BLD-Final | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Jim Sly
|
|
|
Micah Phone #: ###-####
|
DOC - Permit Finaled | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 11/8/2012 | 11/9/2012 | 11/9/2012 | A | PASS |
Jim Sly
|
|
|
Micah Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2012 | 11/7/2012 | 11/8/2012 | P | PASS |
Jim Sly
|
|
|
Micah Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2012 | 10/24/2012 | 10/25/2012 | P | PASS |
Jim Sly
|
|
|
Shear inspection please_micah Phone #: ###-####
|
BLD-Foundation | 9/27/2012 | 9/28/2012 | 9/28/2012 | A | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
BLD-Footing | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Jim Sly
|
|
|
Dane phone ###-####
|
BLD-Footing | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | CANC |
Jim Sly
|
|
|
Dane Phone #: ###-#### Re-scheduled for PM per Contr.
|
Issue PAID IN FULL permit | | | 9/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 6/29/2012 | | 8/6/2012 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 8/6/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies revised shear plan; taken to Carl Madsen
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/6/2012 | | |
|
|
|
|
Telephone call | | | 8/6/2012 | | |
|
|
|
8-6-12 called Greg permit ready and fee given ///dld
|
Plan assigned to (CDM) | 6/19/2012 | | 8/6/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 7/11/2012 | | 7/11/2012 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/28/2012 | | 6/29/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Alley Heating
|
Routing - PLAN CHECK | 6/22/2012 | | 6/28/2012 | | FAIL |
Carl D Madsen
|
|
|
Wall bracing. Sent E-Mail to the applicant. 6-28-12 CDM
|
Routing - PLANNING | 6/28/2012 | | 6/28/2012 | | PASS |
David Moser
|
|
|
lot 2 and block 3 is not required to move the living space in front of the garage. Site plan is OK
|
1st review completed | | | 6/28/2012 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 6/28/2012 | | DONE |
|
|
|
|
Routing - Addressing | 6/19/2012 | | 6/20/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2012 | | 6/20/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 6/19/2012 | 6/19/2012 | | DONE |
Christina Prado
|
|
|
Resubmitted same house plan on new lot. Re-routed to planning, Addressing & Public Works
|
1st review completed | | | 5/22/2012 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 5/9/2012 | | 5/22/2012 | | FAIL |
Carl D Madsen
|
|
|
Fail pendin planning redesign 5-22-12 CDM
|
Routing - PUBLIC WORKS | 5/8/2012 | | 5/9/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 5/7/2012 | 5/10/2012 | 5/8/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 5/7/2012 | | 5/8/2012 | | PASS |
Terry Records
|
|
|
|
Application received | | 5/7/2012 | 5/7/2012 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/7/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 5/7/2012 | | PASS |
Alexandra L. DeYoung
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - PLANNING | 6/20/2012 | | | | FAIL |
Colleen T Carroll
|
|
|
Same plans, still does not meet condition of approval that requires garage to be behind living space.
|
Routing - PLANNING | 5/9/2012 | | | | FAIL |
|
|
|
Condition 1-A of CUP04-00140 requires the garage be located behind the living space of the house. I spoke to Greg who works for the developer and told him to redesign.
|