURAL12/17/2013 12/27/2013 FAIL
DetailsJason Blais
Called Action Couriers for pick-up @ 9:00am

12/27/13 Emailed out correction items.
Routing - Erosion and Sediment12/17/2013 12/17/2013 FAIL
DetailsEvan Jenkins
Evan Jenkins

Contractor submitted reviesed Dewatering Plan from the Already approved plans from 10-3-13. Plans do not reference the Use of 2 Wier Tanks from Pretreatment Prior to discharging into the ACHD"s MS4 system. Also, Strata added 2 additional well points to discharge. The city and ACHD does not believe the MS4 will handle that amount of volume being discharged into the MS4. Contractor Shall recieve approval from ACHD PRIOR to submitting to the City for approval to ensure Hoffman Construction is meeting ACHD's Dewatering Requirments. --Evan Jenkins
Contractor to contact and work with Jason Korn with ACHD
Plan Modification Accepted  12/13/2013 DONE
DetailsTisha Gallop
Plan modification accepted for the shoring design and calculations for the Below-Grade Parking Garage Expansion. Sheets Plate 1a, Plate 1, Plate 2, Plate 3, Plate 4, Plate 5, calculations and NO new certificate of value or change in value.
CHANGE STATUS TO (ISS)  12/11/2013 DONE
(F) Reprint permit  12/11/2013 DONE
Inspection Record Card- Bld  11/26/2013 DONE
DetailsBarbara Stitt
Permit Ready to Issue  11/26/2013 DONE
DetailsBarbara Stitt
Plan assigned to (B_S) Barb9/13/2013 11/26/2013 DONE
DetailsBarbara Stitt
Routing PW Drainage11/25/2013 11/25/2013 PASS
Details
PLANS/APPL TAKEN TO FRONT DESK  11/25/2013 DONE
Details
CHANGE STATUS TO (REV)  11/23/2013  
Accidentally changed to "Fee" status
Routing - Erosion and Sediment11/21/2013 11/22/2013 PASS
DetailsAndy J. Long
No changes to previously approved ESC plan and dewatering plans for Phase I and II.
PLANS/APPL TAKEN TO FRONT DESK  11/22/2013 DONE
Print Statement  11/22/2013 DONE
DetailsBarbara Stitt
Routing - PUBLIC WORKS11/15/2013 11/21/2013 PASS
DetailsConnie Baumgartner
Routing PW Drainage11/15/2013 11/21/2013 FAIL
NEEDS INFILRATION BED 1 TO BE CONSTRUCTED.
Routing - PLAN CHECK10/11/2013 11/15/2013 PASS
DetailsBarbara Stitt
Plan resubmittals received  11/14/2013  
11-14-13 received 2 comment,2 site drainage,2 o & m and 2 copies of sheets CG1-01-0,CG1-02-0,CG1-02-1,CG1-03-0,CG1-04-0,CG1-05-0,CG-02-0,CG, C2-03-N sent to Barbara Stitt
Routing Off Site - STRUCTURAL10/8/2013 10/14/2013 PASS
DetailsBarbara Stitt
Called Action Courier for pick up @2:15pm on 10-8-13--Passed see scanned documents
Routing PW Drainage10/9/2013 10/11/2013 FAIL
DetailsBrian Murphy
NEED CACL ,SEEPAGE BEDS ON PLAN ,DETAILS AND O AND M REVISIONS.
Routing PW Environmental10/11/2013 10/11/2013 CANC
DetailsWalt Baumgartner
Routing - PUBLIC WORKS10/8/2013 10/11/2013 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy for drainage issues.
