Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD12-01128
StatusFinaled
Name Robert Castoro
Site Address 276 W BOBWHITE CT
Project NameBarbacoa Restroom Addition TI
Customer Number 
ePlanReviewYes
Description
(BARBACOA – Rooftop Restroom Remodel) To remodel a 9,275 square foot restaurant building remodel that will enclose a 79 square foot restroom on the rooftop of this building. This remodel will increase the building area to 9,354 square feet. The restroom will serve the rooftop dining area. This building was built under BLD10-00550. Work is to include: construction of new exterior walls, construction of new roof system, installation of new accessible door / hardware, new plumbing, installation of new lighting, new exterior finishes, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  7/9/2013 DONE
DetailsTisha Gallop
received phone call from Rita at Strite Design & Remodel to send bill for final values to owner.
Print Statement  7/9/2013 DONE
DetailsTisha Gallop
mailed to owner Robert Castro
Second Notice 6/14/20136/18/2013 DONE
DetailsChristina Prado
completed 6-18-2013
Print Statement  6/18/2013 DONE
DetailsChristina Prado
First Notice5/1/20135/1/20136/4/2013 DONE
DetailsJim Storey
mailed 6-5-13
BLD-Final5/1/20135/1/20135/1/2013PPASS
DetailsJim Storey
ERIC late pm if possible Phone #: ###-####
DOC - Permit Finaled5/1/20135/1/20135/1/2013PPASS
DetailsJim Storey
FIRE-Final Inspection4/24/20134/24/20134/26/2013PPASS
DetailsForrest France
Fire life safety passed pending door hardware revision at the new restroom.
BLD-Final4/24/20134/24/20134/24/2013PFAIL
DetailsJim Storey
eric - call 30 mins prior Phone #: ###-#### door hardware and vertical grab bar
FIRE-Conference4/16/20134/16/20134/17/2013PDONE
DetailsForrest France
On site conference with contractor regarding items needed prior to fire life safety final approval.
FIRE-Conference4/1/20134/2/20134/2/2013ADONE
DetailsForrest France
Conversation with contractor regarding fire alarm system modifications necessary due to remodel work.
BLD-Framing/Rough-in3/28/20133/28/20134/1/2013PPASS
DetailsJim Storey
Eric-as late as possible please Phone #: ###-####
BLD-Energy code compliance3/28/20133/29/20133/29/2013APASS
DetailsTom Arcoraci
late morning - eric Phone #: ###-####
Inspection Record Card- Bld  3/26/2013 DONE
Issue PAID IN FULL permit  3/26/2013 DONE
Permit Ready to Issue  3/25/2013 DONE
DetailsTisha Gallop
Extend Review Timeline  8/21/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)6/13/2012 7/5/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/5/2012 7/5/2012 PASS
DetailsTim L. Woodard
Approved plans and routed to Josh W. in E-plan review. TLW
Routing - PLANNING7/5/2012 7/5/2012 PASS
DetailsJosh Wilson
PLANS/APPL TAKEN TO FRONT DESK  7/5/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK6/13/2012 6/18/2012 PASS
DetailsTim L. Woodard
Approved with no comments. TLW
1st review completed  6/18/2012 DONE
DetailsTim L. Woodard
Routing - FIRE  6/5/2012 PASS
Routing - Design Review6/1/2012 6/4/2012 FAIL
DetailsJosh Wilson
Applicant required to submit CZC for additional rooftop square footage per SMS. Architect contacted.
Routing PW Sewer Rating6/4/2012 6/4/2012 PASS
DetailsConnie Baumgartner
Intake Approval  5/31/2012 PASS
DetailsTim L. Woodard
Application received  5/10/2012 DONE
Application submitted via PDS Online on May 10 2012 9:07AM