BLD-Final | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PASS |
Dave Hannah
|
|
|
|
Routing Walk-In (BLD) | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Carl D Madsen
|
|
|
Permit modified to eliminate the conversion of the garage to a master suite.
|
Case Summary (BLD) | | | 12/7/2012 | | DONE |
|
|
|
|
BLD-Final | 12/5/2012 | 12/5/2012 | 12/6/2012 | P | PEND |
Dave Hannah
|
|
|
Justin Phone #: ###-#### kitchen area ok but needs permit to show that remodel of the garage to a bedroom is not being done at this time
|
BLD-Energy code compliance | 9/18/2012 | 9/18/2012 | 9/18/2012 | P | PART |
Dave Hannah
|
|
|
Justin Phone #: ###-#### ok to kitchen wall
|
BLD-Framing/Rough-in | 9/14/2012 | 9/17/2012 | 9/17/2012 | A | PART |
Dave Hannah
|
|
|
justin Phone #: ###-#### kitchen wall ok
|
Issue PAID IN FULL permit | | | 5/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 5/23/2012 | 5/23/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 5/23/2012 | 5/23/2012 | 5/23/2012 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/23/2012 | 5/23/2012 | 5/23/2012 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/23/2012 | 5/23/2012 | 5/23/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 5/23/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2012 | | |
|
|
|
|
1st review completed | | | 5/23/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/23/2012 | | DONE |
|
|
|
|