BLD-Other | 11/21/2012 | 11/23/2012 | 11/23/2012 | A | DONE |
Jim Sly
|
|
|
not sure what type of inspection want?? Needs to be advised as to what inspections needed because project was started several years ago//Daryl Thomas Phone #: ###-#### Met with homeowner. Need to obtain Electrical permit and call for Electrical rough in inspection, prior to calling for a framing inspection.
|
Routing Walk-In (Zoning) | 5/24/2012 | 5/24/2012 | 5/24/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 5/24/2012 | 5/24/2012 | 5/24/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 5/24/2012 | 5/24/2012 | 5/24/2012 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 5/24/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/24/2012 | | |
|
|
|
|
1st review completed | | | 5/24/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/24/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | 5/24/2012 | | | |
|
|
|
|