Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01395
StatusFinaled
Name PEREZ MARTHA
Site Address 6821 W NORTHVIEW ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 214s.f. to an existing single family dwelling. the addition will be at the rear of the area of the dwelling that is part of a previous conversion of garage to living space. There is currently a room in the center of the dwelling that does not meet the natural light and ventilation requiremdnts and will e modified to meet the requirements for an adjoining room. Separate electrical and mechanical permits are required. R-1C ok per Bruce Eggleston. All per the approved plans as marked energy prescriptive component approach along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/25/20137/25/20137/25/2013PPASS
DetailsTom Arcoraci
pedro Phone #: ###-####
DOC - Permit Finaled7/25/20137/25/20137/25/2013PPASS
DetailsTom Arcoraci
BLD - Request for Extension5/2/20135/3/20135/3/2013APASS
DetailsTom Arcoraci
pedro Phone #: ###-####
BLD-Framing/Rough-in1/7/20131/8/20131/8/2013APASS
DetailsTom Arcoraci
Pedro Phone #: ###-####
BLD-Conference11/15/201211/15/201211/15/2012PDONE
DetailsPerry Paine
11-15-2012 4:30 p.m.
with 408...project not done per approved plans homeowners do not speak english and using the fack to not be able to understand oplanreview requirements. Cathy Collins was very helpful for the initial plan review and I am quite sure they understood requirements when they left with the approved permit on 6/5/2012...11-15-2012 pep
Routing Walk-In (BLD)11/15/201211/15/201211/15/2012PFAIL
DetailsPerry Paine
see conference with 408 this day
BLD-Framing/Rough-in11/2/201211/5/201211/5/2012ACANC
DetailsTom Arcoraci
Pedro Phone #: ###-####
Extend Permit 90/180 days11/5/201211/5/201211/5/2012APASS
DetailsTom Arcoraci
Pedro Phone #: ###-#### 180 days
BLD-Foundation6/22/20126/22/20126/22/2012APASS
DetailsDave Hannah
BLD-Footing6/21/20126/22/20126/22/2012APASS
DetailsDave Hannah
PEDRO Phone #: ###-####
Issue PAID IN FULL permit  6/5/2012 DONE
DetailsBarbara Stitt
Routing Walk-In (BLD)6/4/20126/4/20126/4/2012ADONE
DetailsPerry Paine
Plan assigned to (PEP)6/4/20126/4/20126/4/2012 PASS
DetailsPerry Paine
Case Summary (BLD)  6/4/2012  
Inspection Record Card- Bld  6/4/2012  
1st review completed  6/4/2012  
1st review completed  6/4/2012 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/4/2012 DONE
Permit Ready to Issue  6/4/2012 DONE
DetailsBarbara Stitt
Application received 6/1/20126/1/2012 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)6/1/20126/1/20126/1/2012APASS
DetailsBruce Eggleston