Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD12-01330
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1000 W MYRTLE ST
Project NameJUMP - BELOW GRADE PARKING
Customer Number 
ePlanReviewNo
Description
(JUMP - BELOW GRADE PARKING GARAGE) - To construct a new 295,000 square foot, below grade, concrete parking garage and related site improvements. The parking garage concrete lid will be covered with a minimum of 18 inches of soil and sod. This garage will be fully fire sprinkled. This permit is for the below grade parking garage only. There has been no review or approval for any above grade buildings or structures. 12/18/2012 - This permit was modified to include the installation of the tower crane concrete support foundation. 9/25/2013 - This permit was modified to construct an approximate 900 square foot underground concrete utility meter room on the west end of the existing underground parking garage. All construction per the approved plans and attached comment list. JCM **REFER TO ESC12-00403**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/12/2018 DONE
sent 2nd late notice
Print Statement  8/8/2018 DONE
sent 1st late notice
Meeting  5/11/2018 DONE
sent statement 5-14
Print Statement  4/16/2018 DONE
Third Notice 3/25/20184/10/2018 DONE
mailed and emailed 4-10-18 victoria wolter since letter keeps coming back, but victoria states the address we have is correct Victoria-Wolter@Hoffmancorp.com
Second Notice 2/22/20183/20/2018 DONE
Letter came back so emailed over to Victoria Wolter 3-20-18
First Notice 2/8/20182/12/2018 DONE
Mailed 2-13-18
Permanent Occupancy  1/29/2018 DONE
DetailsChristina Prado
BLD-Final1/26/20181/26/20181/26/2018PPASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection1/25/20181/26/20181/26/2018APASS
DetailsJim Page
Final life fire safety inspection complete.
Zoning Approval1/19/20181/19/20181/19/2018 PASS
DetailsSarah Schafer
PubWorks Occupancy Approval1/18/20181/18/20181/18/2018 DONE
DetailsTiffany Lowery
BLD-Aging Inspection12/6/201712/6/201712/14/2017 PEND
DetailsDave Hannah
Temporary Occupancy10/17/20171/15/201810/17/2017 DONE
DetailsCandy A. Nichols
Jason B ok'd extension on temp c of o startng from 10-26-17
Telephone call  10/11/2017 DONE
emailed Angie B that the temp c of o will expire on 10-17-17
BLD-Aging Inspection9/25/20179/25/201710/3/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection7/24/20177/24/20177/28/2017 PASS
DetailsDave Hannah
Temporary Occupancy7/17/201710/15/20177/17/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok'd temp c of o good thru 10/17/17
Meeting  7/6/2017 DONE
emailed Angie that the temp c of o will expire on the 19th of July
BLD-Aging Inspection5/22/20175/22/20175/30/2017 PEND
DetailsDave Hannah
Temporary Occupancy4/11/20177/10/20174/11/2017 DONE
DetailsCandy A. Nichols
as per Jason B - request for extension granted-90 days from 4/20/17
BLD-Aging Inspection3/20/20173/20/20173/28/2017 PEND
DetailsDave Hannah
Meeting  3/22/2017 DONE
emailed Angie that Temp C of O expired on 4/20/17
Temporary Occupancy1/20/20174/20/20171/20/2017 DONE
DetailsCandy A. Nichols
as per Angie B-issue Temp C of O
BLD-Final1/17/20171/17/20171/17/2017PPART
DetailsDave Hannah
Requesting TCO for entire garage. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for tco on entire garage
OVERRIDE  1/17/2017  
CHANGE STATUS TO (ISS)  1/17/2017 DONE
DetailsChristina Prado
Per AJS deferred submittal approval 12/8/16
Routing - PLAN CHECK12/8/2016 12/8/2016 PASS
DetailsAdele J Schaffeld-Griffin
structural review of deferred submittal items stairs, SF01-03 and GR11 and G01- G02 and loading dock below grade and S-BG-G122 approved for structural desing only by Ch2mhl
Permit Ready to Issue  12/8/2016 DONE
DetailsChristina Prado
Per AJS approval
Routing Off Site - STRUCTURAL2/11/2014 12/8/2016 PASS
DetailsJohn Menard
Garage Expansion resubmittals - Per AJS approval
BLD-Final11/16/201611/16/201611/16/2016APART
DetailsDave Hannah
Requesting TCO for below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli ok to use the nw section
FIRE-Final Inspection11/16/201611/16/201611/16/2016APART
DetailsJim Page
Partial final for life fire safety TCO complete, final fire sprinkler inspection complete for below grade parking, fire alarm system has been tested and accepted for TCO, at this time the JUMP fire panel and the Simplot Headquarters fire panel are not integrated together for parking garage notification, this will need to be completed for FIR and BLD permit finals, fire extinguishers are in place with current inspection tags, knox box is in place by fire command, egress/exit lighting has been tested/inspected. Noted that temporary stairs are still in place by the annex stariwell in the parking garage, TCO will be subject to building inspection acceptance of stairs due to this being an egress point. All area's associated with the BLD and FIR permits will be subject to a final walk through prior to permit final to verify no alterations have been made to items accepted for TCO in regards to life fire safety.
