First Notice | | 8/30/2012 | 8/28/2012 | | DONE |
|
|
|
This permit finaled on the web by Brian Warbis
|
BLD-Final | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PASS |
Mike Jordan
|
|
|
bryan Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 8/20/2012 | 8/20/2012 | 8/20/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
Zoning Approval | 8/20/2012 | 8/20/2012 | 8/20/2012 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 8/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Conference | 7/17/2012 | 7/17/2012 | 7/17/2012 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Trent about getting inspections before the ceiling have been installed.
|
BLD-Foundation | 7/5/2012 | 7/6/2012 | 7/6/2012 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
BLD-Other | 7/5/2012 | 7/6/2012 | 7/6/2012 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####insulation levels at fur outs ok to cover.
|
BLD-Footing | 6/29/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Dave Hannah
|
|
|
footing/rebar -- Steve Ove Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Dave Hannah
|
|
|
Steve Ove Phone #: ###-#### ok to cover after elec rough in int walls ok to insulate ext walls
|
Plan assigned to (SRZ) | 5/22/2012 | 5/22/2012 | 6/29/2012 | | PASS |
Sam Zahorka
|
|
|
ePlanReview case
1st building plan review completed. Corrections requested.
|
Routing - PUBLIC WORKS | 5/22/2012 | | 6/29/2012 | | PASS |
Beverly Mountain
|
|
|
Signed off in ePlan Review
|
Routing - PLAN CHECK | 6/29/2012 | | 6/29/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2012 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 6/29/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 6/29/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/29/2012 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 6/22/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - FIRE | 6/18/2012 | | 6/22/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 5/22/2012 | | 6/19/2012 | | FAIL |
Sam Zahorka
|
|
|
Corrections listed as changemarks in ePlan Review.
|
Routing - Addressing | 5/25/2012 | | 5/25/2012 | | PASS |
Terry Records
|
|
|
Changed address on permit to 2772 S Victory View Way so as to fit properly in sequence.
|
Routing PW Sewer Rating | 5/23/2012 | | 5/24/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/22/2012 | | 5/24/2012 | | FAIL |
Terry Records
|
|
|
Plan submitted under wrong address. Need to investigate and assign appropriate address
|
Routing - PLUMBING | 5/22/2012 | | 5/23/2012 | | PASS |
Bill VanDegrift
|
|
|
Water Service may require a DCVA installed if there is not an existing backflow on service.
Per plans and 2003 UPC.
|
Routing - Design Review | 5/22/2012 | | 5/22/2012 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC12-00099
|
Intake Approval | | | 5/22/2012 | | PASS |
Jason Blais
|
|
|
|
Pending Assignment by JCB | 5/22/2012 | | 5/22/2012 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 5/11/2012 | | FAIL |
Tim L. Woodard
|
|
|
Ryan,
Please address the following items so a prescreen review can be completed. First, this project would be a major tenant improvement and need #520 application and checklist filled out and uploaded into the documents folder. Next is the submittal upload guide was not followed as required; a stamping area is required in the bottom right of each plan sheet for batch stamping. Down load the required submittal upload guide and comply with all requirements including the stamping area. When uploading new sheets be sure to name them exactly the same as the sheets in the system, this will inturn create a version two of the sheet. After all items are addressed go into the workflow portal and sign off on your task. Thanks Tim Woodard (208) 384 3817.
|
Application received | | | 5/10/2012 | | DONE |
|
|
|
Application submitted via PDS Online on May 10 2012 8:37AM
|