Routing - Erosion and Sediment10/11/2013 10/11/2013 PASS
DetailsEvan Jenkins
Dewatering Modification Approved
Routing - Addressing10/9/2013 10/9/2013 PASS
DetailsJason C. Taylor
Plan resubmittals received  10/8/2013  
Received 2 copies of Dewatering Narrative for ESC, 3 copies of structural shoring letter/calcs, 3 copies of Temporary Shoring Jump Phase 2 sheets Plate 6, 2 copies of Site Drainage Report, O & M Manual, 2 copies of sheets CG1-01-0, CG1-02-0, CG1-02-1, CG1-03-0, CG1-04-0, CG1-05-0, CG2-01-0, CG2-02-0, c2-03-N, C2-03-S
Routing - Erosion and Sediment10/2/2013 10/3/2013 PASS
DetailsEvan Jenkins
ESC plan approved but dewatering aspect is not approved. Must gain approval from ACHD prior to the City's approval.
Routing Off Site - STRUCTURAL9/13/2013 10/1/2013 FAIL
DetailsBarbara Stitt
9-9-13 called Action Couriers for pick up
Routing - FRONT DESK9/19/2013 10/1/2013 FAIL
DetailsBarbara Stitt
Off site structural review failed and needs resubmittals see scanned documents, Emailed Noelle to inform her about this on 10-1-13 @ 2:15pm///BAS
Plan resubmittals received  10/1/2013 DONE
DetailsTisha Gallop
received resubs in response to comments from plan modification submitted on 9/13/13; received two copies of SWPP and ESC plan sheet CG1-01-0, CG1-02-0, CG1-02-1, CG2-01-0, two copies of Drainage Report, O & M Manual,
Routing - Erosion and Sediment9/17/2013 9/18/2013 FAIL
DetailsJason C. Taylor
ESC Plan is not acceptable as submitted. Revisions are to be made and resubmitted to the front counter. Jason Taylor ###-####.
Routing PW Sewer Design9/16/2013 9/17/2013 PASS
DetailsKyle S. Rosenmeyer
Check schedule for construction of Phase 2 sewer service off of 9th street. Possible conflict with temporary shoring wall.
Routing - PUBLIC WORKS GRADING9/16/2013 9/17/2013 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy for drainage issues
Plan Modification Accepted  9/13/2013  
Plan modification excepted for BLD12-00940 for Shoring design & calculations for the Below-Grade Parking Garage Expansion. pages 1A,1-6 & Calcs sent to CH2MHILL,Brian M, & ESC
Routing PW Drainage4/26/2012 9/17/2012 FAIL
DetailsBrian Murphy
NEED CALCS,ACHD OK,NEW CIVIL PLAN AND DRIANAGE REPORT
BLD-Other8/14/20128/15/20128/15/2012ANR
DetailsDave Hannah
temp shoreing - Noelle Phone #: ###-####
CHANGE STATUS TO (ISS)  8/14/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  8/14/2012 DONE
DetailsBarbara Stitt
Plan assigned to (B_S) Barb8/2/2012 8/13/2012 DONE
DetailsBarbara Stitt
Routing Off Site - STRUCTURAL8/2/2012 8/13/2012 PASS
DetailsBarbara Stitt
Called Action Couier for pick up @ 10:15am
Override - Parcel Holds  8/13/2012  
Case Summary (BLD)  8/13/2012 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/13/2012 DONE
DetailsBarbara Stitt
Telephone call  8/13/2012 DONE
DetailsBarbara Stitt
Called Noelle and told her that permit is ready & fees due on 8-13-12 @ 2:10pm//BAS
Plan Modification Accepted  8/2/2012  
Plan Modifiacation accepted for revision of shoring wall design to incorporate depth of elevator pit/footing near grid GE/G21.
CHANGE STATUS TO (ISS)  6/14/2012 DONE
DetailsBarbara Stitt
Issued plan modification 6-14-12
Issue PAID IN FULL permit  6/14/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  6/14/2012 DONE
DetailsBarbara Stitt
Plan assigned to (B_S) Barb6/7/2012 6/13/2012 DONE
DetailsBarbara Stitt
Barb Stitt
Routing Off Site - STRUCTURAL6/7/2012 6/13/2012 PASS
DetailsChristina Prado
Called Action Courier for pick up on 6-7-12 @ 8:20am
PLANS/APPL TAKEN TO FRONT DESK  6/13/2012 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/13/2012 DONE
DetailsChristina Prado
Telephone call  6/13/2012 DONE
DetailsChristina Prado
called Noelle to advise permit is ready and fees are due
Permit Ready to Issue  6/13/2012 DONE
DetailsChristina Prado
Plan Modification Accepted  6/5/2012  
Plan modification accepted for revised shoring wall design. 3 sets of the sheets marked Plate 1, Plate 2, Plate 3, Plate 4, 3 sets of calcs, with the application and no change in value.