BLD-Final11/15/201611/15/201611/16/2016PCANC
DetailsDave Hannah
Requesting TCO for below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Final Inspection11/15/201611/15/201611/15/2016PCANC
DetailsJim Page
Inspection request rescheduled for 16NOV2016
FIRE-Alarm Testing11/10/201611/14/201611/14/2016ACANC
DetailsJim Page
Alarm testing was for simplot world headquarters parking level.
Additional plans submitted  11/9/2016 DONE
deferred submittals for stair S-BG-1019 (room OB-G122) below grade garage expansion
Additional plans submitted  11/9/2016 DONE
Defferred submittals fpr GR-11 below grade garage expansion
Additional plans submitted  11/9/2016  
Deferred Submittals for loading dock gaurdrail below grade garage expansion
Additional plans submitted  11/9/2016 DONE
Deferred Submittals for stairs G-01 & G-02 below grade garage expansion
Additional plans submitted  11/9/2016 DONE
Deferred Submittals for stairs SF-01 & SF-03 below grade garage expansion
BLD-Conference11/3/201611/4/201611/4/2016APEND
DetailsDave Hannah
Requesting walk through and TCO status review of below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Framing/Rough-in9/8/20169/9/20169/9/2016APASS
DetailsDave Hannah
Armondo-please call 20 minutes prior to meet-garage expansion in baseement-3 bathrooms Phone #: ###-####
BLD-Framing/Rough-in2/18/20162/18/20162/19/2016PPART
DetailsDave Hannah
garage expansion... call 15 mintues before to meet // Nel Phone #: ###-#### shaft in basement ok to cover
BLD-Framing/Rough-in12/17/201512/18/201512/18/2015APASS
DetailsDave Hannah
Garage expantion // Nyl Phone #: ###-#### ok to cover shafts in basement large air handlers
BLD-Framing/Rough-in12/10/201512/11/201512/11/2015APART
DetailsDave Hannah
Neil Phone #: ###-#### looked at shafts and wall and ceiling furring ok to cover
BLD-Framing/Rough-in11/4/201511/5/201511/5/2015APASS
DetailsMike Jordan
Interior stel stud fur outs in basement, as well as top of wall firecaulking.
BLD-Framing/Rough-in11/3/201511/4/201511/4/2015ACANC
DetailsMike Jordan
Neal Phone #: ###-####
Routing PW Street Lights8/21/2014 9/25/2015 PASS
DetailsMike D Hedge
No street light plans.
Plan Reviewer's activity  3/26/2015 DONE
DetailsJohn Menard
Taken to front counter for issue of Plan modification for revisions to civil drawings, bioretention area, seepage beds & misc site changes. Plans affected are AG-0-00-B, CG2-02-0-EX & CG1-04-0-EX
Telephone call  3/26/2015 DONE
DetailsChristina Prado
Called Mark to advise plan mod is approved, no fees due
Routing PW Drainage3/20/2015 3/20/2015 PASS
DetailsBrian Murphy
Plan Modification Accepted  3/3/2015 DONE
DetailsChristina Prado
Plan modification accepted for revisions to civil drawings, bioretention area, seepage beds & misc site changes. Plans affected are AG-0-00-B, CG2-02-0-EX & CG1-04-0-EX; Plans taken to John Menard for further review
OVERRIDE  1/12/2015  
CHANGE STATUS TO (ISS)  1/12/2015 DONE
Permit Ready to Issue  1/12/2015 DONE
Plan assigned to (JCM)10/30/2014 12/8/2014 PASS
DetailsJohn Menard
Plan Modification
Routing PW Drainage12/2/2014 12/8/2014 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL12/3/2014 12/8/2014 PASS
DetailsJohn Menard
Drainage seepage bed surcharge loads on foundation walls. Review requested by Brian Murphy.
Routing - PUBLIC WORKS12/8/2014 12/8/2014 PASS
DetailsJennifer Bruner
Routing - PLAN CHECK12/8/2014 12/8/2014 PASS
DetailsJohn Menard
Plan mod for seepage beds, grease interceptors and door hardware.
Permit Ready to Issue  12/8/2014  
Telephone call  12/8/2014 DONE
DetailsCandy A. Nichols
called Noelle to let know plan mod was ready and how much is owed-left message on her phone
Plan resubmittals received  12/2/2014 DONE
Received revisions for modification for seepage beds. Structural calcs for geotech, sheets CG1-04-0-EX, CG2-02-0-EX, SG-3-00-G, SG-3-00-1, SG-5-01
Routing PW Street Lights11/21/2014 11/21/2014 PASS
DetailsMike D Hedge
Routing - PLUMBING11/17/2014 11/17/2014 PASS
DetailsDaryl Spivey
Routing PW Sewer Design11/5/2014 11/17/2014 PASS
DetailsKyle S. Rosenmeyer
Still waiting for updated sewer plan but Stephen with MKA has indicated revised plans will come in with SWHQ permit.
Routing PW Environmental11/13/2014 11/14/2014 PASS
DetailsRick Christenson
Called Danny Basil to confirm Covered Parking Drains connect to sewer.
