Print Statement | | | 11/13/2015 | | DONE |
|
|
|
|
Third Notice | | 10/17/2015 | 11/9/2015 | | DONE |
|
|
|
|
Second Notice | | 9/25/2015 | 10/12/2015 | | DONE |
|
|
|
Mailed 10-13-15 to Ward Schwider
|
First Notice | | 9/4/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/16/15 to Ward Schwider
|
BLD-Final | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
Zoning Approval | 8/25/2015 | 8/25/2015 | 8/25/2015 | | DONE |
Susan Riggs
|
|
|
Fencing along the east and south property line has been completed as required by the conditional use permit.
|
Print Occupancy Form | | | 8/25/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/25/2015 | | DONE |
|
|
|
called Greg to see if he could bring in the sign off card so i can get the signatures for ACHD off it and we'll get him the perm C of O
|
Permanent Occupancy | | | 8/25/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/25/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/24/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 8/24/2015 | | |
|
|
|
|
Telephone call | | | 8/18/2015 | | DONE |
|
|
|
called Greg to see if he was ready for a zoning insepction. He said they came out and he has to make the fence larger. He said he would finish that this weekend and call hi inspection Monday or Tues. Once the zoning passes he'll call in his building final
|
BLD-Final | 8/13/2015 | 8/13/2015 | 8/13/2015 | P | NR |
Jim Sly
|
|
|
Greg Phone #: ###-#### Need Zoning final and...........?
|
PubWorks Occupancy Approval | 8/13/2015 | 8/13/2015 | 8/13/2015 | | DONE |
Jason C. Taylor
|
|
|
project completed. JCT
|
PubWorks Occupancy Approval | 8/13/2015 | 8/13/2015 | 8/13/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Override - Parcel Holds | | | 8/13/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 8/13/2015 | | |
|
|
|
|
Telephone call | | | 8/5/2015 | | DONE |
|
|
|
called Greg to see if they're ready for his final. He said he'll be finished this weekend and should get his P.W. final then can call in his building final
|
FIRE-Final Inspection | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
Plan Reviewer's activity | | | 7/14/2015 | | DONE |
Jason Blais
|
|
|
Sent email to Greg Morris to work with inspectors and complete this permit. TCO has been granted for 2 years and is time to obtain a permanent CO.
|
Telephone call | | | 7/9/2015 | | DONE |
|
|
|
called Greg again about temp c of o-he will email Jason Blais-he said he's almost done and will probably be calling for the fire life safety at the end of the week
|
BLD-Conference | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | DONE |
Jim Sly
|
|
|
would like call ahead; Greg Phone #: ###-####
|
Override - Parcel Holds | 6/24/2015 | 1/1/1900 | 6/24/2015 | | |
|
|
|
Conference ONLY
|
BLD-Footing | 5/28/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Jim Sly
|
|
|
###-####-Greg Ramp
|
Override - Parcel Holds | | | 5/28/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 5/28/2015 | | |
|
|
|
|
BLD-Foundation | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | NR |
Jim Sly
|
|
|
Greg// please call before Phone #: ###-####
|
BLD-Foundation | 5/14/2015 | 5/15/2015 | 5/15/2015 | A | CANC |
Jim Storey
|
|
|
Greg// for patio Phone #: ###-####
|
Telephone call | | | 5/4/2015 | | DONE |
|
|
|
called Greg to remind him his temp c of o-he said he emailed Jason B. on friday last week
|
BLD-Conference | 4/27/2015 | 4/28/2015 | 4/28/2015 | A | DONE |
Jim Sly
|
|
|
Greg Phone #: ###-####// please call 30 min prior
|
BLD-Conference | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 4/27/2015 | 4/27/2015 | 4/27/2015 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/27/2015 | | DONE |
|
|
|
Jim Sly said he expired it by mistake
|
BLD-Aging Inspection | 4/6/2015 | 4/6/2015 | 4/7/2015 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 2/9/2015 | 5/11/2015 | 2/9/2015 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-extension granted - 90 days from 2-14-15
|
Override - Parcel Holds | | | 2/9/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 2/9/2015 | | |
|
|
|
|
BLD-Energy code compliance | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
Override - Parcel Holds | 2/4/2015 | 1/1/1900 | 2/4/2015 | | |
|
|
|
calling in energy not final
|
BLD-Framing/Rough-in | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PASS |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
Telephone call | | | 1/26/2015 | | DONE |
Candy A. Nichols
|
|
|
called Greg to see if they were ready for the final inspection so they could get the perm c of o. Transfered him to Meagan to schedule an apointment with Jason Blais
|
BLD-Conference | 1/16/2015 | 1/20/2015 | 1/20/2015 | A | DONE |
Jim Sly
|
|
|
Greg Phone #: ###-#### Talked to Greg on phone. After looking at the case, I advised Greg to make an appt. to talk to Jason Blais about progress on project.