Issue PAID IN FULL permit  5/17/2012 DONE
DetailsChristina Prado
CHANGE ISSUED DATE  5/17/2012 DONE
Barb reissued permit in error
Permit Ready to Issue  5/16/2012 DONE
DetailsBarbara Stitt
Telephone call  5/16/2012 DONE
DetailsBarbara Stitt
Called Noelle Spencer and told her that permit is ready, that we DO need the bond and bond agreement brought down at the same time she picks up the permit, I also told her that permit fees due//on 5-16-12 @ 12:15pm//BAS
Inspection Record Card- Bld  5/16/2012 DONE
DetailsBarbara Stitt
Routing - Erosion and Sediment5/8/2012 5/15/2012 PASS
DetailsClint A Smith
ESC12-00403 plan approved with conditions attached to the permit.
Routing - PLAN CHECK5/15/2012 5/15/2012 PASS
DetailsBarbara Stitt
Plan resubmittals received  5/15/2012 DONE
DetailsTisha Gallop
received two copes of SWPPP and plan sheets CG1-01-0, CG1-02-0, CG2-01-0; put with plan already in Erosion.
PLANS/APPL TAKEN TO FRONT DESK  5/15/2012 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  5/15/2012 DONE
DetailsBarbara Stitt
Plan assigned to (B_S) Barb4/25/2012 5/15/2012 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK5/3/2012 5/8/2012 PEND
DetailsBarbara Stitt
Plan resubmittals received  5/8/2012 DONE
DetailsChristina Prado
Received two sets of Stormwater Pollution Prevention Plan/ESC Plan and two sets of plans marked CG1-01-0, CG1-02-0 & CG2-01-0.
1st review completed  5/3/2012 FAIL
DetailsJason Blais
Failed Erosion & Sediment Control review.
Routing Off Site - STRUCTURAL4/26/2012 5/3/2012 PASS
DetailsJason Blais
Called Action Couirer for pick up on 4-26-12 @ 9:30am//BAS

5/3/12 Received notification from outside structural engineer that plans have passed review. No comments provided.
Routing - PLAN CHECK5/2/2012 5/3/2012 PEND
DetailsBarbara Stitt
Barb Stitt
Routing - FIRE5/3/2012 5/3/2012 PASS
DetailsScott Arellano
No comments attached.
Routing - PLANNING5/2/2012 5/2/2012 PASS
DetailsSarah Schafer
Approved per DRH10-00178.
Routing - Erosion and Sediment4/30/2012 5/2/2012 FAIL
DetailsClint A Smith
ESC plan failed. Does not meet the requirements of ESC plan checklist. Must also be designed by a valid certified Plan designer. Left a message with the applicant (Mark Bowen).
Routing PW Sewer Design4/27/2012 4/30/2012 PASS
DetailsJon R. Gunnerson
Connect sanitary service line into existing SSMH 73A.
Routing - PUBLIC WORKS4/26/2012 4/30/2012 PASS
DetailsConnie Baumgartner
Routing PW Street Lights4/27/2012 4/27/2012 PASS
DetailsMike D Hedge
Need to retain and protect all street lights and conduits.
Application received 4/25/20124/25/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/25/2012 DONE
DetailsBarbara Stitt
Intake Approval  4/25/2012 PASS
DetailsBarbara Stitt
Routing - PLANNING Land Div4/25/2012 4/25/2012 PASS
DetailsTodd Tucker
Plan assigned to (B_S) Barb12/17/2013    
DetailsBarbara Stitt
Plan modification
Routing - PLAN CHECK1/7/2014    
DetailsBarbara Stitt
Barb Stitt