Routing - PUBLIC WORKS11/5/2014 11/12/2014 FAIL
DetailsJennifer Bruner
See Drainage
Routing PW Drainage11/6/2014 11/10/2014 FAIL
DetailsBrian Murphy
NEED LATEST CHANGES AND STRUCURAL LETTER
Routing - PLAN CHECK10/29/2014 10/30/2014  
DetailsJohn Menard
Plan Modification Accepted  10/29/2014 DONE
DetailsChristina Prado
Received two sets of revised plan sheets for plan modifications to below grade parking garage expansion. Expansion ASI 43 Addendum 28 - civil changes, including adjustments to the seepage beds. Expansion CO-005.001 Addendum 26 provides MEP updates. ASI 44 Addendum 29 has architectural updates to the door schedule, including security & hardware revisions. Plans accepted and taken John Menard for further review
Telephone call  10/10/2014 DONE
DetailsTisha Gallop
called Noelle and left vm deferred submittal for Glass Guardrails in Gage level 5 ready for pick up.
CHANGE STATUS TO (ISS)  10/8/2014 DONE
DetailsChristina Prado
(F) Reprint permit  10/8/2014 DONE
DetailsChristina Prado
OVERRIDE  10/7/2014  
Plan assigned to (JCM)5/21/20145/21/201410/7/2014 PASS
DetailsJohn Menard
plan mod for generator room
Plan assigned to (JCM)12/13/201312/13/201310/7/2014 PASS
DetailsJohn Menard
plan modification/expansion
Routing - PLAN CHECK9/22/2014 10/7/2014 PASS
DetailsJohn Menard
Telephone call  10/7/2014 DONE
DetailsChristina Prado
called Mark Bowen to advise plan mod is ready and gave fees due
Permit Ready to Issue  10/7/2014 DONE
DetailsChristina Prado
Routing Off Site - STRUCTURAL9/8/2014 10/6/2014 PASS
DetailsJohn Menard
Garage expansion resub - Received letter from consulting structural engineer approving garage expansion. JCM
Routing - MECHANICAL9/12/2014 9/22/2014 PASS
DetailsTroy James
Routing - PLUMBING8/27/2014 9/12/2014 PASS
Per plan and ISPC.
Plan resubmittals received  9/8/2014 DONE
DetailsCandy A. Nichols
received 3 struc calcs on grade parking garage Jack's Urban Meeting Place-took to John M
Plan resubmittals received  9/4/2014 DONE
received two copies of electrical sheets-inserted and taken back to plumbing review
Routing Off Site - STRUCTURAL8/12/2014 9/3/2014 FAIL
DetailsJohn Menard
Garage expansion resubmittals
Routing - PUBLIC WORKS8/20/2014 8/27/2014 FAIL
DetailsBeverly Mountain
Street Lights failed.
Routing PW Geothermal8/27/2014 8/27/2014 PASS
DetailsJon R. Gunnerson
Routing PW Sewer Design8/22/2014 8/22/2014 PASS
DetailsKyle S. Rosenmeyer
Utilties to be submitted under plan modification for Jump Shell/Core BLD13-00016
Plan resubmittals received  8/12/2014 DONE
DetailsTisha Gallop
received three copies of plan sheets PG-0-04, PG-1-00, PG-2-00A, PG-2-00F, PG-2-00G, PG-2-00H, PG-2-00I, PG-5-05; inserted by arch. rep. and taken back to John Menard. Third copy in Angie Brosious office.
Plan resubmittals received  8/8/2014 DONE
DetailsTisha Gallop
Received response and two copies of plan sheets, AG-1-03-N, AG-3-00-A, AG-3-00-F, AG-3-00-G, AG-3-00-H, AG-3-00-1, AG-3-01-F, AG-3-01-G, AG-3-01-H, AG-4-00-A, AG-4-00-F, AG-4-00-G, AG-4-00-H, AG-4-00-I, AG-5-02, AG-7-01, AG-7-04, AG-7-18, AG-9-01, AG-9-02, AG-9-03, AG-9-04, D-09, D-11, D-12, D-13, D-14, D-15, D-17, PG-0-04, PG-1-00, PG-2-00A, PG-2-00B, PG-2-00F, PG-2-00G, PG-2-00H, PG-2-00I, PG-5-05, MG-0-01, MG-0-11, MG-0-12, MG-2-00, MG-2-00B, MG-2-00F, MG-2-00G, MG-2-00H, MG-2-00I, MG-2-01, MG-2-01F, EG-0-01, EG-2-00-A, EG-2-00-B, EG-2-00-C, EG-2-00-D, EG-2-00-E, EG-2-00-F, EG-2-00-G, EG-2-00-H, EG-2-00-I, EG-7-06, EG-3-00 series, EG-3-00-F, EG-3-00-H, EG-4 series, EG-6 series, EG-7-03, three copies of complete structrual set of plans and calculations; inserted by arch. rep. and given to Angie Brosious.
Routing - PLAN CHECK8/1/2014 8/4/2014 PASS
DetailsJohn Menard
Approved plan modification for the changes to the relocated electrical generator enclosure. JCM
Telephone call  8/4/2014 DONE
DetailsTisha Gallop
called Noelle and told her plan mod for generator room is ready and fee due.
