Permanent Occupancy | | | 5/31/2012 | | DONE |
|
|
|
|
BLD-Final | 5/25/2012 | 5/29/2012 | 5/29/2012 | A | PASS |
Mike Jordan
|
|
|
Dennis Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 5/25/2012 | 5/25/2012 | 5/25/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Plan Reviewer's activity | | | 5/24/2012 | | PASS |
|
|
|
Based on the information supplied and the fire sprinkler analysis perfromed by SimplexGrinnell the existing fire sprinkler system is adequate.
The storage will be foam mattress <= 5' in height. Per NFPA this storage commodity (Group A) plastics requires Ordinary Hazard II. The existing system was designed for .295/2000 which exceeds Ordinary Group II. (See attached)
|
BLD-Final | 5/7/2012 | 5/8/2012 | 5/8/2012 | A | NR |
Mike Jordan
|
|
|
ryan 704-. Fire/life/safety failed.
|
FIRE-Final Inspection | 5/7/2012 | 5/7/2012 | 5/7/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the north exit door. Provide verification that the existing fire sprinkelr system is adequate for the commodity being stored. I found encapsulated foam mattresses stored (sollid pile) around 8'. Per the owner this is temporary and actual storage height will be at 4'.
|
Issue PAID IN FULL permit | | | 5/7/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 5/1/2012 | | 5/4/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/1/2012 | | 5/4/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/4/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2012 | | |
|
|
|
|
Telephone call | | | 5/4/2012 | | |
|
|
|
5-4-12 called left message for Dennis permit ready for pick up ///dld
|
Plans ACCEPTED BY PLAN TECH | | | 5/1/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/1/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/1/2012 | | | |
|
|
|
|