Permit Information
Permit NumberBLD12-01681
StatusFinaled
Name VERTICAL CORP
Site Address 807 W IDAHO ST
Project NameALAVITA
Customer Number 
ePlanReviewYes
Description
(ALAVITA - 1ST STORY) Fire sprinkler system substitutes for 1-hr fire-resistance-rated construction. To create a 1,626 square foot restaurant tenant space on the 1st story of an existing historic building and a 606 square foot support kitchen in the basement. Work is to include a restroom accessible to the disabled, interior nonbearing walls, vertical sliding windows, a grease hood and grease duct, kitchen equipment, a walk-in cooler, dining booths, a bar, and finishes. The grease duct is required to have a listed 2-hr duct wrap assembly installed from the grease hood all the way to the exhaust fan on the roof. Support for the grease duct is required to comply with the approved ICC Evaluation Report. The rating of the duct wrap is required to be maintained at the support locations. At exterior locations, the grease duct assembly is required to be protected from the weather by a weather tight galvanized metal enclosure. Structural work includes new steel headers and jambs at new openings in a masonry wall and new steel beams to support a new roof top exhaust fan. Special inspection is required for welding. The amended Reciprocal Easement Agreement with covenants, conditions, and restrictions to allow fan coil unit condensers, a grease duct, a make-up air unit, a walk-in cooler condenser, and perhaps a grease trap to serve the 807 W. Idaho St. restaurant to be located on the Eighth and Main property is required to be finalized prior to granting a Certificate of Occupancy. The duct penetrations of the South exterior wall at the property line were approved as a code alternate by the Building Official and by the Fire Marshal. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The structural design and attachment of the new canopy is a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/9/20136/11/2013 DONE
Third Notice 4/28/20136/4/2013 DONE
faxed
Second Notice 4/1/20134/23/2013 DONE
First Notice 2/21/20133/22/2013 DONE
Faxed 3-22-13
Permanent Occupancy UNPAID FEE  2/11/2013 DONE
Zoning Approval2/8/20132/8/20132/8/2013 DONE
DetailsJosh Wilson
BLD-Final2/5/20132/6/20132/7/2013APASS
DetailsDave Hannah
kent Phone #: ###-####
Meeting  1/31/2013 DONE
DetailsChristina Prado
Changed name from 807 Idaho Restuarant to Alavita per tenants. When plans were originally aubmitted name was unknown.
BLD-Final1/3/20131/4/20131/4/2013ANR
DetailsDave Hannah
kent Phone #: ###-####
BLD-Final12/19/201212/20/201212/26/2012PPART
DetailsDave Hannah
Kent Phone #: ###-#### ok for temp occ needs to finish restrooms
FIRE-Final Inspection12/19/201212/20/201212/21/2012APASS
DetailsForrest France
Fire life safety inspection completed.
FIRE-Alarm Testing12/17/201212/17/201212/17/2012PPART
DetailsForrest France
Project related fire alarm and hood suppression system testing completed.
Plan Reviewer's activity  12/11/2012 DONE
DetailsJason Blais
Received amended reciprocal easement agreement between 8th & Main and 805 Idaho. Document is attached to this case.
BLD-Conference12/10/201212/10/201212/10/2012PDONE
DetailsDave Hannah
KENT Phone #: ###-####
FIRE-Sprinkler Rough-in11/19/201211/19/201211/19/2012APART
DetailsForrest France
Ref. stamped fire sprinkler plans for overhead work approved to date.
BLD-Conference11/14/201211/15/201211/15/2012ADONE
DetailsMike Jordan
Kent Phone #: ###-####. Spoke with Kent, wanted to encroach on 21 inch isle width between bar and botths to provide additional overhang for bar and to elinate the 38 inch width for entering and exiting bar. Noted to kent that he would most likely not be able to accomplish this and maintain ada requirements. Needs to go to plan review for approval to change approved plans.
BLD-Framing/Rough-in10/24/201210/25/201210/25/2012APASS
DetailsDave Hannah
Kent Phone #: ###-#### ok to cover wall
BLD-Framing/Rough-in10/18/201210/19/201210/22/2012APASS
DetailsDave Hannah
kent Phone #: ###-####
Permit Ready to Issue  10/8/2012 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  10/8/2012 DONE
DetailsTisha Gallop
Print Occupancy Form  10/8/2012 DONE
DetailsTisha Gallop
Plan assigned to (CJW)8/17/20128/17/201210/4/2012 PASS
DetailsCarl Westfall
807 IDAHO RESTAURANT (20 days - Sept 13) ePlanReview
Routing - PLAN CHECK10/1/2012 10/4/2012 DONE
DetailsCarl Westfall
Routing completed. Drawings approved.
