First Notice | | 8/10/2012 | 7/31/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/31/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Forrest France
|
|
|
|
FIRE-Conference | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | DONE |
Forrest France
|
|
|
please call before going donna ###-####
|
BLD-Final | 7/10/2012 | 7/11/2012 | 7/11/2012 | A | NR |
Tom Arcoraci
|
|
|
Donna- please call 30 min before going out Phone #: ###-#### elec and plumb permits noy required at this time
|
Plan Reviewer's activity | | | 7/10/2012 | | DONE |
Jason Blais
|
|
|
Change to Plan per owner. They decided to provide accessible lever hardware on the restroom doors instead of providing the accessible lavatory in the Men's restroom for the 20% accessibility upgrade requirement.
|
Plan Reviewer's activity | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
Electrical signoff changed to not required based on contractor indicating that an exit sign already existed at the proposed new location. TLW
|
Permit Ready to Issue | | | 6/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 6/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 6/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 6/7/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/7/2012 | | 6/7/2012 | | PASS |
Alexandra L. DeYoung
|
|
|
|
Routing - PLAN CHECK | 6/7/2012 | | 6/7/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with multiple redlines on the plan sheets. TLW
|
Routing - FIRE | 6/1/2012 | | 6/7/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2012 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 5/22/2012 | | DONE |
|
|
|
Application submitted via PDS Online on May 22 2012 11:12AM
|