Permanent Occupancy | | | 6/15/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 6/14/2012 | 6/15/2012 | 6/14/2012 | A | PASS |
Jim Storey
|
|
|
Deven Phone #: ###-####
|
FIRE-Final Inspection | 6/12/2012 | 6/13/2012 | 6/13/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety approved pending two fire extinguishers are posted and door hardware at one location is revised. Remainder of previous correction items are finished.
|
FIRE-Final Inspection | 6/7/2012 | 6/7/2012 | 6/8/2012 | A | NR |
Forrest France
|
|
|
|
BLD-Final | 6/5/2012 | 6/6/2012 | 6/6/2012 | P | NR |
Jim Storey
|
|
|
Devin - call 30 mins prior Phone #: ###-####
|
FIRE-Final Inspection | 6/5/2012 | 6/6/2012 | 6/6/2012 | A | FAIL |
Forrest France
|
|
|
Door hardware at six locations needs revised, missing two fire extinguishers, noted fire sprinkler coverage issues at two locations. See clouded areas and annotations on the permit attatched floorplan/ general requirements pages for details.
|
Permit Ready to Issue | | | 6/5/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/25/2012 | | 6/4/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 5/29/2012 | | 6/4/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/4/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/4/2012 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2012 | | |
|
|
|
6-4-12 called Devin permit ready for pick up ///dld
|
Application received | | 5/25/2012 | 5/29/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/25/2012 | | DONE |
Tisha Gallop
|
|
|
|