Routing - PLUMBING10/4/2012 10/4/2012 PASS
DetailsDaryl Spivey
Per revised plans and 2003 UPC.
PLANS/APPL TAKEN TO FRONT DESK  10/4/2012 DONE
Routing - PLUMBING9/28/2012 10/3/2012 FAIL
DetailsDaryl Spivey
Dishwasher and clean sink shall not be drained to grease trap.
Routing - PLAN CHECK9/26/2012 10/1/2012 PASS
DetailsCarl Westfall
Drawings approved with "red lines" after the 2nd plan review.
Routing PW Environmental9/28/2012 10/1/2012 PASS
DetailsWalt Baumgartner
Two Canplas Endura low profile 25 gpm grease traps on bottom kithchen area w/ upper floor sinks routed down. GPM rating for traps to conform w/ Plumbing code requirements for discharge rate of attached fixtures.
Routing Off Site - C.D.H9/28/2012 10/1/2012 PASS
Details
Approved by Lori Badigian.
Routing PW Sewer Rating9/28/2012 10/1/2012 PASS
Details
Plan resubmittals received  9/26/2012  
1st review completed  9/21/2012 FAIL
Failed PW Environmental, Plumbing, and IBC Plan Review.
Routing - PLAN CHECK8/17/2012 9/21/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on Sept 20 and finished the next day. Revisions to the drawings were required. See the plan review report.
Routing Off Site - C.D.H8/17/2012 8/23/2012 PASS
Details
Routing - Addressing8/17/2012 8/22/2012 PASS
DetailsApril Wing
Routing - FIRE8/17/2012 8/21/2012 PASS
DetailsScott Arellano
Attached review comments to plans.
Routing PW Sewer Rating8/17/2012 8/20/2012 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste8/17/2012 8/20/2012 PASS
DetailsPeter J. McCullough
Routing PW Environmental8/17/2012 8/20/2012 FAIL
DetailsWalt Baumgartner
Resubmit plumbing plans. Show grease abatement for pre-rinse sink and triple sink ground level, and for triple sink & double sink in basement prep area. Canplas Endura passive trap or equivalent ok. Info sent to mechanical engineer - Otto w/ Tikker Eng. As of 9/5/12 he is waiting on architect before submitting redrawn plan sheets.
Routing - PLUMBING8/17/2012 8/20/2012 FAIL
DetailsBill VanDegrift
Per Public Works install grease intercepter and grease lines.
May require additional backflow protection.
Payment Received  8/17/2012 DONE
Payment received via Govolutions
Pending Assignment by JCB8/17/2012 8/17/2012 DONE
DetailsJason Blais
Intake Approval  8/17/2012 PASS
DetailsCarl Westfall
1) Justification for creating new duct openings in a property line wall and documentation (e.g. code alternate signed by the Building Official) will be provided later.
2) A copy of the agreement that allows mechanical equipment that serves this building to be located on the adjacent property will be provided later.
Telephone call  8/17/2012 DONE
DetailsChristina Prado
Sent email to architect giving fees due
Plan Reviewer's activity  8/17/2012 DONE
DetailsJason Blais
Emailed architect rep to contact ACHD for evaluation of any impact fees due. Our Permit Counter will need written verification from ACHD prior to the building permit being issued.
Routing - Design Review8/17/2012 8/17/2012 PASS
DetailsJosh Wilson
Josh Wilson - DRH12-00132
Routing - PUBLIC WORKS8/17/2012 8/17/2012 PASS
DetailsBeverly Mountain
Intake Approval  7/24/2012 FAIL
The 1st plan intake was not approved. The following is needed before a plan intake can be done.
1) Provide completed Form #520 Major Tenant Improvement Submittal Checklist.
2) Provide the Food Establishment Plan Review and Approval form for the CDHD.
3) Provide justification for creating new duct openings in a property line wall and documentation (e.g. code alternate signed by the Building Official) that approves this. If this is not available, put the make-up air unit on the roof, provide justification for the added dead load, and put the make-up air duct in a 2-hr shaft all the way from the wall penetration at the bottom to the roof at the top.
4) Revise the drawings to show the grease duct within a 2-hr fire-resistance-rated shaft from the top of the grease hoods, through the exterior wall, to the termination of the grease duct at the roof. Show that the shaft will not obstruct the exterior stairway enclosure door or show the door filled in with a 2-hr exterior wall. Show proper clearance from combustible and noncombustible materials. Show cleanout openings.
5) If the make-up air duct penetration is allowed, provide a copy of the agreement that allows mechanical equipment that serves this building to be located on the adjacent property.
6) Provide the rest of Form #310 Statement of Special Inspections with all activities requiring special inspection listed.
Application received  6/26/2012 DONE
Application submitted via PDS Online on Jun 26 2012 9:34AM