Routing - FIRE7/31/2014 8/1/2014 PASS
Details
See Fire Plan Review Mod Rev 1 08-01-14
Plan resubmittals received  7/31/2014 DONE
DetailsTisha Gallop
response to plan review comments for plan modification; received three copies of response, three copies of specs for generator, and three copies of plan sheets AG-0-00-B, AG-7-13, PG-0-03, PG-3-01, PG-5-03, EG-4-10; taken to John Menard.
Routing - FIRE5/22/2014 5/28/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review Mod ESPS 05-28-14
Plan Reviewer's activity  5/22/2014 DONE
DetailsJohn Menard
Reviewed and approved plan modification to enlarge the proposed below grade emergency generator concrete enclosure. JCM
Routing - PLAN CHECK5/22/2014 5/22/2014 PASS
DetailsJohn Menard
CHANGE STATUS TO (ISS)  5/21/2014 DONE
DetailsTisha Gallop
keep permit in ISS status
Plan Modification Accepted  5/21/2014 DONE
DetailsTisha Gallop
plan modification accepted to revise the size of the generator room; submitted on plan sheets AG-0-00-B, AG-7-13; routed to John Menard.
Plan resubmittals requested  4/25/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the review letter requesting additional revisions. JCM
Plan resubmittals received  4/22/2014 DONE
DetailsTisha Gallop
received revised drainage plan sheet CG1-04-0 (5 large plan sheets, two 18x24); inserted by Noelle and taken back to John Menard.
Routing PW Drainage4/7/2014 4/18/2014 PASS
DetailsBrian Murphy
Routing PW Sewer Design4/14/2014 4/16/2014 PASS
DetailsKyle S. Rosenmeyer
Routed two copies of revised civil sheet and small document. JCM
Plan resubmittals received  4/11/2014 DONE
DetailsChristina Prado
Resubs for 2/4/14 plan mod - Received one response letter, two revised structural calcs, two revised temp ESC narratives and two sets of revised plan sheets marked CG1-01-0, CG1-01-1, CG1-02-0, CG1-03-0, CG1-04-0, CG1-05-0, CG1-06-1, CG2-01-0 & CG2-02-0;Plans taken to John Menard for further review
Routing PW Sewer Design4/4/2014 4/7/2014 FAIL
DetailsKyle S. Rosenmeyer
Waiting for updated sheets.
Routing - MECHANICAL4/2/2014 4/3/2014 PASS
DetailsTroy James
Fees Due Hold3/22/2014 4/2/2014 DONE
DetailsChristina Prado
Routing - PLUMBING3/31/2014 4/2/2014 FAIL
DetailsDaryl Spivey
In the emergency generator and fuel tank area page PG2 -00G, the AD!'s are required to drain to sanitary waste not into storm drain as shown.
The 2 sets of resubmittals do not match. provide one set of plans with highlighted areas of changes made to original plans.
CHANGE STATUS TO (ISS)  3/21/2014  
keep permit in ISS status
Plan Reviewer's activity  3/21/2014 DONE
DetailsJohn Menard
Took the approved plans for the tower crane foundations plan modification to the front counter to issue. JCM
Routing Off Site - STRUCTURAL3/7/2014 3/7/2014 PASS
DetailsJohn Menard
E-mailed the consulting engineer a copy of the response letter for the tower crane supports. JCM
Plan resubmittals received  3/6/2014 DONE
DetailsTisha Gallop
received 1st response to plan mod #4 (garage expansion); received three copies of response to structural review (2pgs), three copies of civil response (3pgs), two copies of response specs (addendum 20/ASI35), and two copies of plan sheets AG-3-00-A, AG-3-00-F, AG-3-00-G, AG-3-00-H, AG-4-00-F, AG-4-00-G, AG-4-00-H, AG-9-01, AG-9-02, AG-9-03, AG-9-04, D-09, D-11, D-12, D-15, PG-1-00, PG-2-00A, PG-2-00B, PG-2-00F, PG-2-00G, PG-2-00H, PG-2-00I, PG-5-05, EG-0-10, EG-3-00-F, MG-2-00-F; inserted by Noelle and taken back to John Menard.
Routing Off Site - STRUCTURAL2/11/2014 2/17/2014 PASS
DetailsJohn Menard
Garage expansion resubmittals. JCM
Routing - Erosion and Sediment2/11/2014 2/13/2014 PASS
DetailsEvan Jenkins
ACHD Approved prior to submission and approval by the City
Plan resubmittals requested  2/11/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the two new proposed tower support pads. JCM
Routing - PLAN CHECK1/31/2014 2/11/2014  
DetailsJohn Menard
Routing Off Site - STRUCTURAL2/4/2014 2/11/2014 FAIL
DetailsJohn Menard
plan mod (6) - tower crane - Received letter from consulting engineer requesting calculation revision. JCM
Telephone call  2/11/2014 DONE
DetailsChristina Prado
called Action Couiers for pick up
Plan resubmittals received  2/10/2014 DONE
DetailsChristina Prado
Received three sets of revised structural calcs, three sets of revised plan sheets marked SG-1-03, SG-3-00-A, SG-3-00-B, SG-3-00-F SG-3-00-G & SG-5-01, as well as two sets of revised plan sheets marked CG1-02-0 & CG2-01-0 and one set ACHD approval docs; Plans taken to John Menard for further review
Route to Impact Fee Review1/28/20141/31/20142/5/2014 PASS
DetailsCindy M. Gould
Plan Modification Accepted  2/4/2014 DONE
DetailsTisha Gallop
separate plan modification acceted to install tower crane for construction purposes; submitted on plan sheets SG-0-01, SG-0-02, SG-0-03, SG-1-21, SG-1-22, SG-1-23, structural calcs and revised cert of value that adds $100,000 to project value; routed to John Menard.
