Letter of compliance/Occupancy | | | 3/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
DOC - L/C Approved | | | 3/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PASS |
Tom Arcoraci
|
|
|
daryl Phone #: ###-####
|
FIRE-Final Inspection | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | PASS |
Forrest France
|
|
|
Verified correction items. Fire life safety passed.
|
FIRE-Final Inspection | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | FAIL |
Forrest France
|
|
|
Missing two exit signs, one EM light per plan sheet E3.0. Need to provide revised floorplan due to field changes.
|
BLD-Framing/Rough-in | 1/7/2014 | 1/7/2014 | 1/9/2014 | P | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/11/2013 | 12/11/2013 | 12/12/2013 | P | PASS |
Dave Hannah
|
|
|
daryl - needs to be done before 3 pm Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2013 | 11/14/2013 | 11/15/2013 | P | PART |
Dave Hannah
|
|
|
Before 3 if possible - Daryl Phone #: ###-#### ok to cover phase one
|
BLD-Ceiling Grid Inspection | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2013 | 10/23/2013 | 10/24/2013 | P | PASS |
Dave Hannah
|
|
|
partial - Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | CANC |
Dave Hannah
|
|
|
partial - Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl-Ceiling grid inspection please-Please call prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PART |
Dave Hannah
|
|
|
DARYL Phone #: ###-#### ok to cover phase one
|
CHANGE STATUS TO (ISS) | | | 7/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue & PRINT to be Invoiced | | | 7/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
1st review completed | | | 6/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 6/15/2012 | | 6/25/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/15/2012 | | 6/25/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 6/15/2012 | | 6/19/2012 | | PASS |
Scott Arellano
|
|
|
Sepate Fire Alarm and Fire Sprinkler permits will be required. No plan review comments attached to plans.
|
Routing PW Sewer Rating | 6/15/2012 | | 6/18/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 6/15/2012 | | 6/18/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 6/15/2012 | | 6/15/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 6/15/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | | 6/13/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2012 8:45AM
|