Third Notice | | 2/26/2013 | 3/1/2013 | | DONE |
|
|
|
|
Print Statement | | | 3/1/2013 | | DONE |
Tisha Gallop
|
|
|
mailed ot ESI
|
Third Notice | | 2/2/2013 | 2/21/2013 | | DONE |
|
|
|
mailed to ESI Attn: Brandon
|
Second Notice | | 1/13/2013 | 1/28/2013 | | DONE |
|
|
|
|
First Notice | | 12/24/2012 | 1/3/2013 | | DONE |
Christina Prado
|
|
|
mailed 01-03-13
|
Permanent Occupancy | | | 12/14/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Dave Hannah
|
|
|
Please call an hour prior to arrival if at all possible. Thanks, Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Sprinkler Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Forrest France
|
|
|
Project related fire sprinkler permit finaled.
|
BLD-Framing/Rough-in | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Dave Hannah
|
|
|
Inspecting rooms 910, 911A, 911B, 912. Rooms are located on the 9th floor next to the main elevator lobby. Plans are located at the reception desk on the 10th floor. Please call with any questions. Thanks, Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 9/14/2012 | 9/14/2012 | 9/17/2012 | P | PASS |
Dave Hannah
|
|
|
Plans and permit at the reception desk on the 10th floor. Inspecting wall framing in rooms 1051, 1052, 957, 958. Please call Chris approx 1 hr prior to arrival if at all possible. Thank You. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
(F) Reprint permit | | | 9/11/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/11/2012 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/30/2012 | 8/30/2012 | 9/4/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/30/2012 | | 9/4/2012 | | PASS |
Carl Westfall
|
|
|
Plan mod approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/4/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/4/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
called Erstad Arch. and told Megan plan mod is ready and fee due.
|
Plan Modification Accepted | | | 8/30/2012 | | |
|
|
|
Plan modification to reconfigure new 10th floor conference room 1051 into two smaller conference rooms. Sheets a3.02, a2.12, a3.21, a6.11 and a new cert o f value were submitted.
|
Issue PAID IN FULL permit | | | 8/13/2012 | | |
|
|
|
|
Plan assigned to (CJW) | 5/25/2012 | 5/25/2012 | 7/25/2012 | | PASS |
Carl Westfall
|
|
|
HAWLEY TROXELL (20 days - June 19)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
called Erstad Arch. and told Megan permit is ready and fee, need GC/form.
|
Routing - PLAN CHECK | 7/12/2012 | | 7/25/2012 | | PASS |
Carl Westfall
|
|
|
Structural work deleted from the project. Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 7/24/2012 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of plan sheets a0.01, a0.02, a2.01, a2.02, a2.011, a2.12, a2.31, a3.21, a6.11; taken to Carl Westfall.
|
Route to Impact Fee Review | 6/20/2012 | 6/25/2012 | 7/17/2012 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement
|
Routing - PLAN CHECK | 6/22/2012 | | 7/12/2012 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd review. One item not resolved.
|
Plan resubmittals received | | | 7/10/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of architectural response letter, engineers response letter and plan sheets a0.01, a0.02, a2.01, a2.02, a2.11, a2.12, S0.01, S5.21; taken to Carl Westfall
|
Routing - FIRE | 6/20/2012 | 6/20/2012 | 6/22/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/22/2012 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 5/29/2012 | | 6/20/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on June 18 and was finished on June 20. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 5/25/2012 | | 5/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/29/2012 | | 5/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 5/25/2012 | | 5/25/2012 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 5/23/2012 | | 5/25/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 5/23/2012 | 5/23/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2012 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/2012 | | DONE |
|
|
|
|