Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01425
StatusFinaled
Name RMH COMPANY
Site Address 1161 W RIVER ST Unit: 100
Project NameForest River IX - 1st Floor
Customer Number 
ePlanReviewYes
Description
(EVANS KEANE - FOREST RIVER IX - STE 100) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To create a 4,899 square foot office tenant space on the 1st floor of a 48,900 square foot building by dividing a larger space. Work is to: [construct interior non-bearing walls creating 12 individual offices, one conference room, a break room, and open office area], install new accessible service counter, installation of accessible doors / hardware, new plumbing, new lighting in limited area, new light switching, installation of new interior windows, and interior finishes. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/25/2012 DONE
DetailsTisha Gallop
BLD-Final10/23/201210/24/201210/24/2012PPASS
DetailsDave Hannah
Doug Phone #: ###-####
FIRE-Final Inspection10/23/201210/24/201210/24/2012APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Sprinkler Rough-in9/5/20129/5/20129/5/2012PPART
DetailsForrest France
Okay to cover overhead fire sprinkler work.
BLD-Framing/Rough-in8/10/20128/13/20128/13/2012APASS
DetailsDave Hannah
Doug Phone #: ###-####
Permit Ready to Issue  8/8/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  8/8/2012 DONE
DetailsChristina Prado
Print Occupancy Form  8/8/2012 DONE
DetailsChristina Prado
Routing - FIRE7/27/2012 8/2/2012 PASS
DetailsScott Arellano
PLANS/APPL TAKEN TO FRONT DESK  8/2/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)7/25/2012 8/2/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/25/2012 7/27/2012 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS7/27/2012 7/27/2012 PASS
DetailsBeverly Mountain
Issue PAID IN FULL permit  6/28/2012 DONE
DetailsChristina Prado
Inspection Record Card- Bld  6/28/2012 DONE
DetailsChristina Prado
CHANGE ISSUED DATE  6/28/2012  
Permit Ready to Issue  6/26/2012 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  6/21/2012 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)6/11/2012 6/21/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK6/11/2012 6/13/2012 PASS
DetailsTim L. Woodard
Cannot Issue until BLD12-01369 is issued. TLW
1st review completed  6/13/2012 DONE
DetailsTim L. Woodard
Routing - Addressing6/11/2012 6/11/2012 PASS
DetailsTerry Records
Intake Approval  6/8/2012 PASS
DetailsTim L. Woodard
Telephone call  6/6/2012 DONE
DetailsChristina Prado
Sent email to architect giving fees due
Application received  6/5/2012 DONE
Application submitted via PDS Online on Jun 5 2012 9:08AM