Letter of compliance/Occupancy | | | 10/24/2017 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (FNL) | | | 10/24/2017 | | DONE |
|
|
|
|
BLD-Final | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Dave Hannah
|
|
|
Requesting permit be finaled and closed. Phone #: ###-#### Inspection requested via web by Joe Borelli
|
PubWorks Occupancy Approval | 4/24/2014 | 4/24/2014 | 4/24/2014 | | DONE |
Tiffany Lowery
|
|
|
|
Routing PW Drainage | 4/18/2014 | | 4/18/2014 | | PASS |
Brian Murphy
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/6/2014 | | DONE |
Tisha Gallop
|
|
|
picked up and paid for plan mod
|
Permit Ready to Issue | | | 2/18/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/18/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 2/18/2014 | | DONE |
Christina Prado
|
|
|
called Noelle to advise permit is ready for pick up
|
Routing - Erosion and Sediment | 2/11/2014 | | 2/13/2014 | | PASS |
Evan Jenkins
|
|
|
activity added under bld12-01330. ACHD Approved prior to submission and approval by the City EEJ.
|
Routing Off Site - STRUCTURAL | 1/7/2014 | | 1/8/2014 | | PASS |
Barbara Stitt
|
|
|
E-mailed over structural review response comments-1-7-14
|
Plan resubmittals received | | | 1/6/2014 | | |
|
|
|
1-6-14 received 3 structural review response comments from Strata dated 12/27/13 inserted into plans after finding plans, scaning and emailing to outside engeineer///1-7-14
|
Routing Off Site - STRUCTURAL | 12/17/2013 | | 12/27/2013 | | FAIL |
Jason Blais
|
|
|
Called Action Couriers for pick-up @ 9:00am
12/27/13 Emailed out correction items.
|
Routing - Erosion and Sediment | 12/17/2013 | | 12/17/2013 | | FAIL |
Evan Jenkins
|
|
|
Evan Jenkins
Contractor submitted reviesed Dewatering Plan from the Already approved plans from 10-3-13. Plans do not reference the Use of 2 Wier Tanks from Pretreatment Prior to discharging into the ACHD"s MS4 system. Also, Strata added 2 additional well points to discharge. The city and ACHD does not believe the MS4 will handle that amount of volume being discharged into the MS4. Contractor Shall recieve approval from ACHD PRIOR to submitting to the City for approval to ensure Hoffman Construction is meeting ACHD's Dewatering Requirments. --Evan Jenkins
Contractor to contact and work with Jason Korn with ACHD
|
Plan Modification Accepted | | | 12/13/2013 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for the shoring design and calculations for the Below-Grade Parking Garage Expansion. Sheets Plate 1a, Plate 1, Plate 2, Plate 3, Plate 4, Plate 5, calculations and NO new certificate of value or change in value.
|
CHANGE STATUS TO (ISS) | | | 12/11/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/11/2013 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 11/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 9/13/2013 | | 11/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing PW Drainage | 11/25/2013 | | 11/25/2013 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/23/2013 | | |
|
|
|
Accidentally changed to "Fee" status
|
Routing - Erosion and Sediment | 11/21/2013 | | 11/22/2013 | | PASS |
Andy J. Long
|
|
|
No changes to previously approved ESC plan and dewatering plans for Phase I and II.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2013 | | DONE |
|
|
|
|
Print Statement | | | 11/22/2013 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PUBLIC WORKS | 11/15/2013 | | 11/21/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 11/15/2013 | | 11/21/2013 | | FAIL |
|
|
|
NEEDS INFILRATION BED 1 TO BE CONSTRUCTED.
|
Routing - PLAN CHECK | 10/11/2013 | | 11/15/2013 | | PASS |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 11/14/2013 | | |
|
|
|
11-14-13 received 2 comment,2 site drainage,2 o & m and 2 copies of sheets CG1-01-0,CG1-02-0,CG1-02-1,CG1-03-0,CG1-04-0,CG1-05-0,CG-02-0,CG, C2-03-N sent to Barbara Stitt
|
Routing Off Site - STRUCTURAL | 10/8/2013 | | 10/14/2013 | | PASS |
Barbara Stitt
|
|
|
Called Action Courier for pick up @2:15pm on 10-8-13--Passed see scanned documents
|
Routing PW Drainage | 10/9/2013 | | 10/11/2013 | | FAIL |
Brian Murphy
|
|
|
NEED CACL ,SEEPAGE BEDS ON PLAN ,DETAILS AND O AND M REVISIONS.