|
Temporary Occupancy | 11/20/2014 | 2/18/2015 | 11/20/2014 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B. ok for a 90 day extension, see attached request
|
Telephone call | | | 11/20/2014 | | DONE |
Candy A. Nichols
|
|
|
called Greg to let know this was his last extension. Left message on his phone ###-####
|
Telephone call | | | 11/20/2014 | | DONE |
Candy A. Nichols
|
|
|
called Greg asking about temp CO. He's going to come in and talk to Jason Blais about an extension
|
Override - Parcel Holds | | | 11/20/2014 | | |
|
|
|
|
Override - Parcel Holds | | | 11/20/2014 | | |
|
|
|
|
Change Expiration Date Only | | | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
per attached approval from JCB 90 day extension from 8-16-14
|
BLD-Final | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | NR |
Jim Sly
|
|
|
Dan Lancaster Phone #: ###-#### All framing OK except interior (North) shear wall nailing.
|
BLD-Conference | 8/28/2014 | 8/29/2014 | 8/29/2014 | A | DONE |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Conference | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | DONE |
Jim Sly
|
|
|
Greg Phone #: ###-####
|
BLD-Conference | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | CANC |
Mike Jordan
|
|
|
greg Phone #: ###-####
|
Change Expiration Date Only | | | 8/8/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Wall Bracing | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PART |
Jim Sly
|
|
|
Corby Phone #: ###-#### all Exterior nailing.....OK.
|
BLD-Other | 7/11/2014 | 7/11/2014 | 7/11/2014 | P | NH |
Jim Sly
|
|
|
concrete footing in basement - Dan Phone #: ###-####
|
BLD-Conference | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 6/6/2014 | 6/6/2014 | 6/11/2014 | | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 5/16/2014 | 8/14/2014 | 5/16/2014 | | DONE |
Barbara Stitt
|
|
|
Temp occupancy approved for 90 days-see scanned documents
|
BLD-Conference | 3/28/2014 | 3/31/2014 | 3/31/2014 | P | DONE |
Jim Sly
|
|
|
greg Phone #: ###-####
|
BLD-Conference | 3/27/2014 | 3/28/2014 | 3/28/2014 | P | CANC |
Tom Arcoraci
|
|
|
greg Phone #: ###-####
|
Change Expiration Date Only | | | 3/13/2014 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/10/2014 | | DONE |
Barbara Stitt
|
|
|
Called Greg to check the status of the project & inform him of what needs to be done to extend his occupancy//3-10-14 @ 1:30pm
|
BLD-Conference | 3/3/2014 | 3/3/2014 | 3/3/2014 | A | DONE |
Jim Sly
|
|
|
Called owner......Slow.....Work in progress. Ready to frame when weather breaks. Temp on existing, until addition is completed.
|
BLD-Conference | 9/23/2013 | 9/24/2013 | 9/24/2013 | A | DONE |
Jim Sly
|
|
|
greg Phone #: ###-####
|
BLD-Footing | 9/16/2013 | 9/17/2013 | 9/17/2013 | A | PASS |
Jim Sly
|
|
|
Hyrum Phone #: ###-####
|
Case Summary (BLD) | | | 9/16/2013 | | DONE |
|
|
|
|
BLD-Conference | 8/29/2013 | 8/29/2013 | 8/29/2013 | A | CANC |
Jim Sly
|
|
|
|
Temporary Occupancy | 5/23/2013 | 8/21/2013 | 5/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 5/20/2013 | 5/21/2013 | 5/21/2013 | A | PEND |
Jim Sly
|
|
|
Tammy or ###-####-Please call at least 30 mins prior Phone #: ###-#### Inspection of Structural and life safety items in Existing Daycare appear to be OK. See Fire inspection notes from Troy.
