Information based on query as of Tuesday, September 17, 2024.
Permit Information
Permit NumberBLD12-00981
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 554 N STEELHEAD WAY Unit: 120
Project NameLIFE
Customer Number 
ePlanReviewNo
Description
(LIFE - EMERALD CORPORATE PARK #4 - STE 120) To remodel a 2,754 sq.ft. office space for a new office tenant. This tenant space was built out under BLD07-01297 as a “Vanilla Finish”. This permit will establish occupancy for a new tenant and create an accessible shower. Work to include: construction of new interior walls to define new shower room, new electrical, new plumbing, new cabinetry, new accessible door / hardware, and interior finishes in compliance with Ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/30/201210/16/2012 DONE
This permit finaled on the web by Richard Schultz
Second Notice 8/11/20129/25/2012 DONE
faxed
First Notice 7/22/20128/1/2012 DONE
Permanent Occupancy  7/12/2012 DONE
DetailsChristina Prado
BLD-Final7/10/20127/11/20127/11/2012APASS
DetailsMike Jordan
Thanks Matt. Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Ok for perm occ.
BLD-Conference6/26/20126/26/20126/26/2012PPASS
DetailsMike Jordan
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz/// need to resolve address issues on building if possible. OK for perm occ. Will need to work address issue with landlord. Permit address and building adress match.
BLD-Final6/25/20126/26/20126/26/2012APART
DetailsTony Young
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz,, water fountain is ok,,, address on suite to north is also 120,, set conf to 450
BLD-Final6/12/20126/12/20126/12/2012PPART
DetailsMike Jordan
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Ok for temp occ until drinking fountain bumper shroud on high side has been installed.
FIRE-Alarm Testing6/11/20126/12/20126/12/2012PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in5/24/20125/25/20125/25/2012PPASS
DetailsTom Arcoraci
Any questions call Matt Thanks. Phone #: ###-#### >> Inspection requested via web by Richard Schultz
FIRE-Sprinkler Rough-in5/25/20125/25/20125/25/2012PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover in the restroom.
Issue PAID IN FULL permit  5/17/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)4/30/2012 5/10/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/1/2012 5/10/2012 PASS
DetailsTim L. Woodard
Approved with redline. TLW
1st review completed  5/10/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/10/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/10/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/10/2012 DONE
Telephone call  5/10/2012  
5-10-12 called James left message permit ready and fee given Also need GC
Permit Ready to Issue  5/10/2012  
Routing - PUBLIC WORKS4/30/2012 5/1/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating5/1/2012 5/1/2012 PASS
DetailsConnie Baumgartner
Application received 4/27/20124/30/2012 DONE
DetailsAlexandra L. DeYoung
Routing - Addressing4/30/2012 4/30/2012 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  4/27/2012 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  4/27/2012 DONE
DetailsAlexandra L. DeYoung