Permanent Occupancy | | | 6/14/2012 | | DONE |
Tisha Gallop
|
|
|
received completed inspection card via fax; faxed back c of o to applicant.
|
FIRE-Final Inspection | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 6/12/2012 | 6/12/2012 | 6/13/2012 | P | DONE |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Final | 6/13/2012 | 6/13/2012 | 6/13/2012 | A | PASS |
Dave Hannah
|
|
|
David Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 6/8/2012 | 6/8/2012 | 6/8/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety approved pending repair of three EM lights at the gallery area.
|
BLD-Final | 6/8/2012 | 6/8/2012 | 6/8/2012 | P | NR |
Mike Jordan
|
|
|
David Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/31/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/4/2012 | | 5/30/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/30/2012 | | 5/30/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/30/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/30/2012 | | DONE |
Christina Prado
|
|
|
called David to advise permit is ready
|
Permit Ready to Issue | | | 5/30/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 5/4/2012 | | 5/10/2012 | | PEND |
Tim L. Woodard
|
|
|
Original Engineer is working to establish the existing maximum floor load. Engineer will let us know when he is finished. TLW
|
1st review completed | | | 5/10/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 5/4/2012 | 5/4/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|