Permit Information
Permit NumberBLD12-01288
StatusFinaled
Name LORIE FORBUS
Site Address 2913 W OVERLAND RD
Project NameABOVE & BEYOND CLEAN CORP
Customer Number 
ePlanReviewNo
Description
(ABOVE & BEYOND CLEAN CORP - PHASE 1 - EAST SIDE) Remodel to convert an existing 1,530 sq. ft. single family dwelling into a commercial office building per approved plans. Work to include select demolition of east side Sun Room and interior; new structural concrete pads in crawl space for supports of new columns, new beams; new interior walls to create accessible restroom and closet; electrical, mechanical and plumbing upgrades; and interior finishes and associated exterior landings, stairs, ramp, railings and site work. All per reviewed plans, red-lined comments of reviewing agencies and all attached plan review comments of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/27/20133/29/2013 DONE
Telephone call  3/26/2013 DONE
DetailsTisha Gallop
Tenant called said his GC is hard to get a hold of so probably why he hasn't responded to other notices. Tenant said will forward this to Adame Const.
Third Notice 2/26/20133/22/2013 DONE
mailed to Tenant
Third Notice 2/2/20132/21/2013 DONE
mailed to Adame Construction
Second Notice 1/13/20131/28/2013 DONE
DetailsChristina Prado
mailed 1/29/13
First Notice 12/28/20121/3/2013 DONE
Mailed 1-3-13
BLD-Final12/17/201212/18/201212/18/2012APASS
DetailsJim Sly
jessie please call 30 min before going out Phone #: ###-####
Conf. room lever handle for egress installed.
OK for Perm Occ.
Print Occupancy Form  12/18/2012 DONE
DetailsChristina Prado
Permanent Occupancy  12/18/2012 DONE
DetailsChristina Prado
Permanent Occupancy issued in error - Should have been temp CO for east half of bldg. X ref BLD13-00916 for finish work of storage area/half bath addition as well as detailed listing from architect notating scheduling of finish work. Per Rita a permit fee will be charged for additional value and no new certificate of occupancy will be issued.
BLD-Final12/14/201212/17/201212/17/2012AFAIL
DetailsMike Jordan
Jesse-PLease call prior to inspection Phone #: ###-####. provide passage hardware von office doors. Provide landing for bassement as shown on approved plans. provide code compliant door hardware on exterio door. Correction notice issued.
Telephone call  12/17/2012 DONE
Call from Mike Jordan concerning exterior door hardware for this project. The exterior door to the Reception Area was to have the key lock with sign and the exterior door at the Conference Room was to have exterior key lock but lever handle interior hardware to allow ready egress from building.
FIRE-Final Inspection12/14/201212/14/201212/14/2012PPASS
DetailsForrest France
Life safety okayed pending door hardware at the restroom and main entry/exit per plan review notes.
BLD-Footing9/7/20129/10/20129/10/2012APASS
DetailsTom Arcoraci
Jesse Phone #: ###-####
BLD-Energy code compliance9/6/20129/6/20129/6/2012PPASS
DetailsJim Sly
Jesse Phone #: ###-####
BLD-Framing/Rough-in9/4/20129/4/20129/4/2012PPART
DetailsDave Hannah
jesse- call 30 mins prior Phone #: ###-#### ok to insulate needs to strape beams and top plates
Issue PAID IN FULL permit  8/1/2012 DONE
DetailsBarbara Stitt
OVERRIDE  7/25/2012  
Telephone call  7/25/2012 DONE
DetailsTisha Gallop
Called Ward and told him permit is ready, need ACHD, GC, RP and will call Lorie to tell her same info. Called Lorie and left permit desk phone# for her to call back.
