FIRE-Final Inspection | 6/22/2012 | 6/25/2012 | 6/25/2012 | A | FAIL |
Forrest France
|
|
|
Exit signs at the corridor are not functional on battery backup, one new office is missing fire sprinkler coverage, existing FP system is overdue annual certification. Modifications to the fire sprinkler system will require a separate permit.
|
BLD-Final | 6/22/2012 | 6/25/2012 | 6/25/2012 | P | CANC |
Mike Jordan
|
|
|
Duke Phone #: ###-####
|
BLD-Final | 6/21/2012 | 6/22/2012 | 6/22/2012 | P | NR |
Mike Jordan
|
|
|
Duke Phone #: ###-####. Needs life/safety inspectio first.
|
BLD-Framing/Rough-in | 5/23/2012 | 5/24/2012 | 5/24/2012 | A | PART |
Mike Jordan
|
|
|
Duke Phone #: ###-####. Pending electrical rough in insp[ection.
|
Inspection Record Card- Bld | | | 5/18/2012 | | DONE |
|
|
|
|
Telephone call | | | 5/18/2012 | | DONE |
Christina Prado
|
|
|
spoke to Keith and advised permit is ready and GC/RCE is required prior to issuance
|
Permit Ready to Issue | | | 5/18/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 5/18/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 5/11/2012 | | 5/17/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/11/2012 | | 5/17/2012 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 5/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/17/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 5/11/2012 | 5/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2012 | | DONE |
Barbara Stitt
|
|
|
|