Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01611
StatusFinaled
Name HORIZON RETAIL CONSTRUCTION INC
Site Address 8170 W OVERLAND RD
Project NameThe Cash Store
Customer Number 
ePlanReviewYes
Description
(THE CASH STORE)(VENTURE DEVELOPMENT BLDG) Remodel of existing 1,000 square foot office space. This is an existing tenant approved under BLD03-02931. Work to include some new interior walls and doors, new service counter, interior finish, and some electrical work. Restroom is existing from "vanilla finish" permit. Nonseparated uses per IBC Section 302.3.2. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/24/201211/30/2012 DONE
DetailsChristina Prado
complete 11-30-12
First Notice10/23/201210/23/201211/14/2012 DONE
DetailsMike Jordan
mailed 11-15
BLD-Final10/22/201210/23/201210/23/2012APASS
DetailsMike Jordan
rick - opens after 10am Phone #: ###-####
DOC - Permit Finaled10/23/201210/23/201210/23/2012PPASS
DetailsMike Jordan
Restroom sign has been installed.
BLD-Final10/19/201210/22/201210/22/2012AFAIL
DetailsMike Jordan
rick - store opens at 10 Phone #: ###-####. Needs to provide the restroom directional sign.
FIRE-Final Inspection10/18/201210/19/201210/19/2012APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection10/8/201210/9/201210/9/2012AFAIL
DetailsTroy Cobbley
Provide city approved plans and notes for inspection. I went ahead and did a walk through and noted overspaced sprinkler pendants and that the fire extinguisher needs to be mounted.
BLD-Final10/5/201210/8/201210/8/2012PNR
DetailsTom Arcoraci
rick Phone #: ###-####
Issue PAID IN FULL permit  8/7/2012 DONE
OVERRIDE  7/27/2012  
Plan resubmittals received  7/27/2012 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK7/27/2012 7/27/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/27/2012 DONE
DetailsTim L. Woodard
Telephone call  7/27/2012 DONE
Spoke with GC, value staying the same - gave permit fee amount
Override - Parcel Holds  7/27/2012  
Permit Ready to Issue  7/27/2012 DONE
Plan assigned to (TLW)6/25/2012 7/27/2012 PASS
DetailsTim L. Woodard
Routing - FIRE7/7/2012 7/9/2012 PASS
DetailsTim Frost
Telephone call  7/9/2012 DONE
DetailsSam Zahorka
Emailed ePlan Review building plan review corrections to Kris. Spoke with Fire review.
1st review completed  7/9/2012 FAIL
DetailsJason Blais
Failed building review.
Routing - PLAN CHECK6/25/2012 7/6/2012 FAIL
DetailsTim L. Woodard
Provide public restrooms. Refer to change mark in e-plan review.
Payment Received  6/25/2012 DONE
Payment received via Govolutions
Intake Approval  6/25/2012 PASS
DetailsTim L. Woodard
Telephone call  6/25/2012 DONE
DetailsChristina Prado
sent email to architect giving plan check fees
Application received  6/19/2012 DONE
Application submitted via PDS Online on Jun 19 2012 9:34AM