Permanent Occupancy | | | 12/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | A | PASS |
Mike Jordan
|
|
|
joe Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 12/6/2012 | 12/10/2012 | 12/11/2012 | P | PASS |
Forrest France
|
|
|
Previous correction items verified for completion. Fire life safety passed.
|
FIRE-Conference | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | DONE |
Troy Cobbley
|
|
|
I went over the out standing correction items with the general contractor. I let him know that per the plan review comments exit signs and emergency lights are not required but if installed them must function. So he has the option of repairing them or removing them.
|
BLD-Final | 7/11/2012 | 7/13/2012 | 7/13/2012 | A | NR |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | FAIL |
Troy Cobbley
|
|
|
Remove the manual flush bolts from in-active leaf of the main exit. See IFC 1008.1.9.4. Provide testing of the exit signs/emergency lights. Relocate or remove the exit sign at infilled door. Upright sprinkler heads exceed 130sq. ft. spacing at restrooms in warehouse. Provide and mount tagged fire extinguisher in normal path of travel as discussed.
|
Issue PAID IN FULL permit | | | 7/11/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/25/2012 | | 7/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/25/2012 | | 7/6/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/6/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Permit Ready to Issue | | | 7/6/2012 | | |
|
|
|
|
Print Occupancy Form | | | 7/6/2012 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2012 | | |
|
|
|
7-6-12 called Devin- left message permit ready for pick up ///dld
|
Plans ACCEPTED BY PLAN TECH | | | 6/25/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/25/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 12/22/2012 | | | |
|
|
|
|
Application received | | 6/25/2012 | | | |
|
|
|
|