Telephone call  2/4/2014 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - FIRE1/28/20141/28/20141/31/2014 PASS
DetailsScott Arellano
Attached updated comments to plans.
Routing - PLAN CHECK1/13/2014 1/28/2014 FAIL
DetailsJohn Menard
John Menard
Plan resubmittals requested  1/28/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review comment list for the JUMP basement garage expansion plan modification. JCM
Routing - MECHANICAL1/7/2014 1/23/2014 FAIL
DetailsTroy James
Routing - PLANNING1/13/2014 1/13/2014 PASS
DetailsSarah Schafer
Approved.
Routing - PLUMBING12/24/2013 1/7/2014 FAIL
DetailsDaryl Spivey
1. 1. Where grid lines E-1 and EC connect on page PG-2-00G an 8 inch SPPD is draining into a 6 inch SD. Cannot reduce in size. SD required to be 8 inch.
2. Oil-flammable interceptor tanks need to be vented and vents to be ran seperately from sanitary vents.
3. In emergency generator and fuel tank area the two AD-1's are required to drain to sanitary not storm drain as shown.
4. All inside ED drains to be ran to sanitary.
Plan resubmittals requested  12/26/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan mod structural review.
Routing Off Site - STRUCTURAL12/26/2013 12/26/2013 FAIL
DetailsJason Blais
Emailed out correction items.
Routing - Erosion and Sediment12/20/2013 12/23/2013 FAIL
DetailsEvan Jenkins
Project does not have an approved groundwater dewatering plan; new submittal does not have a modified ESC plan to show changes at site.
Routing - PUBLIC WORKS12/13/2013 12/20/2013 FAIL
DetailsConnie Baumgartner
failed by Brian Murphy and Kyle Rosenmeyer
Routing PW Sewer Design12/16/2013 12/20/2013 FAIL
DetailsKyle S. Rosenmeyer
Update Sewer Plan (Sheet CG1-04-0) and re-submit.
Routing PW Geothermal12/20/2013 12/20/2013 PASS
DetailsJon R. Gunnerson
Plans worked out with Simplot (Mark Bowen) to provide geothermal service. Construction to begin March 1, 2014.
Plan resubmittals received  12/20/2013 DONE
DetailsTisha Gallop
received three copies of project narrative (1 pg) and five copies of plan sheets CG1-04-0, CG2-01-0; inserted by arch. rep. and taken back to Erosion.
Routing PW Drainage12/17/2013 12/19/2013 FAIL
DetailsBrian Murphy
failed by Brian Murphy.
Routing - Addressing  12/16/2013 PASS
Routing - PLANNING Land Div12/13/2013 12/13/2013 PASS
DetailsDave Abo
Included in OSL Condominiums.
CHANGE STATUS TO (ISS)  12/13/2013 DONE
DetailsTisha Gallop
keep permit in ISS status during plan mod reviews
Plan Modification Accepted  12/11/2013 DONE
DetailsTisha Gallop
Plan modification #4 accepted fto expand the below grade parking garage; routed to all departments.
Print Occupancy Form  12/9/2013 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  12/9/2013  
DetailsTisha Gallop
keep permit in ISS status regardless of plan mods.
Telephone call  12/9/2013 DONE
DetailsTisha Gallop
called Noelle and told her revisions to plan mod 3 are ready, fee due.
