BLD-Final | 11/13/2012 | 11/13/2012 | 11/13/2012 | P | PASS |
Jim Storey
|
|
|
Jorgan Phone #: ###-#### final ok
|
Permanent Occupancy | | | 11/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled. C/N items finished.
|
BLD-Final | 9/26/2012 | 10/1/2012 | 10/1/2012 | P | PART |
Jim Storey
|
|
|
Paul Phone #: ###-#### 2 hr wall infilled ok 1 1/2 door instal ok. final pending fire spk aproval.
|
FIRE-Final Inspection | 9/26/2012 | 10/1/2012 | 10/1/2012 | A | FAIL |
Forrest France
|
|
|
Correction items are finished with the exception of fire sprinkler permit work to repair coverage deficiencies.
|
BLD-Final | 6/8/2012 | 6/11/2012 | 6/13/2012 | P | NR |
Jim Storey
|
|
|
Jorgan - call 30 mins prior Phone #: ###-####
|
FIRE-Final Inspection | 6/8/2012 | 6/11/2012 | 6/11/2012 | A | FAIL |
Forrest France
|
|
|
Several correction items noted including exit hardware issues, address and signage items, overspaced fire sprinkler coverage, incorrect door swing, unprotected openings in the 2 hour rated wall, racking permit required, etc. No corrections listed for the north building.
|
Issue PAID IN FULL permit | | | 6/8/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/6/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2012 | | |
|
|
|
|
Telephone call | | | 6/6/2012 | | |
|
|
|
6-6-12 called Rick permit ready for pick up ///dld
|
Plan assigned to (TLW) | 5/25/2012 | | 6/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/4/2012 | | 6/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 6/4/2012 | | 6/4/2012 | | PASS |
Scott Arellano
|
|
|
No review is required. Prior plans were apparently approved. This occupancy permit is simply for a change in the company name.
The original main core of the building shall comply with the UFC 1973 edition for which it was installed and approved.
The warehouse and spray paint booth shall comply with the UFC 1979 edition for which it was installed and approved.
The office portions shall comply with the UFC 1985 edition for which it was installed and approved.
See fiche 95###-####4
|
Routing - PLAN CHECK | 5/25/2012 | | 6/1/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/25/2012 | | DONE |
|
|
|
|
Application received | | 5/24/2012 | | | |
|
|
|
|