Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01110
StatusFinaled
Name FLYNNER HOMES
Site Address 2693 E RHYOLITE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2,695 sq. ft., two story (basement 900 sq. ft, grade level 2,065 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms approximately 431 sq. ft. of covered patio/porch and a 1,088 sq. ft. attached garage per the approved plans. plan review report, the attached engineering and any notations. This structure is located in WUI zone A and requires a class A fire rated roofing material, noncombustible exterior siding products and one hour fire rated soffits. R-1A zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/16/2014 DONE
PubWorks Occupancy Approval4/1/20134/1/20134/1/2013 DONE
DetailsJason C. Taylor
All grading/drainage/re-vegetation has been completed. Final occupancy may be issued. Bond can be returned. Jason Taylor ###-####
BLD-Final1/24/20131/25/20131/25/2013APASS
DetailsDave Hannah
PLease call prior to inspection Phone #: ###-####
DOC - Permit Finaled1/25/20131/25/20131/25/2013PPASS
DetailsDave Hannah
Routing PW Grading-Hillside1/25/2013 1/25/2013 PASS
DetailsJason C. Taylor
Permit approved for temporary occupancy on grading and drainage. Bond posted for grading & revegetation work to be done as soon as possible. Jason Taylor (###-####)
BLD-Final1/10/20131/11/20131/14/2013ANR
DetailsDave Hannah
bill Phone #: ###-####
BLD-Final1/9/20131/9/20131/10/2013PPEND
DetailsDave Hannah
bill Phone #: ###-####
BLD-Energy code compliance10/16/201210/17/201210/17/2012PPASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Framing/Rough-in10/5/201210/8/201210/10/2012APASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Framing/Rough-in10/9/201210/10/201210/10/2012APASS
DetailsDave Hannah
bill Phone #: ###-####
BLD-Wall Bracing9/18/20129/20/20129/20/2012PPASS
DetailsDave Hannah
bill - late if possible Phone #: ###-####
BLD-Foundation7/26/20127/26/20127/26/2012APART
DetailsTony Young
Aaron Phone #: ###-####,, walls ok
BLD-Wall Bracing7/25/20127/26/20127/26/2012ANR
DetailsTony Young
Aaron Phone #: ###-####,, foundation only ok
PubWorks Subgrade Approval7/17/20127/17/20127/17/2012 DONE
DetailsTerry Records
Received engineers approval of footing subgrade.
PubWorks Subgrade Approval7/16/20127/16/20127/16/2012 FAIL
DetailsTerry Records
Footing approved without subgrade approval
BLD-Footing7/12/20127/13/20127/13/2012APASS
DetailsTom Arcoraci
aaron Phone #: ###-####
Inspection Record Card- Bld  6/11/2012 DONE
Permit Ready to Issue  6/11/2012 DONE
DetailsBarbara Stitt
Telephone call  6/11/2012 DONE
DetailsBarbara Stitt
Called and told Bill that permit is ready & fees due on 6-11-12 @ 9:55am//BAS
Issue PAID IN FULL permit  6/11/2012 DONE
DetailsChristina Prado
Plan assigned to (CDM)5/8/20125/8/20126/9/2012 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK6/9/2012 6/9/2012 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/9/2012  
Routing - PLAN CHECK5/21/2012 6/8/2012 FAIL
DetailsCarl D Madsen
Plans are required to be stamped by the engineer. Contacted Bill Hass with Flynner Homes to request resubmittals. 6-8-12 CDM
Case Summary (BLD)  6/8/2012 DONE
1st review completed  6/8/2012 FAIL
Routing - FIRE5/17/2012 5/21/2012 PASS
DetailsScott Arellano
Per Boise Fire Department subdivision conditions of approval (SUB06-00038); fire sprinklers are required in all houses Boulder Heights Estates phase 3.
Plan resubmittals received  5/18/2012 DONE
DetailsTisha Gallop
Bill Haas came into office and redlined plans to remove the indoor swimming pool. He said that will be installed at a later date by a different contractor; rerouted to Mechanical
Routing - MECHANICAL5/18/2012 5/18/2012 PASS
DetailsTroy James
Routing - MECHANICAL5/10/2012 5/17/2012 FAIL
DetailsTroy James
emailed correction to idaho HVAC
Plan resubmittals received  5/15/2012 DONE
DetailsTisha Gallop
received one copy of mechanical manuals; taken to Mechanical with plans
Telephone call  5/14/2012 DONE
DetailsTisha Gallop
called Flynner Homes and told him mech. manuals not in plans packet. He said will get them to us by the end of today or tomorrow morning. Told him will hold plans up at front desk.
Routing - Erosion and Sediment5/14/2012 5/14/2012 PASS
DetailsClint A Smith
ESC12-00467 plan approved with conditions attached to the permit.
Routing - PLANNING5/9/2012 5/10/2012 PASS
DetailsSue Cummings
WUI zone A
Route to Impact Fee Review5/8/20125/11/20125/9/2012 PASS
DetailsCindy M. Gould
Routing - Addressing5/8/2012 5/9/2012 PASS
DetailsTerry Records
Routing - PUBLIC WORKS5/8/2012 5/9/2012 PASS
DetailsConnie Baumgartner
Routing PW Grading-Hillside5/8/2012 5/9/2012 PASS
DetailsTerry Records
Application received 5/8/20125/8/2012 DONE
Recd Pcfee & Taken To Pln CK  5/8/2012 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  5/8/2012 DONE
DetailsAlexandra L. DeYoung
Intake Approval  5/8/2012 PASS
DetailsAlexandra L. DeYoung