Letter of compliance/Occupancy | | | 9/17/2014 | | DONE |
|
|
|
|
Third Notice | | 9/24/2012 | 10/16/2012 | | DONE |
|
|
|
mailed
|
Second Notice | | 9/3/2012 | 9/19/2012 | | DONE |
Christina Prado
|
|
|
caled 9-20
|
First Notice | 8/8/2012 | 8/8/2012 | 8/24/2012 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 8/7/2012 | 8/8/2012 | 8/8/2012 | P | PASS |
Jim Sly
|
|
|
Jeremy-PLease call at least 40 mins prior to inspection Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 8/8/2012 | 8/8/2012 | 8/8/2012 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 8/7/2012 | 8/8/2012 | 8/8/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Smoke detector in the closet is not required as per plan review research.
|
Telephone call | | | 8/8/2012 | | DONE |
|
|
|
Inspector called regarding smoke detector placement in a new closet. I researched the original fire alarm plans for this area (FIR01-00354) and per the drawings on record, there is a note from Sam Rogers regarding this issue. Per the note; the design was for partial smoke detection for HVAC shutdown but duct detectors were added later in the design process. They decided to leave the non-required smoke detectors in place. I let the inspector know that due to this note, a smoke detector is not required to be installed in the new closet.
|
BLD-Final | 8/1/2012 | 8/3/2012 | 8/3/2012 | P | CANC |
Jim Sly
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2012 | 7/6/2012 | 7/6/2012 | P | PASS |
Jim Sly
|
|
|
jeremy Phone #: ###-####
|
Permit Ready to Issue | | | 6/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 6/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 5/18/2012 | | 6/15/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/15/2012 | | 6/15/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with letter attached to case. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/15/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 5/18/2012 | | 6/5/2012 | | FAIL |
Tim L. Woodard
|
|
|
Show required accessibility upgrades. TLW
|
1st review completed | | | 6/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/18/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/18/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/18/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/18/2012 | | | |
|
|
|
|