BLD-Final | 8/22/2012 | 8/23/2012 | 8/23/2012 | A | DONE |
Tony Young
|
|
|
Luke Phone #: ###-####
|
DOC - Permit Finaled | 8/23/2012 | 8/23/2012 | 8/23/2012 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | NR |
Tony Young
|
|
|
Luke Phone #: ###-####,, needs smoke detectors in existing house
|
BLD-Energy code compliance | 6/18/2012 | 6/19/2012 | 6/19/2012 | A | PASS |
Tony Young
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | PART |
Tony Young
|
|
|
Mike Phone #: ###-####,, need to strap the corner and need the seal pack
|
BLD-Wall Bracing | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | PASS |
Tony Young
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 5/17/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Tony Young
|
|
|
Luke Larsen Phone #: ###-####
|
BLD-Footing | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Tony Young
|
|
|
Early am if possible please-Like Larsen Phone #: ###-####
|
PubWorks Subgrade Approval | 5/16/2012 | 5/16/2012 | 5/16/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer.
|
Routing Walk-In (BLD) | 5/1/2012 | 5/1/2012 | 5/3/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/1/2012 | 5/1/2012 | 5/3/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 5/3/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2012 | | |
|
|
|
|
1st review completed | | | 5/3/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2012 | | |
|
|
|
|
Telephone call | | | 5/3/2012 | | |
|
|
|
5-3-12 called Chris permit ready and fee given ///dld
|
Issue PAID IN FULL permit | | | 5/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 5/1/2012 | | 5/2/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00435 plan waiver approved with conditions attached to the permit.
|
Routing Walk-In (PW Hillside) | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Joshua Johnson
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Routing Walk-In (Zoning) | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 5/1/2012 | | | |
|
|
|
|