Permit Information
Permit NumberBLD12-01027
StatusFinaled
Name EKC INC
Site Address 450 W McGREGOR DR
Project NameCAMPBELL & COMPANY
Customer Number 
ePlanReviewNo
Description
(CAMPBELL & COMPANY - 2ND STORY ADDITION) (10-19-12 PLAN MODIFICATION TO CREATE AN ADDITIONAL RESTROOM [2 TOTAL] ON THE 2ND STORY AND TO CONSTRUCT A JANITOR’S CLOSET. THE SHOWER PAN WITHIN THE JANITOR’S CLOSET IS NOT APPROVED AS A SHOWER AND SHALL NOT HAVE A SHOWER HEAD INSTALLED. ALSO, TO CREATE 3 OFFICES ON THE 2ND STORY AND TO RECONFIGURE THE 1-HR STAIRWAY ENCLOSURE ON THE 2ND STORY.) This building does not have a fire sprinkler system. To create a 6,460 square foot tenant space (3,825 square foot 1st story and 2,635 square foot 2nd story) within an existing building. The total first story floor area of this existing building is 9,726 square feet and the total 2nd story floor area will be 4,585 square feet (14,311 square feet total building area). The existing 424 square foot upper level of this new tenant space will be expanded by 2,211 square feet. A 3-hr fire barrier wall will be constructed to separate the North tenant space (5,925 square foot 1st story and 1,950 square foot 2nd story) from this South tenant space (3,825 square foot 1st story and 2,635 square foot 2nd story) so that the fire area will be less than 12,000 square feet and a fire sprinkler system will not be required. To avoid an elevator within this building, this South tenant space was considered to be independent of the North tenant space for the application of the elevator exception. No doors are allowed in the fire barrier separating the 2 tenant spaces. Structural work is to include concrete footings, steel columns, steel beams, steel floor joists, steel pan deck, concrete floor, steel stud bearing walls, and stairways with steel stringers and concrete filled stair pans. Special Inspection is required for concrete, welding, bolting, and epoxy anchors. The design for the new bar joists is a deferred submittal item. Other work includes a restroom accessible to the disabled, interior nonbearing walls, a 1-hr fire-resistance-rated stairway enclosure, and interior finishes. The structure that supports any portion of the 1-hr stairway enclosure (i.e. columns, beams, joists, bearing walls, floors) or is part of the 1-hr stairway enclosure (i.e. floors, walls) are also required to be of 1-hr fire-resistance-rated construction. Approved fire-resistance-rated assemblies shall be provided to the Structural Inspector. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy only for the tenant space located South of the 3-hr fire barrier wall. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/29/2014 DONE
Third Notice 2/26/20132/21/2013 DONE
Third Notice 2/3/20132/21/2013 DONE
faxed and mailed
Third Notice 1/8/20131/29/2013 DONE
faxed to EKC
Second Notice 12/13/20121/3/2013 DONE
faxed to EKC
First Notice 11/30/201212/3/2012 DONE
DetailsChristina Prado
mailed 12-4-12
BLD-Final11/20/201211/21/201211/20/2012APASS
DetailsJim Storey
james Phone #: ###-####
BLD-Final11/20/201211/20/201211/20/2012PPASS
DetailsJim Storey
Permanent Occupancy  11/20/2012 DONE
BLD-Final11/16/201211/19/201211/19/2012APART
DetailsJim Storey
James Phone #: ###-#### temp ok pending top of wall fire stopping./ si final sign off.
FIRE-Final Inspection11/16/201211/16/201211/16/2012PPASS
DetailsForrest France
Fire life safety inspection passed.
Zoning Approval11/16/201211/16/201211/16/2012 DONE
DetailsAndrea Tuning
BLD-Framing/Rough-in11/13/201211/13/201211/13/2012PPART
DetailsJim Storey
Fire wall - James Phone #: ###-#### seal head of wall at bar joist and roof purlin.
OVERRIDE  10/24/2012  
Plan assigned to (CJW)10/16/201210/16/201210/24/2012 PASS
DetailsCarl Westfall
plan mod - Campbell and co (10/16)
Routing - PLAN CHECK10/22/2012 10/24/2012 DONE
DetailsCarl Westfall
Print Occupancy Form  10/24/2012 DONE
DetailsTisha Gallop
Telephone call  10/24/2012 DONE
DetailsChristina Prado
E-mail sent
Telephone call  10/24/2012 DONE
DetailsTisha Gallop
e-mailed Adam Garcia that plan mod is ready and fees due.
CHANGE STATUS TO (ISS)  10/24/2012 DONE
(F) Reprint permit  10/24/2012 DONE
Routing PW Sewer Rating10/19/2012 10/22/2012 PASS
DetailsConnie Baumgartner
Additional fixtures on the 2nd story,
Routing - Addressing10/22/2012 10/22/2012 PASS
DetailsApril Wing
Routing - PLAN CHECK10/16/2012 10/19/2012 PASS
DetailsCarl Westfall
Plan Modification Accepted  10/16/2012 DONE
DetailsTisha Gallop
Plan modification accepted for Bld12-01027 (Campbell & Company) to provide additional toilet room, enlarging janitors room, adding built-in breakfast bar and filling the "Future Office" space with office rooms. All on the second floor; submitted on revised cert of value and plan sheets T2.0, A2.1, A3.0, M1.0, M2.0, M3.0, M4.0, E0.1, E2.1; routed to Carl Westfall.
