Third Follow up | | | 7/1/2013 | | DONE |
Tisha Gallop
|
|
|
Eireannach on hold to provide final values for Bld11-03007, Bld11-03020, Bld12-01216.
|
Third Notice | | 4/27/2013 | 6/3/2013 | | DONE |
|
|
|
mailed to Eirannach
|
Third Notice | | 3/27/2013 | 4/22/2013 | | DONE |
|
|
|
mailed to Eireannach LLC
|
Second Notice | | 3/1/2013 | 3/22/2013 | | DONE |
|
|
|
|
First Notice | 1/30/2013 | 1/30/2013 | 2/19/2013 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 1/30/2013 | 1/30/2013 | 1/30/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/29/2013 | 1/29/2013 | 1/30/2013 | P | CANC |
Tom Arcoraci
|
|
|
JOHN Phone #: ###-####
|
FIRE-Final Inspection | 1/29/2013 | 1/29/2013 | 1/29/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Override - Parcel Holds | 1/29/2013 | 1/1/1900 | 1/29/2013 | | |
|
|
|
this has nothing to do with the final
|
Override - Parcel Holds | 1/29/2013 | 1/1/1900 | 1/29/2013 | | |
|
|
|
this has nothing to do with the hold
|
BLD-Final | 1/28/2013 | 1/28/2013 | 1/28/2013 | P | NR |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Final | 1/25/2013 | 1/25/2013 | 1/25/2013 | P | CANC |
Tom Arcoraci
|
|
|
John Phone #: ###-#### Inspection cancelled from web by: John McCarthy
|
Override - Parcel Holds | 1/25/2013 | 1/1/1900 | 1/25/2013 | | |
|
|
|
Not on this permit
|
BLD-Footing | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Jim Storey
|
|
|
John-Please call prior to inspection Phone #: ###-####
|
Override - Parcel Holds | 9/7/2012 | 1/1/1900 | 9/7/2012 | | |
|
|
|
scheduling inspection
|
Override - Parcel Holds | | | 8/21/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2012 | | DONE |
|
|
|
|
Telephone call | | | 8/2/2012 | | DONE |
Christina Prado
|
|
|
called and gave Ward fees due and advised GC/RCE is required prior to issuance
|
Override - Parcel Holds | | | 8/2/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 8/2/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 7/25/2012 | | 8/1/2012 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 8/1/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of plan sheet A4.0; taken to Sam Zahorka.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2012 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 5/22/2012 | | 8/1/2012 | | PASS |
Sam Zahorka
|
|
|
1st review completed. Corrections needed.
|
Routing Off Site - STRUCTURAL | 7/19/2012 | | 7/25/2012 | | FAIL |
Sam Zahorka
|
|
|
Emailed corrections to Stuctural reviewer.
7-23-12 Received failed structural plan review report. emailed to the architect to forward to the Engineer.
|
Telephone call | | | 7/16/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with the architect Ward Schwider. Waiting for structural plan review corrections.
|
Routing - PLAN CHECK | 7/2/2012 | | 7/16/2012 | | PEND |
Sam Zahorka
|
|
|
Pending Structural Review to PASS.
|
Telephone call | | | 7/2/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with outsource structural plan review engineer about reduction in roof design load due to the intended months of use as documented. He stated he would be ok as long as it is documented and the building official approved. He is waiting for the engineer of record to resubmit corrections for his plan review items #1, b and c, and drawings #1 comment.
|
Routing - PLAN CHECK | 6/19/2012 | | 7/2/2012 | | FAIL |
Sam Zahorka
|
|
|
Spoke with the architect Ward Schwider. Requested a revised letter from the owner to provide a signature. Also requested material information meeting NFPA 707 or documentation showing the canopy material has a flame spread index not greater than 25 tested in accordance with ASTM E 84 or UL 723. Requested the Engineer to resubmitt corrections for structural plan review items #1 -b. and c, and Drawings #1.
|
Telephone call | | | 7/2/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with the architect Ward Schwider. Requested a revised letter from the owner to provide a signature. Also requested material information meeting NFPA 707 or documentation showing the canopy material has a flame spread index not greater than 25 tested in accordance with ASTM E 84 or UL 723. Requested the Engineer to resubmitt corrections for structural plan review items #1 -b. and c, and Drawings #1.
|
Routing - FIRE | 6/14/2012 | | 6/19/2012 | | PASS |
Scott Arellano
|
|
|
No comments required
|
1st review completed | | | 6/19/2012 | | FAIL |
|
|
|
Failed - Plan Check
|
Telephone call | | | 6/14/2012 | | DONE |
Sam Zahorka
|
|
|
Left message with Cholby Orcher the Engineer of record for this project to discuss the reduction in the uniform design roof load of 25 bls. psf for this awning structure.
|
Telephone call | | | 6/14/2012 | | DONE |
Sam Zahorka
|
|
|
Left message with the outsource structural plan reviewer for this project to discuss the reduction in the uniform design roof load of 25 bls. psf for this awning structure.
|
Routing - PLAN CHECK | 5/30/2012 | | 6/14/2012 | | FAIL |
Sam Zahorka
|
|
|
Pending Building Officials approval of seasonal operations of canopy due to decrease of roof design load.
|
Routing - PLANNING | 5/25/2012 | | 5/30/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing Off Site - STRUCTURAL | 5/22/2012 | | 5/30/2012 | | FAIL |
Sam Zahorka
|
|
|
Sent corrections to the Architect to forward to the Engineer of record.
|
Routing PW Drainage | 5/23/2012 | | 5/25/2012 | | PASS |
Brian Murphy
|
|
|
PERVIOUS FABRIC USED
|
Routing - PUBLIC WORKS | 5/23/2012 | | 5/25/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 5/22/2012 | | 5/23/2012 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Rating | 5/23/2012 | | 5/23/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Telephone call | | | 5/22/2012 | | DONE |
Christina Prado
|
|
|
Called action couriers for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/2012 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 5/22/2012 | | 5/22/2012 | | DONE |
John Menard
|
|
|
|
Application received | | 5/18/2012 | | | |
|
|
|
|