Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01069
StatusFinaled
Name STINKER STORES INC
Site Address 300 N ORCHARD ST
Project NameSTINKER STORES
Customer Number 
ePlanReviewNo
Description
(STINKER STORE - Front Office - Accessibility upgrade) Permit is to remodel an existing 4,036 square foot office building. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of existing non-bearing walls, construction of new interior nonbearing walls to create separate sex accessible restrooms and two new offices, minor electrical work, installation of new plumbing, install new ramps to the two entrance / exit doors, install new handrails, site improvements all per CZC12-00111, and interior finishes in compliance with chapter 8 of the 2009 IBC. This building is not Fire Sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/8/20131/15/2013 DONE
Second Notice 12/14/20121/3/2013 DONE
First Notice 11/26/201212/4/2012 DONE
BLD-Final11/16/201211/16/201211/16/2012PPASS
DetailsTom Arcoraci
Gail Phone #: ###-####
FIRE-Final Inspection11/16/201211/16/201211/16/2012PPASS
DetailsTroy Cobbley
Life safety passed. Panic hardware was installed on the east end exit door.
Zoning Approval11/16/201211/16/201211/16/2012 PASS
DetailsJosh Wilson
Permanent Occupancy  11/16/2012 DONE
DetailsTisha Gallop
FIRE-Final Inspection11/13/201211/13/201211/13/2012PFAIL
DetailsTroy Cobbley
See the city approved plans for the correction needed which include door hardware. Corrections and locations are marked in red.
BLD-Framing/Rough-in8/31/20128/31/20128/31/2012PPASS
DetailsTom Arcoraci
Gayle Phone #: ###-####
Issue PAID IN FULL permit  6/20/2012 DONE
Routing - PLAN CHECK6/13/2012 6/13/2012 PASS
DetailsTim L. Woodard
Approved with revised attached sheet A1.1. TLW
Routing - PLANNING6/13/2012 6/13/2012 PASS
DetailsJosh Wilson
Verified with planning no changes needed with the addition of handrails to ramps. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/13/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/13/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/13/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  6/13/2012 DONE
DetailsTisha Gallop
Plan assigned to (TLW)5/4/2012 6/13/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/30/2012 5/30/2012 FAIL
DetailsTim L. Woodard
Need handrails and curb protection on new ramps.
1st review completed  5/18/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK5/11/2012 5/18/2012 PEND
DetailsTim L. Woodard
Awaiting Planning approval for exterior changes. Tim Woodard
Routing - PUBLIC WORKS5/4/2012 5/11/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage5/9/2012 5/10/2012 PASS
DetailsBrian Murphy
Routing PW Sewer Rating5/8/2012 5/9/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing5/8/2012 5/8/2012 PASS
DetailsApril Wing
Application received 5/4/20125/4/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  5/4/2012 DONE
DetailsBarbara Stitt
Intake Approval  5/4/2012 PASS
DetailsTim L. Woodard