Plan assigned to (JCM)9/13/20139/13/201312/6/2013 PASS
DetailsJohn Menard
Routing - PLAN CHECK9/13/2013 12/6/2013 PASS
DetailsJohn Menard
Reviewed and approved nonstructural and final two comments of structural review. JCM
Plan resubmittals received  11/5/2013  
11-5-13 received 3 response sent to John M
Plan resubmittals requested  10/22/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review comments for the meter vault plan modification. JCM
Plan Reviewer's activity  10/10/2013 PASS
DetailsJohn Menard
For plans and structural calculations for the deferred submittal of the below grade parking precast stairs. JCM
Routing Off Site - STRUCTURAL9/30/2013 10/5/2013 FAIL
DetailsJohn Menard
9-30-13 called Action courier for plan mod pick up - Received comment list from consulting structural engineer requesting revisions for the meter vault plan modification. JCM
CHANGE STATUS TO (ISS)  10/1/2013 DONE
picked up and paid for plan mod
Additional plans submitted  9/30/2013 DONE
Rec'd deffered submittal for precast stairs in the below grade garage - three copies of calcs and sheets E0.1; E1.0; E1.1; E1.2; E1.3; E2.0; E2.1; E2.2; E3.0
Routing - PLUMBING9/26/2013 9/30/2013 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLUMBING9/26/2013 9/30/2013 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Print Occupancy Form  9/13/2013 DONE
DetailsBarbara Stitt
Telephone call  9/13/2013  
9-13 13 called
Plan Modification Accepted  9/13/2013  
9-13-13 Plan Modification excepted for BLD12-01330 To add a utility meter room to the SW corner of the below-grade parking garage. pages G-0-00-B,AG-0-01,AG-0-01-S,AG-1-00,AG-2-00-S,AG-3-00-D,AG-3-01-D,AG-4-00,AG-4-00-D,AG-7-15,AG-7-16, Details- 3903,6201,6202,6304,6305, SG-3-00-D,SG-3-01-D,SG-6-02,EG-4-03,PG-2-00D Sent to John M
Routing - PLAN CHECK8/13/2013 9/12/2013 PASS
DetailsJohn Menard
Plan assigned to (JCM)3/14/2013 9/12/2013 PASS
DetailsJohn Menard
1st Review completed on Plan Mod 4/4/2013. JCM
Plan resubmittals received  8/13/2013 DONE
DetailsChristina Prado
received two sets of revised plan sheets marked AG-0-00-B, AG-1-00, AG-1-01, AG-2-00-S, AG-3-00-C, AG-3-01-C, AG-4-00, AG, 4-00-C, AG-0-00-B, AG-1-00, AG-1-01, AG-2-00-S, AG-3-00-C, AG-3-01-C, AG-4-00, AG-4-00-C, AG-7-13, SG-3-01-C, SG-4-01, EG-4-10, EG-7-04, PG-3-01, MG-2-00, MG-2-00-C, MG-4-02, AG-7-13, AG-0-00-B, AG-1-00, AG-1-01, AG-2-00-S, AG-3-00-C, AG-3-01-C, AG-4-00 & AG-4-00-C as well as two plan review response letter. Plans taken to John Menard for review
Plan Reviewer's activity  6/12/2013 DONE
DetailsJohn Menard
E-mailed the architect a letter requesting revisions on generator enclosure. JCM
Routing Off Site - STRUCTURAL5/16/2013 5/17/2013 PASS
DetailsJohn Menard
5-16-13 called Action Couriers for resubmittal pick up
Received e-mail from consulting structural engineer approving generator room resubmittals. JCM
Plan resubmittals received  5/14/2013  
5-14-13 received 1 response,structural calc, and 1 extra copy of sheets AG-0-00-B, AG-7-13, SG-3-00-C, SG-4-01 sent to John M
Plan resubmittals received  5/10/2013  
5-10-13 received 2 response letters for Angie Brosious & John Menard,2 structural calcs & 2 copies of sheets AG-0-00-B, AG-7-13, AG-3-00-C, SG-4-01 sent to John M
Routing - PLAN CHECK4/2/2013 4/4/2013 FAIL
DetailsJohn Menard
Still waiting for revisions for Plan review as of 7/17/2013
Plan resubmittals requested  4/4/2013 DONE
DetailsJohn Menard
E-mailed the applicant requesting revisions for the generator plans modification. JCM
Plan resubmittals requested  4/3/2013 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review for the plan modification to relocate the generator. JCM
Routing - FIRE3/19/2013 4/2/2013 PASS
DetailsScott Arellano
No new comments attached.
Routing Off Site - STRUCTURAL3/19/2013 3/25/2013 FAIL
DetailsJohn Menard
Called Action Courier for pick up on 3-19-13 @ 10:00am//BAS
Routing - PLAN CHECK3/14/2013 3/19/2013  
DetailsJohn Menard
BLD-Concrete3/7/20133/12/20133/15/2013APASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/13/20133/15/2013APASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/14/20133/15/2013PPASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
Plan Modification Accepted  3/14/2013  
Plan Modification Accepted FOR BLD12-01330 for the revised location of the generator(it is now being shown below-grade in an enclosed structure at the DE corner of the site. Pages affected AG-0-00-B,AG-1-00,AG-1-01,AG-2-00-S,AG-2-01-S,AG-3-00-C,AG-3-01-C,AG-4-00,AG-4-00-C,AG-7-13, SG-3-00-C,SG-3-01-C,SG-4-01, EG-3-00,EG-4-10,EG-6-02,EG-7-02,EG-7-04, PG-0-01,PG-0-02,PG-0-03,PG-3-01,PG-5-04
BLD-Concrete3/7/20133/8/20133/13/2013APASS
DetailsDave Hannah
pressure slab/foundation/columns/wall concrete placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/11/20133/12/2013PPART
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy slab on grade ane wall ok spec strata on site
BLD-Concrete3/7/20133/7/20133/12/2013PPASS
DetailsDave Hannah
pressure slab/foundation Phone #: ###-#### >> Inspection requested via web by Brian Murphy
Additional plans submitted  2/27/2013 DONE
Received plans for RFI 144, removal of door in electrical room. This change received preliminary review and approval from John Menard and Doug Peody on 1/9/2013. Received two copies of AG-3-00-D and EG-4-0 and two page detail of the request.Gave to John Menard to approve.
BLD-Concrete2/20/20132/22/20132/22/2013APART
DetailsDave Hannah
rebar coupler installation Phone #: ###-#### >> Inspection requested via web by Brian Murphy couplers have not been started but crews are placeing concrete on second deck puor
BLD-Concrete2/20/20132/21/20132/22/2013PPART
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew working on rebar and inbeds al with mti will do final rebar inspection befor concrete placement.
