Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01369
StatusFinaled
Name RMH COMPANY
Site Address 1161 W RIVER ST 160
Project NameFOREST RIVER IX-1st FLR
Customer Number 
ePlanReviewYes
Description
(DEX - FOREST RIVER IX - STE 160) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To create a 4,190 square foot office tenant space on the 1st floor of a 48,900 square foot building by dividing a larger space. Work is to include upgrading 2 restrooms to be accessible to the disabled, interior nonbearing walls, new light switching, relocated mechanical, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/24/20129/25/2012 DONE
DetailsChristina Prado
completed 9-25-12
Second Notice 9/3/20129/19/2012 DONE
DetailsChristina Prado
mailed 9-20
First Notice 8/18/20128/24/2012 DONE
Permanent Occupancy  8/8/2012 DONE
DetailsChristina Prado
BLD-Final7/19/20127/20/20127/20/2012PPASS
DetailsDave Hannah
Doug Phone #: ###-####
FIRE-Final Inspection7/19/20127/20/20127/20/2012APASS
DetailsTroy Cobbley
Fire life safety passed. Exit sign has been repaired.
BLD-Final7/19/20127/19/20127/20/2012PNR
DetailsDave Hannah
doug Phone #: ###-#### needs fire finals
FIRE-Final Inspection7/19/20127/19/20127/19/2012PFAIL
DetailsTroy Cobbley
Repair the exit sign and set up the fire sprinkler permit for final inspection.
BLD-Framing/Rough-in7/2/20127/3/20127/3/2012APASS
DetailsDave Hannah
Lesley -go through door 160 Phone #: ###-####5
Issue PAID IN FULL permit  6/28/2012 DONE
DetailsChristina Prado
Print Occupancy Form  6/28/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  6/26/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK6/21/2012 6/21/2012 PASS
DetailsTim L. Woodard
Approved with accessibility upgrades. TLW
PLANS/APPL TAKEN TO FRONT DESK  6/21/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)6/11/2012 6/21/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/11/2012 6/13/2012 FAIL
DetailsTim L. Woodard
Refer to project dox markups. TLW
1st review completed  6/13/2012 DONE
DetailsTim L. Woodard
Routing - FIRE6/11/2012 6/12/2012 PASS
DetailsScott Arellano
No plan review report attached. A separate fire sprinkler permit will be required for the improvements planned.
Routing - Addressing6/11/2012 6/11/2012 PASS
DetailsTerry Records
Changed suite to 160 per applicant form conversation with Darla.
Intake Approval  6/7/2012 PASS
DetailsTim L. Woodard
Telephone call  6/6/2012 DONE
DetailsChristina Prado
Sent email to architect giving fees due
Intake Approval  6/4/2012 FAIL
DetailsTim L. Woodard
Doug,

Please address the items clouded on the markup to your submitted Checklist. Please call with any questions. TLW
Application received  5/31/2012 DONE
Application submitted via PDS Online on May 31 2012 9:31AM