Second Notice | | 11/24/2012 | 12/4/2012 | | DONE |
|
|
|
|
First Notice | | 10/18/2012 | 11/14/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/2/2012 | 10/3/2012 | 10/3/2012 | P | PASS |
Dave Hannah
|
|
|
eric Phone #: ###-####
|
FIRE-Final Inspection | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Forrest France
|
|
|
Noted corrections verified. Fire life safety final approved.
|
BLD-Final | 9/24/2012 | 9/25/2012 | 9/26/2012 | P | NR |
Dave Hannah
|
|
|
Eric Phone #: ###-#### needs to have fire final first
|
FIRE-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 | A | FAIL |
Troy Cobbley
|
|
|
Final the project related fire sprinkler permit (remove tape from heads), remove thumbturn dead bolts from both exit doors (keyed ok on main exit), lever hardware at main exit does not override internal lock and the exit sign was non functional.
|
BLD-Framing/Rough-in | 8/30/2012 | 8/31/2012 | 8/31/2012 | P | PART |
Tony Young
|
|
|
Eric Phone #: ###-####,, fireblock top of chase,, seal wires
|
FIRE-Conference | 8/10/2012 | 8/10/2012 | 8/10/2012 | P | DONE |
Forrest France
|
|
|
Re project related fire sprinkler.
|
Issue PAID IN FULL permit | | | 7/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 7/26/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 7/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/26/2012 | | DONE |
Tisha Gallop
|
|
|
called Marvin Riggs and left vm plan mod is ready and fees.
|
Plan assigned to (TLW) | 7/25/2012 | | 7/25/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/25/2012 | | 7/25/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/25/2012 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/24/2012 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld12-01498 (Midas Gold) to construct 3 new offices to finish them to match; submitted on plan sheets a0.01, a2.01, a2.11, and revised cert of value; routed to Tim Woodard.
|
BLD-Framing/Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Dave Hannah
|
|
|
Marvin Phone #: ###-####
|
CHANGE ISSUED DATE | | | 7/9/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/9/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 7/9/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 7/9/2012 | | DONE |
Christina Prado
|
|
|
Called and gave Marvin fees due
|
Issue PAID IN FULL permit | | | 7/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 6/8/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/5/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with letter from owner that the work will be completed on BLD08-00379 by August 15th, 2012. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 6/29/2012 | | DONE |
Tisha Gallop
|
|
|
received faxed letter from Marvin Riggs (The Professionals); taken to Jason Blais since Tim out of office until end of next week.
|
Routing - PLAN CHECK | 6/8/2012 | | 6/19/2012 | | FAIL |
Tim L. Woodard
|
|
|
Provide accessibility upgrade. Tim Woodard
|
1st review completed | | | 6/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/8/2012 | 6/8/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/8/2012 | | PASS |
Tim L. Woodard
|
|
|
|