BLD-Concrete2/20/20132/21/20132/21/2013APART
DetailsDave Hannah
elevated slab placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew still working on rebar second elev slab Al with mti will do final rebar placement inspection
BLD-Concrete2/11/20132/12/20132/14/2013PPASS
DetailsDave Hannah
Helix Core wall concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/13/20132/14/2013APASS
DetailsDave Hannah
Excterior Wall Placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/13/20132/14/2013PPASS
DetailsDave Hannah
Slab on Grade concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/11/20132/12/2013PPASS
DetailsDave Hannah
Elevated Slab concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/29/20131/29/20131/30/2013ACANC
DetailsDave Hannah
BLD-Concrete1/28/20131/28/20131/30/2013ACANC
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/23/20131/25/20131/28/2013APART
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/23/20131/24/20131/24/2013APART
DetailsTom Arcoraci
slab/foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy wip
BLD-Concrete12/27/20121/2/20131/2/2013APART
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/27/201212/28/201212/28/2012PPART
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/27/201212/28/201212/28/2012APASS
DetailsDave Hannah
foundation wall, tower crane foundation. Phone #: ###-#### >> Inspection requested via web by Brian Murphy
CHANGE STATUS TO (ISS)  12/26/2012 DONE
(F) Reprint permit  12/26/2012 DONE
BLD-Concrete12/18/201212/18/201212/19/2012PPASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
Routing - PLAN CHECK12/14/2012 12/19/2012 PASS
DetailsJohn Menard
Approved plan modification for the tower crane foundation. JCM
Telephone call  12/19/2012 DONE
DetailsBarbara Stitt
Called Noelle and told her that permit is ready & fees due on 12-19-12 @ 3:50pm///BAS
BLD-Concrete12/10/201212/17/201212/18/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
Routing Off Site - STRUCTURAL12/14/2012 12/18/2012 PASS
DetailsJohn Menard
12-14-12 called Action Couriers for pick up ///dld - Received letter from consulting structural engineer approving plans and calculations for the tower crane foundation. JCM
BLD-Concrete12/10/201212/14/201212/14/2012APART
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/13/201212/13/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/12/201212/12/2012APART
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy walked project with spec inspector crews are placing concrete 700 yards for core foundation
Plan Modification Accepted  12/12/2012 DONE
Plan Mod rec'd to install tower crane - sheets SG-0-01; SG-0-02; SG-0-03; SG-1-11; SG-1-12 and calcs - taken to John M
BLD-Concrete12/10/201212/11/201212/11/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew placing section by office
BLD-Concrete11/30/201212/7/201212/7/2012APART
DetailsDave Hannah
wall/slab foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crews working on rebar
BLD-Concrete11/30/201212/6/201212/6/2012APART
DetailsDave Hannah
wall/slab foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/5/201212/6/2012ACANC
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/4/201212/5/2012APART
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/3/201212/4/2012APART
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/30/201212/3/2012APASS
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/29/201211/30/2012APASS
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/28/201211/29/2012ACANC
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/21/201211/28/201211/29/2012PPART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy meet with spec insp walked site wall ok
BLD-Foundation11/21/201211/27/201211/28/2012APART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/21/201211/26/201211/28/2012APART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy wall along 9th SPEC .INSP OKED
BLD-Concrete11/21/201211/26/201211/28/2012APART
DetailsDave Hannah
pressure slab placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/13/201211/15/201211/15/2012PPASS
DetailsTom Arcoraci
slab/foundation rebar and concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/13/201211/15/201211/15/2012APART
DetailsMike Jordan
vault wall rebar concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy. work in progress on vault wall. Ok to place after special inspection final approval.
BLD-Conference11/13/201211/15/201211/13/2012PCANC
DetailsDave Hannah
vault wall rebar/ concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy Inspection cancelled from web by: Brian Murphy
BLD-Conference11/13/201211/15/201211/13/2012ACANC
DetailsDave Hannah
slab footing concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy Inspection cancelled from web by: Brian Murphy
BLD-Foundation11/1/201211/2/201211/6/2012APART
DetailsDave Hannah
foundation /slab on grade concrete placement fri 11-2 8am Phone #: ###-#### >> Inspection requested via web by Brian Murphy second slab pour along east end of project ok to place
Plan resubmittals received  11/2/2012  
Recieved 2 copies of Adjacency of temporary & perm swales to basement wall, ans 2 copies of sheets CG2-01-0 and taken to Brian Murphy
BLD-Foundation10/18/201210/19/201210/22/2012APART
DetailsDave Hannah
Brian Murphy Phone #: ###-#### todate crews have been working on under ground plumbing and elec they have also been placing concrete for elev and elec pits
BLD-Footing10/18/201210/19/201210/22/2012APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Brian Murphy first section of basement parking garage slab and column footings
Issue PAID IN FULL permit  8/1/2012 DONE
DetailsBarbara Stitt
Plan assigned to (JCM) 5/30/20127/25/2012 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS7/20/2012 7/25/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage7/20/2012 7/25/2012 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/25/2012 7/25/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  7/25/2012 DONE
DetailsJohn Menard
Print Occupancy Form  7/25/2012 DONE
Permit Ready to Issue  7/25/2012 DONE
DetailsBarbara Stitt
Telephone call  7/25/2012 DONE
DetailsBarbara Stitt
Left message for Noelle that permit is ready, fees due, need ACHD information and GC information on 7/25/12 @ 3:45pm//BAS
Plan resubmittals received  7/24/2012 DONE
rec'd three copies of sheets CH1-02-0; CG1-05-0; & CG2-01-0
Plan resubmittals received  7/20/2012 DONE
DetailsAlexandra L. DeYoung
Rec'd 5 copies of drainage report and O&Ms. Rec'd three copies of sheets CG1-01-0; CG1-02-0; CG1-03-0; CG1-04-0; CG1-05-0; CG2-01-0; CG2-02-0 - inserted by rep and routed to PW.