BLD-Framing/Rough-in10/12/201210/12/201210/12/2012PPASS
DetailsJim Storey
James Phone #: ###-#### mez and stairs ok
BLD-Framing/Rough-in9/13/20129/14/20129/14/2012APASS
DetailsJim Storey
structural and fire wall//James Phone #: ###-#### fire wall ok// bearing wall for mez ok
BLD-Other9/12/20129/13/20129/13/2012PNR
DetailsJim Sly
JAMES LATE AS POSSIBLE Phone #: ###-####
Met with James Wall not ready.......Holes and breaches to be addressed. Gutter? and behind purlin.........
BLD-Framing/Rough-in9/12/20129/13/20129/13/2012PPART
DetailsJim Sly
JAMES Phone #: ###-####
Told James that new steel stud wall ......Located at North wall in South room .....should be OK. as you will still be able to look at it when you go out next. They want to hang steel and joists on it.
BLD-Framing/Rough-in8/28/20128/29/20128/29/2012APART
DetailsJim Storey
Sheetrock for fire wall - James Phone #: ###-#### 3hr wall gyp progression ok // need arh to provide top of wall detail / si contract to be provided// wall and floor sys to have wall continued thru.
Issue PAID IN FULL permit  8/17/2012 DONE
DetailsBarbara Stitt
OVERRIDE  8/8/2012  
Print Occupancy Form  8/8/2012 DONE
Telephone call  8/8/2012 DONE
DetailsChristina Prado
Called Adam and gave fees due and advised GC Form & ACHD are required prior to issuance
Permit Ready to Issue  8/8/2012 DONE
DetailsChristina Prado
Plan assigned to (CJW)5/7/20125/7/20128/7/2012 PASS
DetailsCarl Westfall
CAMPBELL & COMPANY (20 days - May 31)
Routing - PLAN CHECK8/6/2012 8/7/2012 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  8/7/2012 DONE
Routing - Design Review8/6/2012 8/6/2012 PASS
DetailsSarah Schafer
Approved. Office space is not to exceed 25% of the tenant floor area unless a conditional use permit is obtained.
Routing - PLAN CHECK6/4/2012 8/6/2012 PASS
DetailsCarl Westfall
(7-24-12) Completed the resubmittal review. Waiting for the Consultant to finish his. More information needed. (7-26-12) Sent the Project Structural Engineer's response to the Consultant Structural Engineer. Had to split it into 3 separate files because it was too big. Sent 3 separate Emails. (8-6-12) Drawings approved after 3rd review by the Consultant Structural Engineer.
Routing Off Site - STRUCTURAL7/26/2012 8/3/2012 PASS
DetailsCarl Westfall
All issues resolved
Routing Off Site - STRUCTURAL7/20/2012 7/25/2012 FAIL
DetailsCarl Westfall
Several items were not addressed.
Plan resubmittals received  7/25/2012  
Response from project Structural Engineer
Telephone call  7/20/2012 DONE
DetailsTisha Gallop
called action couriers for pick up of resub from 7/18
Plan resubmittals received  7/18/2012 DONE
DetailsTisha Gallop
received response letter from architect, response letter from engineer, three copies of plan sheets T1.0, T2.0, T3.0, A1.0, A1.1, A2.0, A2.1, A3.0, M1.0, M2.0, M3.0, M4.0, E0.0, E0.1, E2.1; taken to Carl Westfall.
Routing - FIRE5/31/20125/31/20126/4/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/4/2012 FAIL
Failed Design Review, Structural, Plan Checke
Route to Impact Fee Review5/31/20126/5/20126/1/2012 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/11/2012 5/31/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 29 and was finished on May 31. Revised drawings were required. See the plan review report.
Routing Off Site - STRUCTURAL5/9/2012 5/17/2012 FAIL
DetailsCarl Westfall
Routing - Design Review5/10/2012 5/11/2012 FAIL
DetailsSarah Schafer
Sarah Schafer - Exterior wall infill - new 2nd floor office in M-1D

The office space exceeds 25% of the floor plan. Per ordinance it must be seen as accessory. I have notified Adam Garcia and he will let us know how he wants to proceed. He may be submitting a Conditional Use Permit for approval.
Routing - Erosion and Sediment5/9/2012 5/10/2012 PASS
DetailsClint A Smith
ESC12-00453 plan waiver approved with conditions attached to the permit.
Routing - PUBLIC WORKS5/7/2012 5/9/2012 PASS
Routing PW Sewer Rating5/8/2012 5/9/2012 PASS
DetailsConnie Baumgartner
Plan resubmittals received  5/8/2012 DONE
DetailsChristina Prado
Received 4 sets of plans marked E0.1 as well as one complete set of plans (T1.0, T2.0, A1.0, A1.1, A2.0, A2.1, A3.0, M1.0, M2.0, M3.0, M4.0, E0.0, E0.1 & E2.1) and one additional structural calcs. Plans given to Carl Westfall for additional review
Routing - Addressing5/7/2012 5/8/2012 PASS
DetailsTerry Records
Pending Assignment by JCB5/4/2012 5/7/2012 DONE
DetailsJason Blais
Intake Approval  5/4/2012 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN TECH  5/4/2012 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/4/2012 DONE
DetailsChristina Prado
Application received  5/1/2012 DONE
Application submitted via PDS Online on May 1 2012 3:12PM