Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-01043
StatusFinaled
Name WAREHOUSE ENG & EQUIPMENT SERV CO
Site Address 357 N STEELHEAD WAY
Project NameSCP DISTRIBUTIONS LLC
Customer Number 
ePlanReviewNo
Description
(SCP DISTRIBUTIONS LLC) To construct and install steel storage racking system exceeding 8' in height with high-piled storage per approved plans and attached structural engineering. SPECIAL INSPECTIONS ARE REQUIRED. Work to include: To install 8,360 square feet total area of racking/shelving (including aisles). Each unit will be bolted to the floor and have more than 36" isles between rows. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI/ANSI MH 16.1. A Letter of Completion is to be issued when done. The existing envelope is not being affected by this permit. EACH RACKING SYSTEM SHALL HAVE A PLAQUE LOCATED AT EACH RACKING SYSTEM STATING THE MAXIMUM WEIGHT TO BE STORED ON THAT PERTICULAR RACKING SYSTEM PER THE ENGINEERS CRITERIA STATED ON THE PLANS FOR EACH RACKING SYSTEM. NOTE: "This building is fully Fire Sprinklered for (allowable area increase) with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." NO OCCUPANCY ALLOWED UNDER THIS PERMIT a separate permit will be required to occupy this space.**SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/30/201210/5/2012 DONE
Second Notice 9/3/20129/25/2012 DONE
First Notice7/23/20128/3/20128/24/2012 DONE
DetailsMike Jordan
BLD-Final7/20/20127/23/20127/23/2012PPASS
DetailsMike Jordan
Daniel Martinez Phone #: ###-####
DOC - Permit Finaled7/23/20127/23/20127/23/2012PPASS
DetailsMike Jordan
FIRE-Final Inspection7/20/20127/23/20127/23/2012APASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  7/16/2012 DONE
DetailsChristina Prado
Plan assigned to (SRZ)5/11/20125/11/20127/10/2012 PASS
DetailsSam Zahorka
1st review due 6-7-12.
IBC review completed 5-21-12
Plan resubmittals received  7/10/2012 DONE
DetailsTisha Gallop
received by mail two copies of fire reveiw response; put with plans and rerouted to Fire.
Routing - FIRE  7/10/2012 PASS
DetailsTim Frost
Routing - PLAN CHECK7/10/2012 7/10/2012 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  7/10/2012 DONE
DetailsSam Zahorka
Case Summary (BLD)  7/10/2012 DONE
Inspection Record Card- Bld  7/10/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  7/10/2012 DONE
DetailsTisha Gallop
Telephone call  7/10/2012 DONE
DetailsTisha Gallop
called Anthony and left vm permit is ready and fees.
Routing - PLAN CHECK5/22/2012 5/24/2012 PEND
DetailsSam Zahorka
Pending Fire to Pass.
Plan Reviewer's activity  5/22/2012 DONE
Emailed failed reviewed to RP.
Routing - FIRE5/21/2012 5/22/2012 FAIL
DetailsTim Frost
1st review completed  5/22/2012 FAIL
Fail - Fire
Routing - PLAN CHECK5/11/2012 5/21/2012 PASS
DetailsSam Zahorka
Pending Assignment by JCB5/10/2012 5/11/2012 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  5/10/2012 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  5/10/2012 DONE
DetailsBarbara Stitt
Intake Approval  5/9/2012 PASS
Intake Approval  5/3/2012 FAIL
Special inspection for 310 needs to be stamped and signed 5-3-12 CDM
Application received 5/2/2012