Third Notice | | 1/8/2013 | 1/9/2013 | | DONE |
|
|
|
|
Third Notice | | 12/9/2012 | 1/3/2013 | | DONE |
|
|
|
mailed
|
Third Notice | | 11/19/2012 | 12/4/2012 | | DONE |
|
|
|
mailed
|
Second Notice | | 10/25/2012 | 11/14/2012 | | DONE |
|
|
|
|
First Notice | | 9/24/2012 | 10/15/2012 | | DONE |
Christina Prado
|
|
|
mailed 10-15-12
|
BLD-Final | 9/13/2012 | 9/14/2012 | 9/14/2012 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Permanent Occupancy | | | 9/14/2012 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
BLD-Other | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | PART |
Tony Young
|
|
|
Jason - ceiling partial Phone #: ###-####,, tall ceiling ok,, perimeter on lower ok
|
BLD-Other | 8/27/2012 | 8/27/2012 | 8/27/2012 | P | NR |
Mike Jordan
|
|
|
partial T grid insp on the front of the building the 2''11" section//call Jason Phone #: ###-####. Needs elec. rough in inspection.
|
BLD-Framing/Rough-in | 8/8/2012 | 8/9/2012 | 8/9/2012 | A | PASS |
Dave Hannah
|
|
|
Please call 15-20 min prior to arrival to meet - Jason Phone #: ###-####
|
Plan Reviewer's activity | | | 7/9/2012 | | DONE |
Sam Zahorka
|
|
|
Received the evaluation of the existing roofs capability to carry additional mechanical roof equipment from the engineer of record. The letter is attached to this case under documents. Emailed the applicant to proceed with mechanical equipment installations.
|
Issue PAID IN FULL permit | | | 6/27/2012 | | DONE |
|
|
|
|
OVERRIDE | | | 6/22/2012 | | |
|
|
|
|
Plan assigned to (SRZ) | 5/25/2012 | 5/25/2012 | 6/22/2012 | | PASS |
Sam Zahorka
|
|
|
1st Building Review completed.
|
Routing - FIRE | 6/20/2012 | | 6/22/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/22/2012 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/22/2012 | | 6/22/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 6/22/2012 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2012 | | DONE |
Christina Prado
|
|
|
called and left message for Steve giving fees due and advising permit is ready to issue pending RP info
|
Permit Ready to Issue | | | 6/22/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/1/2012 | | 6/20/2012 | | PASS |
Sam Zahorka
|
|
|
|
Meeting | | | 6/4/2012 | | DONE |
Sam Zahorka
|
|
|
Meeting with Steve Russell to discuss status of permit. I updated him on the status of the review and gave him a review process flow chart, copy of ACHD approval letter, and an estimated time frame for first review being completed. SRZ
|
Routing - PLUMBING | 5/30/2012 | | 6/1/2012 | | PASS |
Bill VanDegrift
|
|
|
1)R.P. required upstream of evaporative cooling unit fill and drain valve.
2)install floor sinks under P4 and P5.
|
Routing - Erosion and Sediment | 5/29/2012 | | 5/30/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00518 plan waiver approved with additional conditions attached to the permit.
|
Routing - PUBLIC WORKS | 5/25/2012 | | 5/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/25/2012 | | 5/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 5/29/2012 | | 5/29/2012 | | PASS |
Walt Baumgartner
|
|
|
New 1500 gallon grease interceptor OK
|
Pending Assignment by JCB | 5/24/2012 | | 5/25/2012 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 5/25/2012 | | DONE |
Jason Blais
|
|
|
Sent email to architect to have him contact ACHD for evaluation of any impact fees. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 5/25/2012 | | 5/25/2012 | | PASS |
Terry Records
|
|
|
|
Application received | | 5/24/2012 | 5/24/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/24/2012 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/24/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/24/2012 | | DONE |
Christina Prado
|
|
|
|