Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01091
StatusFinaled
Name SCOTT LARSEN
Site Address 6438 S SUPPLY WAY
Project NamePDM STEEL SERVICE CENTERS
Customer Number 
ePlanReviewNo
Description
**(PDM Steel Service Center, Inc.)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 6,200 sq ft office / warehouse building. This space was previously occupied by "White Cloud Auto Transport" BLD95-00584. A mezzanine was added by White Cloud under BLD98-00903. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/18/2012 DONE
DetailsChristina Prado
BLD-Final6/8/20126/11/20126/11/2012APASS
DetailsJim Storey
SCott Phone #: ###-####
FIRE-Final Inspection6/7/20126/8/20126/8/2012APASS
DetailsForrest France
Corrections finished. Note: "door to remain....." signage at the main entry to be posted on the egress side.
FIRE-Final Inspection5/21/20125/21/20125/21/2012PPART
DetailsForrest France
Final pending C/N items and a current annual fire sprinkler inspection for the existing system.
BLD-Final5/14/20125/15/20125/15/2012PCANC
DetailsJim Storey
Scott - call 30 mins prior for access Phone #: ###-####
FIRE-Final Inspection5/14/20125/15/20125/15/2012AFAIL
DetailsForrest France
Correction items include; post "door to remain unlocked...." signage at the main entry/exit, post one fire extinguisher at the second floor level, the existing fire sprinkler system is overdue annual certification. Also noted some exit signs and EM lights are not functional on battery backup and premise address numbers are not located or sized per min. standard. See items #1,2,4 and 8 on the list of general requirements attatched to the permit documents for details.
Plan assigned to (TLW)5/8/2012 5/14/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK5/8/2012 5/14/2012 PASS
DetailsTim L. Woodard
1st review completed  5/14/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/14/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  5/14/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  5/14/2012 DONE
Permit Ready to Issue  5/14/2012  
Telephone call  5/14/2012  
5-14-12 called Scott Larsen permit ready for pick up ///dld
Issue PAID IN FULL permit  5/14/2012 DONE
DetailsAlexandra L. DeYoung
Application received 5/7/20125/8/2012 DONE
Plans ACCEPTED BY PLAN TECH  5/8/2012 DONE
DetailsAlexandra L. DeYoung
First Notice 6/28/2012