Permit Information
Permit NumberBLD12-01331
StatusIssued
Name CMC CONSTRUCTION
Site Address 10150 W HARVESTER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 1013s.f. to an existing 1369s.f. 1-story 3-bedroom single family dwelling. the addition will include two new accessable bedrooms bathroom, and family room. R-1B ok per David Moser. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked, energy option 1 prescriptive, ACCA report and the plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance7/19/20127/20/20127/20/2012APASS
DetailsMike Jordan
BLD-Framing/Rough-in7/20/20127/20/20127/20/2012APASS
DetailsMike Jordan
All framing issues have been repaired.
BLD-Energy code compliance7/18/20127/19/20127/19/2012PNR
DetailsMike Jordan
Phone #: ###-####
BLD-Framing/Rough-in7/17/20127/18/20127/18/2012AFAIL
DetailsMike Jordan
robert Phone #: ###-####. Provide the 2x4 scabs on top chords of trusses C3,C4, and CE5 asper the truss engineering. Strap top plate at gas penetration and strap the double LVL to trimmers by existing structure, ok to insulate. Correction notice posted.
BLD-Footing6/14/20126/15/20126/15/2012APASS
DetailsTom Arcoraci
Chris Phone #: ###-#### wip ok
Issue PAID IN FULL permit  6/1/2012 DONE
DetailsBarbara Stitt
Plan assigned to (PEP)5/30/20125/30/20125/30/2012 PASS
DetailsPerry Paine
Case Summary (BLD)  5/30/2012  
Inspection Record Card- Bld  5/30/2012  
1st review completed  5/30/2012 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/30/2012 DONE
Permit Ready to Issue  5/30/2012  
Telephone call  5/30/2012  
5-30-12 called Robert permit ready and fee given Need RP before issue ///dld
Routing - MECHANICAL5/29/2012 5/30/2012 PASS
DetailsTroy James
For ACCA Review
Application received 5/29/20125/29/2012 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)5/29/20125/29/20125/29/2012PPASS
DetailsDavid Moser
Routing Walk-In (BLD)5/29/20125/29/20125/29/2012PPASS
DetailsPerry Paine
need ACCA Review Routed to Mech....Troy James
Routing - PLAN CHECK5/30/2012    
DetailsPerry Paine