Permanent Occupancy | | | 12/24/2015 | | DONE |
|
|
|
|
BLD-Final | 9/26/2012 | 9/26/2012 | 9/27/2012 | P | PASS |
Dave Hannah
|
|
|
sam Phone #: ###-####
|
FIRE-Final Inspection | 9/25/2012 | 9/25/2012 | 9/25/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Dave Hannah
|
|
|
duane Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/15/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/15/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/14/2012 | | DONE |
|
|
|
Spoke with Martin - permit ready fees given, hes said owner will be GC
|
Plan assigned to (TLW) | 8/8/2012 | | 8/13/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/13/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Plan Modification Accepted | | | 8/8/2012 | | |
|
|
|
Plan modification accepted for BLD12-01653-Minor modification of two walls(not relocating the addition of a reception desk and circular work station and a flooring change in one room. Sheets affected are A0.1,A0.2,A0.3,A1.1,A1.2,A2.1 & A3.1.
|
Print Occupancy Form | | | 7/6/2012 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2012 | | DONE |
Christina Prado
|
|
|
Called and left message for Martin giving fees due and advising GC is required prior to issuance
|
Permit Ready to Issue | | | 7/6/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 6/22/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/22/2012 | | 7/5/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
1st review completed | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/5/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/22/2012 | 6/22/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/22/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/22/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 1/3/2016 | | | |
|
|
|
|