|
FIRE-Final Inspection | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PART |
Troy Cobbley
|
|
|
Temporary occupancy (life safety) approved by building official per approval of plan modifications. The applicant has requested a TCO due to the addition not being completed. The estimated completeion date of the addition is within 360 days or sooner per the applicant.
|
OVERRIDE | | | 5/17/2013 | | |
|
|
|
|
OVERRIDE | | | 5/17/2013 | | |
|
|
|
|
Plan assigned to (SRZ) | 5/15/2013 | 5/15/2013 | 5/17/2013 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/15/2013 | | 5/17/2013 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 5/17/2013 | | DONE |
Sam Zahorka
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 5/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan Reviewer's activity | | | 5/17/2013 | | DONE |
Sam Zahorka
|
|
|
Temporary occupancy approved by building official per approval of plan modifications. The applicant has requested a TCO due to the addition not being completed. The estimated completeion date of the addition is within 360 days or sooner per the applicant. The maximum occupant load for the children is 72 until the additoin is completed. Two exits are required from classroom #4 and classroom #5. Exits signs and emergency egress illumination is required in both classrooms. The required second exit for the classrooms is through the existing dining room.
|
Telephone call | | | 5/17/2013 | | DONE |
Christina Prado
|
|
|
called Ward to advise plan mod is ready for pick up
|
Plan Modification Accepted | | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
***PLAN MOD*** Received two sets of plans sheets marked A2.0 reflecting the correct layout of addition
|
FIRE-Conference | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | DONE |
Troy Cobbley
|
|
|
Tammy was unsure of the permiting and inspection process so I went over it with her. I also performed a life safety inspection for her. I found that the actual floor plan does not match the city approved plans between the Dining area and the Classroom. Also several exit signs have not been installed. She also wants to request a temporary occupancy since the Gym and the restrooms have not been constructed yet. This Gym/restrooms will need the new alarm system extended into it when built. I deferred her to Scott for this request.
|
Issue PAID IN FULL permit | | | 11/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/26/2012 | | DONE |
Christina Prado
|
|
|
Spoke with Ward regarding the upcoming expiration of this permit, he will contact GC to have pick up by weeks end. Will follow up again 11/30/12
|
Meeting | | | 11/16/2012 | | DONE |
Tisha Gallop
|
|
|
someone in office dropped off ACHD receipt. Told him still need GC/rce/form, RP and fees due.
|
Expiration Notice | 11/13/2012 | 12/5/2012 | 11/13/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/24/2012 | | 9/5/2012 | | PASS |
Sam Zahorka
|
|
|
Passed per Dan Stuarts corrections being completed by the Architect. Plans are red-lined.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 9/5/2012 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2012 | | DONE |
|
|
|
spoke with ward - permit ready fees given , need ACHD, GC, RP
|
Permit Ready to Issue | | | 9/5/2012 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 6/6/2012 | | 9/5/2012 | | PASS |
Dan Stuart
|
|
|
Little Tigers Daycare
|
Routing - PUBLIC WORKS | 8/23/2012 | | 8/24/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 8/23/2012 | | 8/24/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 8/20/2012 | | 8/23/2012 | | PASS |
Jason Blais
|
|
|
Called Action Courier for pick up on 8-20-12 @ 1:35pm//BAS
Received email response the structural review has passed.
|
Plan resubmittals received | | | 8/23/2012 | | DONE |
Tisha Gallop
|
|
|
received one copy of Drainage Narrative and O & M, letter addressed to Brian Murphy regarding use of buildings, five copies of plan sheet A1.0; inserted by plan tech and routed to PW.
|
Routing - PUBLIC WORKS | 8/16/2012 | | 8/21/2012 | | FAIL |
Connie Baumgartner
|
|
|
FAILED BY TERRY RECORDS FOR DRAINAGE ISSUES.