|
Routing PW Environmental | 10/11/2013 | | 10/11/2013 | | CANC |
Walt Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 10/8/2013 | | 10/11/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy for drainage issues.
|
Routing - Erosion and Sediment | 10/11/2013 | | 10/11/2013 | | PASS |
Evan Jenkins
|
|
|
Dewatering Modification Approved
|
Routing - Addressing | 10/9/2013 | | 10/9/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 10/8/2013 | | |
|
|
|
Received 2 copies of Dewatering Narrative for ESC, 3 copies of structural shoring letter/calcs, 3 copies of Temporary Shoring Jump Phase 2 sheets Plate 6, 2 copies of Site Drainage Report, O & M Manual, 2 copies of sheets CG1-01-0, CG1-02-0, CG1-02-1, CG1-03-0, CG1-04-0, CG1-05-0, CG2-01-0, CG2-02-0, c2-03-N, C2-03-S
|
Routing - Erosion and Sediment | 10/2/2013 | | 10/3/2013 | | PASS |
Evan Jenkins
|
|
|
ESC plan approved but dewatering aspect is not approved. Must gain approval from ACHD prior to the City's approval.
|
Routing Off Site - STRUCTURAL | 9/13/2013 | | 10/1/2013 | | FAIL |
Barbara Stitt
|
|
|
9-9-13 called Action Couriers for pick up
|
Routing - FRONT DESK | 9/19/2013 | | 10/1/2013 | | FAIL |
Barbara Stitt
|
|
|
Off site structural review failed and needs resubmittals see scanned documents, Emailed Noelle to inform her about this on 10-1-13 @ 2:15pm///BAS
|
Plan resubmittals received | | | 10/1/2013 | | DONE |
Tisha Gallop
|
|
|
received resubs in response to comments from plan modification submitted on 9/13/13; received two copies of SWPP and ESC plan sheet CG1-01-0, CG1-02-0, CG1-02-1, CG2-01-0, two copies of Drainage Report, O & M Manual,
|
Routing - Erosion and Sediment | 9/17/2013 | | 9/18/2013 | | FAIL |
Jason C. Taylor
|
|
|
ESC Plan is not acceptable as submitted. Revisions are to be made and resubmitted to the front counter. Jason Taylor ###-####.
|
Routing PW Sewer Design | 9/16/2013 | | 9/17/2013 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Check schedule for construction of Phase 2 sewer service off of 9th street. Possible conflict with temporary shoring wall.
|
Routing - PUBLIC WORKS GRADING | 9/16/2013 | | 9/17/2013 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy for drainage issues
|
Plan Modification Accepted | | | 9/13/2013 | | |
|
|
|
Plan modification excepted for BLD12-00940 for Shoring design & calculations for the Below-Grade Parking Garage Expansion. pages 1A,1-6 & Calcs sent to CH2MHILL,Brian M, & ESC
|
Routing PW Drainage | 4/26/2012 | | 9/17/2012 | | FAIL |
Brian Murphy
|
|
|
NEED CALCS,ACHD OK,NEW CIVIL PLAN AND DRIANAGE REPORT
|
BLD-Other | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | NR |
Dave Hannah
|
|
|
temp shoreing - Noelle Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 8/2/2012 | | 8/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Off Site - STRUCTURAL | 8/2/2012 | | 8/13/2012 | | PASS |
Barbara Stitt
|
|
|
Called Action Couier for pick up @ 10:15am
|
Override - Parcel Holds | | | 8/13/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 8/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 8/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/13/2012 | | DONE |
Barbara Stitt
|
|
|
Called Noelle and told her that permit is ready & fees due on 8-13-12 @ 2:10pm//BAS
|
Plan Modification Accepted | | | 8/2/2012 | | |
|
|
|
Plan Modifiacation accepted for revision of shoring wall design to incorporate depth of elevator pit/footing near grid GE/G21.
