Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01431
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 100 E IDAHO ST
Project NameST LUKES-SOUTH TOWER-2ND FLR
Customer Number 
ePlanReviewYes
Description
(ST LUKES-SOUTH TOWER-2ND FLR)(CSC Neurology Exam Room) Permit is to remodel an existing 92 square foot exam room. Work to include: construction of non-combustible framing to infill existing door opening on the inside only and infill existing window, new lighting, installation of a new hand sink, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  9/26/2012 DONE
DetailsBarbara Stitt
DOC - L/C Approved  9/26/2012  
BLD-Final9/13/20129/14/20129/14/2012APASS
DetailsDave Hannah
daryl Phone #: ###-####
FIRE-Final Inspection9/12/20129/13/20129/13/2012APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in8/8/20128/9/20128/9/2012APASS
DetailsDave Hannah
daryl Phone #: ###-####
Permit Ready to Issue  6/26/2012 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  6/26/2012 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  6/26/2012 DONE
DetailsBarbara Stitt
Plan assigned to (TLW)6/12/2012 6/13/2012 PASS
DetailsTim L. Woodard
Routing - Addressing6/12/2012 6/13/2012 PASS
DetailsApril Wing
Need correct ste number. Waiting for call back from applicant.
1st review completed  6/13/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  6/13/2012 DONE
DetailsTim L. Woodard
Routing PW Sewer Rating6/12/2012 6/12/2012 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK6/12/2012 6/12/2012 PASS
DetailsTim L. Woodard
Routing - PUBLIC WORKS6/12/2012 6/12/2012 PASS
DetailsBeverly Mountain
Intake Approval  6/12/2012 PASS
DetailsTim L. Woodard
Telephone call  6/11/2012 DONE
DetailsTisha Gallop
e-mailed applicant to pay plan check fee
Application received  6/5/2012 DONE
Application submitted via PDS Online on Jun 5 2012 10:28AM