FIRE-Final Inspection | 5/17/2012 | 5/17/2012 | 5/17/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The smoke evac system functioned correctly.
|
BLD-Final | 5/17/2012 | 5/17/2012 | 5/17/2012 | P | PASS |
Mike Jordan
|
|
|
rajendra Phone #: ###-####. All issues have been resolved. ok for perm occ.
|
BLD-Final | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | FAIL |
Mike Jordan
|
|
|
Rajendra Phone #: ###-####. Remove all combustible walls and provide access above ceiling grid for wall inspection.
|
FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/17/2012 | P | FAIL |
Troy Cobbley
|
|
|
Need to remove or repair the exit sign. Provide testing of the mall engineered smoke evac system.
|
Permanent Occupancy | | | 5/17/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 5/15/2012 | | 5/16/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/15/2012 | | 5/16/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/16/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/16/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 5/16/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/16/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/14/2012 | 5/15/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2012 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 5/27/2012 | | | |
|
|
|
|