|
Routing PW Drainage | 8/16/2012 | | 8/20/2012 | | FAIL |
Brian Murphy
|
|
|
depth of bioretention areas conficts
|
Plan resubmittals received | | | 8/17/2012 | | |
|
|
|
Received 3 copies of sheets A2.0, A3.0, A4.0, A4.1, A5.0, 2 copies of review response letter dated 8-2-12 from Ward Schwide with ICC-ES evaluation Report attached, 2 copies of response letter from Kevin Murar dated 8-13-12, 2 copies of structural calcs and taken to Dan
|
Routing - PLAN CHECK | 8/10/2012 | | 8/16/2012 | | |
Dan Stuart
|
|
|
|
Routing - PLANNING | 8/8/2012 | | 8/10/2012 | | PASS |
Sue Cummings
|
|
|
Changes made to Sheet A1.0, Site Plan - Need dated and initialed. Elevation plan sheet A3.0 needs initialed and dated. done 8/10/12 sac
|
Routing Off Site - STRUCTURAL | 7/30/2012 | | 8/7/2012 | | FAIL |
Dan Stuart
|
|
|
Copy of second structural plan review report e-mailed to Ward Schwider and Little Tiger Daycare owners. Resubmittals are required. Copy of review attached to building permit.
|
Plan Reviewer's activity | | | 8/2/2012 | | DONE |
|
|
|
Responded to Ward Schwider concerning code compliance for existing daycare area due to proposed changes to existing and the addition to increase building area and occupant load which removes the original grandfather rights based on original Ada County approvals with a occupant load of 39 children in the existing area. I have attached a copy of my response to the building permit.
|
Routing PW Drainage | 8/2/2012 | | 8/2/2012 | | FAIL |
Terry Records
|
|
|
No O & M plan
|
Plan resubmittals requested | | | 7/31/2012 | | DONE |
|
|
|
2nd review. Resubmittals required. Copy of plan review report e-mailed to architect and daycare owner.
|
Routing - PLAN CHECK | 7/23/2012 | | 7/31/2012 | | FAIL |
Dan Stuart
|
|
|
2nd review. Resubmittals required. routing plans back to PW and Planning.
|
Telephone call | | | 7/30/2012 | | DONE |
Tisha Gallop
|
|
|
called Action couriers for pick up
|
Plan resubmittals received | | | 7/25/2012 | | DONE |
Tisha Gallop
|
|
|
received response comments, two copies of structural calcs and three copies of plan sheets A1.0, A2.0, A3.0, A4.0, A4.1, A5.0; inserted by permit tech. and taken back to Dan Stuart.
|
1st review completed | | | 7/23/2012 | | FAIL |
|
|
|
Failed Public Works, Structural
|
Routing - FIRE | 7/18/2012 | | 7/23/2012 | | PASS |
Scott Arellano
|
|
|
Attached Plan Review report to plans.
|
Routing - PLAN CHECK | 6/15/2012 | | 7/18/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Plans routing to fire code analyst for review.
|
Plan resubmittals requested | | | 7/18/2012 | | DONE |
|
|
|
Copy of review comments e-mailed to architect and applicant.
|
Routing Off Site - STRUCTURAL | 6/6/2012 | | 6/21/2012 | | FAIL |
Jason Blais
|
|
|
Called action courier for pick up 6-6-12 @ 2:30pm//BAS
6/21/12 Forwarded Structural Review to architect. Response and resubmittal documents required.
|
Routing - PLUMBING | | | 6/15/2012 | | PASS |
Daryl Spivey
|
|
|
per plans and 2003 upc
|
Routing - PLANNING | 6/15/2012 | | 6/15/2012 | | PASS |
Sue Cummings
|
|
|
CUP12-00013- Sue Cummings
|
Routing PW Drainage | 6/11/2012 | | 6/14/2012 | | FAIL |
Brian Murphy
|
|
|
need revisions s.w. and o+ m plan
|
Routing PW Solid Waste | | | 6/14/2012 | | PASS |
Peter J. McCullough
|
|
|
Carts only.
|
Routing - PUBLIC WORKS | 6/8/2012 | | 6/14/2012 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 6/14/2012 | | 6/14/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00560 plan meets the minimum requirments. Plan approved with additional conditions attached to the permit.
|
Routing PW Sewer Rating | 6/8/2012 | | 6/11/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 6/7/2012 | | 6/8/2012 | | PASS |
Todd Tucker
|
|
|
Todd Tucker
|
Application received | | 6/6/2012 | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Pending Assignment by JCM | 6/6/2012 | | 6/6/2012 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/6/2012 | | PASS |
Dan Stuart
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 5/22/2012 | | FAIL |
Dan Stuart
|
|
|
|