Third Notice | | 11/19/2012 | 11/28/2012 | | DONE |
Christina Prado
|
|
|
complete 11-28-2012
|
Print Statement | | | 11/28/2012 | | DONE |
|
|
|
|
Second Notice | | 10/28/2012 | 11/14/2012 | | DONE |
Christina Prado
|
|
|
mailed 11-15
|
First Notice | 10/9/2012 | 10/9/2012 | 10/18/2012 | | DONE |
Jim Sly
|
|
|
faxed
|
BLD-Final | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Jim Sly
|
|
|
JP Phone #: ###-#### C/C issued.
|
DOC - Permit Finaled | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/8/2012 | 10/8/2012 | 10/9/2012 | P | CANC |
Jim Sly
|
|
|
JP Phone #: ###-#### Re-sched...
|
FIRE-Final Inspection | 10/5/2012 | 10/8/2012 | 10/8/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Inspector Jim Sly verified the installation of the insulation in the combustible concealed spaces. See previous inspection entrys.
|
Zoning Approval | 10/8/2012 | 10/8/2012 | 10/8/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | NR |
Jim Sly
|
|
|
JP Phone #: ###-#### Need Fire, Electr and Zoning. finals
|
BLD-Energy code compliance | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | PART |
Jim Sly
|
|
|
Jp Phone #: ###-#### Roof element 1 and 2 are filled with insulation.
|
BLD-Framing/Rough-in | 9/21/2012 | 9/21/2012 | 9/21/2012 | P | PART |
Jim Sly
|
|
|
JP ###-#### Roof element 1 and 3 framing ok and ready to fill with insulation. Element 2 (middle) filled with insulation and OK to cover.
|
BLD-Framing/Rough-in | 9/20/2012 | 9/21/2012 | 9/21/2012 | A | CANC |
Jim Sly
|
|
|
jp Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2012 | 8/20/2012 | 8/21/2012 | P | PASS |
Jim Sly
|
|
|
Fire wall - -JP Phone #: ###-#### 2 HR wall in front soffit area.....OK
|
FIRE-Final Inspection | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just for approval of the fire wall that was relocated so as not to interfere with the upright sprinkler protection inside of the exterior canopy. Wall location is ok with me as long as the building inspector is ok with it.
|
BLD-Conference | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | DONE |
Jim Sly
|
|
|
jp Phone #: ###-#### Verified location of 2hr wall in canopy OK so they can proceed.
|
FIRE-Conference | 8/15/2012 | 8/15/2012 | 8/15/2012 | P | DONE |
Troy Cobbley
|
|
|
I met with JP Burger/ESI about possible sprinkler protection in the parapats and at the new fire wall within the existing canopy. Approval from the architect is needed to move the fire wall and consultation with a fire sprinkler contractor is needed for the parapats.
|
BLD-Wall Bracing | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PART |
Jim Sly
|
|
|
JP Phone #: ###-#### Roof parapet ....Element 2 (center) Ok to cover.
|
Permit Ready to Issue | | | 7/11/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/11/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/6/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/5/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/6/2012 | | 6/21/2012 | | FAIL |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/21/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 6/6/2012 | | 6/6/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 6/6/2012 | | 6/6/2012 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Intake Approval | | | 6/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Telephone call | | | 6/5/2012 | | DONE |
Christina Prado
|
|
|
Sent email through projectdox giving intake fees due
|
Application received | | | 5/31/2012 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2012 4:42PM
|