Print Occupancy Form  7/25/2012 DONE
Permit Ready to Issue  7/25/2012 DONE
DetailsTisha Gallop
Plan assigned to (DRS)5/25/20125/25/20127/24/2012 PASS
DetailsDan Stuart
Routing - PLANNING7/24/2012 7/24/2012 PASS
DetailsSue Cummings
Routing - Design Review7/24/2012 7/24/2012 PASS
DetailsAndrea Tuning
This was approved with redlined corrections in regard to the trellis, the fence along the east property line, the landscaping and the new asphalt for the turnaround.
Routing - PLAN CHECK7/24/2012 7/24/2012 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  7/24/2012 PASS
Approved as noted and attached.
Routing - PLAN CHECK7/17/2012 7/23/2012 PASS
DetailsDan Stuart
Resubmittals received. Red-lined comments on plans and all attached plan review comments / conditions of all reviewing agencies are part of the reviewed plans.
Plan resubmittals received  7/23/2012 DONE
DetailsChristina Prado
Received two spoies of response letter as well as two copies of plans sheets marked A0.0, A1.0, A2.0, A2.1 & A3.0. Routed to Dan Stuart for review
Routing - Design Review7/17/2012 7/18/2012 FAIL
DetailsAndrea Tuning
The applicant has not submitted the accurate "build out" plan. Instead, the applicant has submitted a site plan with various construction dates that do not match the DR approval.
Route to Impact Fee Review7/3/20127/9/20127/17/2012 PASS
DetailsCindy M. Gould
No impact fees, this building was use commercially in the past.
Routing - PLAN CHECK7/10/2012 7/17/2012 FAIL
DetailsDan Stuart
2nd review - resubmittals required.
Plan resubmittals requested  7/17/2012 DONE
Copy of 2nd plan review report e-mailed to Ward Schwider and Lorie Forbus.
Routing - FIRE7/2/20127/2/20127/10/2012 PASS
DetailsTim Frost
1st review completed  7/10/2012 FAIL
Failed - Design Review, Plan Check, Planning
Plan resubmittals received  7/10/2012 DONE
DetailsAlexandra L. DeYoung
Rec'd two copies of A0.0; A1.0; A2.0; A2.1; A3.0 & response sheet - arch signed EN-1 sheet - taken to Dan S
Plan resubmittals requested  7/3/2012 DONE
DetailsDan Stuart
Copy of plan review report e-mailed to architect for response. Copy also sent to owner.
Routing - PLAN CHECK5/30/2012 7/3/2012 FAIL
DetailsDan Stuart
Resubmittals required. Plans routed to fire code analyst for review.
Routing - PLANNING5/30/2012 5/30/2012 FAIL
DetailsSue Cummings
Sue Cummings - CVA11-00043
Routing - Design Review5/30/2012 5/30/2012 FAIL
DetailsAndrea Tuning
The applicatn has modified the site plan, landscape plan, and elevations from the previous approval - DRH11-00189. The applicant will be required to submit a new design review application for review and approval prior to a building permit.
Routing - Erosion and Sediment5/29/2012 5/30/2012 PASS
DetailsClint A Smith
ESC12-00519 plan waiver approved with additional conditions attached to the permit.
Routing PW Sewer Rating5/25/2012 5/29/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS5/25/2012 5/29/2012 PASS
DetailsConnie Baumgartner
Pending Assignment by JCB5/24/2012 5/25/2012 DONE
DetailsJason Blais
Plan Reviewer's activity  5/25/2012 DONE
DetailsJason Blais
Sent architect an email to have him contact ACHD for evaluation of any impact fees due. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
Routing - Addressing5/25/2012 5/25/2012 PASS
DetailsTerry Records
Application received 5/24/20125/24/2012 DONE
DetailsBarbara Stitt
Intake Approval  5/24/2012 FAIL
Intake Approval  5/24/2012 PASS
Plans ACCEPTED BY PLAN TECH  5/24/2012 DONE
DetailsBarbara Stitt
Override - Parcel Holds  5/24/2012  
Recd Pcfee & Taken To Pln CK  5/24/2012 DONE
DetailsBarbara Stitt