Route to Impact Fee Review6/21/20126/26/20127/17/2012 PASS
DetailsCindy M. Gould
Routing PW Drainage7/12/2012 7/13/2012 FAIL
DetailsBrian Murphy
NEED DRAINAGE PLAN WITH SWALE, ELEVATIONS AND SWALE DETAILMUST INCLUDE ASTM C-33 SAND.
Routing Off Site - STRUCTURAL7/5/2012 7/12/2012 PASS
DetailsJohn Menard
Received letter from consulting engineer approving structural revisions. JCM
Routing - PLAN CHECK6/25/2012 7/12/2012  
DetailsJohn Menard
Plan resubmittals received  7/5/2012 DONE
DetailsChristina Prado
Received 4 sets of plans marked MG-0-01, AG-0-00-B, AG-0-00-F, AG-0-00-LS, AG-9-00, D-13, SG-0-02, SG-3-00-B, SG-3-00-C, SG-3-00-D, SG-5-04, S3-01-A & S5-21. two sets inserted by arch rep and the other two taken to John Menard. Also received 2 sets of form310; 2 sets of drainage review; 3 sets additional calcs for structural review; 4 sets of structural review response letter; and 4 sets plan review response letter. All small docs taken to John Menard
Telephone call  7/5/2012 DONE
DetailsChristina Prado
called action couriers for pick up
Routing - FIRE6/21/20126/21/20126/25/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/25/2012 FAIL
Failed Public Works, Plan Check
Plan resubmittals requested  6/21/2012 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review report requesting revisions. JCM
Routing - PLAN CHECK6/12/2012 6/21/2012 FAIL
DetailsJohn Menard
Routing - PLANNING6/20/2012 6/20/2012 PASS
DetailsSarah Schafer
Approved per DRH10-00178.
Plan resubmittals requested  6/18/2012 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL5/30/2012 6/15/2012 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING6/7/2012 6/12/2012 FAIL
DetailsSarah Schafer
At the base of the ramp there is an additional access point adjacent the motorcycle parking. There may be additional conflict at this location. I have been in contact with Mark Bowen and he is going to discuss with the rest of the team. He will let me know the reason for the two access locations and if they can make the one adjacent the motorcycle parking smaller for motorcycle access only.
Routing - PLUMBING6/6/2012 6/7/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing - Erosion and Sediment6/5/2012 6/6/2012 PASS
DetailsClint A Smith
REFER TO ESC12-00403
Routing PW Sewer Design6/4/2012 6/5/2012 PASS
DetailsJon R. Gunnerson
Stub for connection to SSMH 73A.
Routing - PUBLIC WORKS5/30/2012 6/5/2012 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy for drainage issues. ###-####
Routing PW Drainage5/31/2012 6/4/2012 FAIL
DetailsBrian Murphy
NEEDS DRAINAGE PLAN FOR LID, CALCS REVISED O AND M PLUS A STAMP ON THE GRADING PLAN. NO ACHD APPROVAL LETTER TO GO TO ACHD SYSTEM AS MENTIONED IN DRAINAGE REPORT
Application received 5/29/20126/1/2012  
Routing PW Sewer Rating5/31/2012 5/31/2012 PASS
DetailsConnie Baumgartner
Routing PW Environmental5/30/2012 5/30/2012 PASS
DetailsWalt Baumgartner
Pretreatement Group - Reviewed storm drainage versus sewer designated drainage. Stormwater and foundation dewatering are prohibited discharges to sanitary sewer. Plumbing Supervisor will review and confirm segragated systems.
Telephone call  5/30/2012 DONE
DetailsChristina Prado
called action couriers for pick up
Pending Assignment by JCM5/29/2012 5/30/2012 DONE
DetailsJohn Menard
Routing - PLANNING Land Div5/30/2012 5/30/2012 PASS
DetailsDave Abo
Parcel J on ROS 9185.
Plans ACCEPTED BY PLAN TECH  5/29/2012 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/29/2012 DONE
DetailsChristina Prado
BLD-Concrete12/27/20121/3/2013 A 
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy
Routing Off Site - STRUCTURAL11/9/2016    
5 deferred submittals swent to off site engineering-1. SF-01 &Sf-03 below grade garage expansion 2. G-01 & G-02 below grade garage expansion 3. loading dock guardrail below grade garage expansion 4. Gr-11 below grade garage expansion & 5.Stair S-BG-1019 (room OB-G122) below grade garage expansion-all 5 went to CH2MHill