Second Notice | | 10/28/2012 | 10/19/2012 | | DONE |
|
|
|
|
Print Statement | | | 10/19/2012 | | DONE |
Tisha Gallop
|
|
|
e-mailed to Jeff Tonkin
|
Print Statement | | | 10/19/2012 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 10/7/2012 | 10/18/2012 | | DONE |
|
|
|
faxed
|
Permanent Occupancy | | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 9/19/2012 | 9/20/2012 | 9/20/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Sprinkler Rough-in | 9/17/2012 | 9/17/2012 | 9/17/2012 | P | PART |
Forrest France
|
|
|
Fire sprinkler work ready for final.
|
BLD-Framing/Rough-in | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Tony Young
|
|
|
ceiling grid inspection please-Jason Phone #: ###-####
|
BLD-Other | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PART |
Tom Arcoraci
|
|
|
Jason - ceiling Phone #: ###-#### no wires on return or supply repair and leave tile out in this area
|
CHANGE STATUS TO (ISS) | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/13/2012 | | DONE |
Tisha Gallop
|
|
|
called Peter Rockwell and left message with Mary fee for plan mod changed, now $69.48, because swr impact fees were taken off.
|
OVERRIDE | | | 8/10/2012 | | |
|
|
|
|
Telephone call | | | 8/10/2012 | | DONE |
Tisha Gallop
|
|
|
called arch and left vm plan mod approved, fees due.
|
Routing - PLUMBING | 8/7/2012 | | 8/10/2012 | | PASS |
Bill VanDegrift
|
|
|
pumps required due to conflicts with structure
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 8/10/2012 | | DONE |
Tisha Gallop
|
|
|
PLAN MODIFICATION
|
Plan assigned to (TLW) | 8/7/2012 | | 8/10/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/7/2012 | | 8/7/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2012 | | 8/7/2012 | | PASS |
Beverly Mountain
|
|
|
|
BLD-Conference | 8/2/2012 | 8/3/2012 | 8/3/2012 | A | PART |
Jim Storey
|
|
|
Jason Phone #: ###-#### stud height ok per listing of studs used. ok to cover all locations except plm resubmital aproval and fixture removal to acomadate pump sys. void at top of coridor wall to be patched/ top of wall bracing 48 oc to be added. all able to be insp. at ceilling.
|
BLD-Framing/Rough-in | 7/24/2012 | 7/25/2012 | 7/25/2012 | A | NR |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/13/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/13/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 7/11/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 7/11/2012 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2012 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 7/10/2012 | | DONE |
Jason Blais
|
|
|
Addressing changed the Suite # from 102 to 110.
|
Plan assigned to (TLW) | 6/11/2012 | | 7/10/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 6/11/2012 | | 7/10/2012 | | PASS |
Terry Records
|
|
|
Applicant call with correct ste number. Ste # changed from 102 to 110.
|
Routing - PLAN CHECK | 6/11/2012 | | 7/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 6/13/2012 | | 6/13/2012 | | PASS |
Terry Records
|
|
|
Changed suite number to 102
|
Routing - FIRE | 6/11/2012 | | 6/13/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing PW Sewer Rating | 6/11/2012 | | 6/12/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 6/12/2012 | | 6/12/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00493 plan waiver approved with additional conditions attached to the permit.
|
Routing - PUBLIC WORKS | 6/11/2012 | | 6/11/2012 | | PASS |
Beverly Mountain
|
|
|
|
Telephone call | | | 6/11/2012 | | |
|
|
|
6-11-12 sent Allison an e mail that she needs to pay the fee before the paln can move foward. ///dld
|
Intake Approval | | | 6/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 5/16/2012 | | DONE |
|
|
|
Application submitted via PDS Online on May 16 2012 11:26AM
|