|
CHANGE STATUS TO (ISS) | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
Issued plan modification 6-14-12
|
Issue PAID IN FULL permit | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 6/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 6/7/2012 | | 6/13/2012 | | DONE |
Barbara Stitt
|
|
|
Barb Stitt
|
Routing Off Site - STRUCTURAL | 6/7/2012 | | 6/13/2012 | | PASS |
Christina Prado
|
|
|
Called Action Courier for pick up on 6-7-12 @ 8:20am
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 6/13/2012 | | DONE |
Christina Prado
|
|
|
called Noelle to advise permit is ready and fees are due
|
Permit Ready to Issue | | | 6/13/2012 | | DONE |
Christina Prado
|
|
|
|
Plan Modification Accepted | | | 6/5/2012 | | |
|
|
|
Plan modification accepted for revised shoring wall design. 3 sets of the sheets marked Plate 1, Plate 2, Plate 3, Plate 4, 3 sets of calcs, with the application and no change in value.
|
Issue PAID IN FULL permit | | | 5/17/2012 | | DONE |
Christina Prado
|
|
|
|
CHANGE ISSUED DATE | | | 5/17/2012 | | DONE |
|
|
|
Barb reissued permit in error
|
Permit Ready to Issue | | | 5/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 5/16/2012 | | DONE |
Barbara Stitt
|
|
|
Called Noelle Spencer and told her that permit is ready, that we DO need the bond and bond agreement brought down at the same time she picks up the permit, I also told her that permit fees due//on 5-16-12 @ 12:15pm//BAS
|
Inspection Record Card- Bld | | | 5/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 5/8/2012 | | 5/15/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00403 plan approved with conditions attached to the permit.
|
Routing - PLAN CHECK | 5/15/2012 | | 5/15/2012 | | PASS |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 5/15/2012 | | DONE |
Tisha Gallop
|
|
|
received two copes of SWPPP and plan sheets CG1-01-0, CG1-02-0, CG2-01-0; put with plan already in Erosion.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (B_S) Barb | 4/25/2012 | | 5/15/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 5/3/2012 | | 5/8/2012 | | PEND |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 5/8/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of Stormwater Pollution Prevention Plan/ESC Plan and two sets of plans marked CG1-01-0, CG1-02-0 & CG2-01-0.
|
1st review completed | | | 5/3/2012 | | FAIL |
Jason Blais
|
|
|
Failed Erosion & Sediment Control review.
|
Routing Off Site - STRUCTURAL | 4/26/2012 | | 5/3/2012 | | PASS |
Jason Blais
|
|
|
Called Action Couirer for pick up on 4-26-12 @ 9:30am//BAS
5/3/12 Received notification from outside structural engineer that plans have passed review. No comments provided.
|
Routing - PLAN CHECK | 5/2/2012 | | 5/3/2012 | | PEND |
Barbara Stitt
|
|
|
Barb Stitt
|
Routing - FIRE | 5/3/2012 | | 5/3/2012 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - PLANNING | 5/2/2012 | | 5/2/2012 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH10-00178.
|
Routing - Erosion and Sediment | 4/30/2012 | | 5/2/2012 | | FAIL |
Clint A Smith
|
|
|
ESC plan failed. Does not meet the requirements of ESC plan checklist. Must also be designed by a valid certified Plan designer. Left a message with the applicant (Mark Bowen).
|
Routing PW Sewer Design | 4/27/2012 | | 4/30/2012 | | PASS |
Jon R. Gunnerson
|
|
|
Connect sanitary service line into existing SSMH 73A.
|
Routing - PUBLIC WORKS | 4/26/2012 | | 4/30/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 4/27/2012 | | 4/27/2012 | | PASS |
Mike D Hedge
|
|
|
Need to retain and protect all street lights and conduits.
|
Application received | | 4/25/2012 | 4/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 4/25/2012 | | PASS |
Barbara Stitt
|
|
|
|
Routing - PLANNING Land Div | 4/25/2012 | | 4/25/2012 | | PASS |
Todd Tucker
|
|
|
|
Plan assigned to (B_S) Barb | 12/17/2013 | | | | |
Barbara Stitt
|
|
|
Plan modification
|
Routing - PLAN CHECK | 1/7/2014 | | | | |
Barbara Stitt
|
|
|
Barb Stitt
|