BLD-Final | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
DOC - Permit Finaled | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/30/2012 | 10/31/2012 | 11/1/2012 | P | NR |
Dave Hannah
|
|
|
Call for access code - Bryan Phone #: ###-#### everything is ok but for hill side final
|
Routing PW Grading-Hillside | 11/1/2012 | | 11/1/2012 | | PASS |
Jim Wyllie
|
|
|
Site grading and drainage is approved. Okay to sign Occupancy Permit. Jim Wyllie (###-####)
|
BLD-Energy code compliance | 9/14/2012 | 9/17/2012 | 9/17/2012 | A | PASS |
Dave Hannah
|
|
|
bryan Phone #: ###-####
|
BLD-Wall Bracing | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PART |
Dave Hannah
|
|
|
ok to cover ext still needs to add two hold downs
|
BLD-Framing/Rough-in | 9/12/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/11/2012 | 9/12/2012 | 9/12/2012 | P | CANC |
Dave Hannah
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2012 | 9/11/2012 | 9/11/2012 | P | FAIL |
Dave Hannah
|
|
|
brian Phone #: ###-#### 12 item correction notice on site do not insulate
|
BLD-Foundation | 7/17/2012 | 7/18/2012 | 7/18/2012 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####. All steel in place. Work in progress on stacking remaining form boards in front (south end). Also discussed bolt placement and holdwn placement with concrete contractor.
|
BLD-Footing | 7/11/2012 | 7/13/2012 | 7/13/2012 | P | PASS |
Tom Arcoraci
|
|
|
eric Phone #: ###-####
|
PubWorks Subgrade Approval | 7/12/2012 | 7/12/2012 | 7/12/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved
|
Issue PAID IN FULL permit | | | 7/10/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CDM) | | 6/5/2012 | 7/6/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/19/2012 | | 7/6/2012 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/6/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/6/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/6/2012 | | DONE |
Tisha Gallop
|
|
|
called Doug Lasher cell# and left vm permit is ready and fees.
|
Routing - PUBLIC WORKS GRADING | 7/5/2012 | | 7/5/2012 | | PASS |
Terry Records
|
|
|
|
Case Summary (BLD) | | | 6/26/2012 | | DONE |
|
|
|
|
1st review completed | | | 6/26/2012 | | FAIL |
|
|
|
Corrected wall bracing table is required. E-Mailed applicant 6-26-12 CDM
|
Routing - PLAN CHECK | | | 6/26/2012 | | FAIL |
Carl D Madsen
|
|
|
Corrected wall bracing table is required. E-Mailed applicant 6-26-12 CDM
|
Routing - FIRE | 6/14/2012 | | 6/19/2012 | | PASS |
Scott Arellano
|
|
|
Based on completion of Fire Station #15, no fire sprinklers required.
|
Routing - Erosion and Sediment | 6/13/2012 | | 6/14/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00557 plan approved with conditions attached the permit.
|
Routing - MECHANICAL | 6/12/2012 | | 6/13/2012 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 6/12/2012 | | 6/12/2012 | | FAIL |
Terry Records
|
|
|
Grading plan needs revisions. Left message with Brian Murdoch
|
Plan resubmittals received | | | 6/11/2012 | | |
|
|
|
Received 2 copies of sheet S101 and 3 copies of sheet C1- inserted into plans and given to Terry Records for review
|
Routing - MECHANICAL | 6/7/2012 | | 6/11/2012 | | CANC |
Troy James
|
|
|
Pended-took plans to Terry Records for review will give back after Terry reviews//BAS
|
Routing - PLANNING | 6/7/2012 | | 6/7/2012 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2012 | | 6/7/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Route to Impact Fee Review | 6/5/2012 | 6/8/2012 | 6/6/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Addressing | 6/5/2012 | | 6/6/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/6/2012 | | 6/6/2012 | | FAIL |
Terry Records
|
|
|
Foundation plan does not indicate wall and footing elevations or where steps in wall and footing occur. Grading plan needs revisions. talked to Bryan Murdoch 6/6/12 PM
|
Application received | | 6/5/2012 | 6/5/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/5/2012 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/5/2012 | | DONE |
Christina Prado
|
|
|
|