Third Notice | | 6/9/2013 | 6/11/2013 | | DONE |
|
|
|
|
Third Notice | | 4/28/2013 | 6/4/2013 | | DONE |
|
|
|
faxed
|
Second Notice | | 4/1/2013 | 4/23/2013 | | DONE |
|
|
|
|
First Notice | | 2/21/2013 | 3/22/2013 | | DONE |
|
|
|
Faxed 3-22-13
|
Permanent Occupancy UNPAID FEE | | | 2/11/2013 | | DONE |
|
|
|
|
Zoning Approval | 2/8/2013 | 2/8/2013 | 2/8/2013 | | DONE |
Josh Wilson
|
|
|
|
BLD-Final | 2/5/2013 | 2/6/2013 | 2/7/2013 | A | PASS |
Dave Hannah
|
|
|
kent Phone #: ###-####
|
Meeting | | | 1/31/2013 | | DONE |
Christina Prado
|
|
|
Changed name from 807 Idaho Restuarant to Alavita per tenants. When plans were originally aubmitted name was unknown.
|
BLD-Final | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | NR |
Dave Hannah
|
|
|
kent Phone #: ###-####
|
BLD-Final | 12/19/2012 | 12/20/2012 | 12/26/2012 | P | PART |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ok for temp occ needs to finish restrooms
|
FIRE-Final Inspection | 12/19/2012 | 12/20/2012 | 12/21/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed.
|
FIRE-Alarm Testing | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PART |
Forrest France
|
|
|
Project related fire alarm and hood suppression system testing completed.
|
Plan Reviewer's activity | | | 12/11/2012 | | DONE |
Jason Blais
|
|
|
Received amended reciprocal easement agreement between 8th & Main and 805 Idaho. Document is attached to this case.
|
BLD-Conference | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | DONE |
Dave Hannah
|
|
|
KENT Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 11/19/2012 | 11/19/2012 | 11/19/2012 | A | PART |
Forrest France
|
|
|
Ref. stamped fire sprinkler plans for overhead work approved to date.
|
BLD-Conference | 11/14/2012 | 11/15/2012 | 11/15/2012 | A | DONE |
Mike Jordan
|
|
|
Kent Phone #: ###-####. Spoke with Kent, wanted to encroach on 21 inch isle width between bar and botths to provide additional overhang for bar and to elinate the 38 inch width for entering and exiting bar. Noted to kent that he would most likely not be able to accomplish this and maintain ada requirements. Needs to go to plan review for approval to change approved plans.
|
BLD-Framing/Rough-in | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ok to cover wall
|
BLD-Framing/Rough-in | 10/18/2012 | 10/19/2012 | 10/22/2012 | A | PASS |
Dave Hannah
|
|
|
kent Phone #: ###-####
|
Permit Ready to Issue | | | 10/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 10/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 10/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CJW) | 8/17/2012 | 8/17/2012 | 10/4/2012 | | PASS |
Carl Westfall
|
|
|
807 IDAHO RESTAURANT (20 days - Sept 13) ePlanReview
|
Routing - PLAN CHECK | 10/1/2012 | | 10/4/2012 | | DONE |
Carl Westfall
|
|
|
Routing completed. Drawings approved.
|
Routing - PLUMBING | 10/4/2012 | | 10/4/2012 | | PASS |
Daryl Spivey
|
|
|
Per revised plans and 2003 UPC.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2012 | | DONE |
|
|
|
|
Routing - PLUMBING | 9/28/2012 | | 10/3/2012 | | FAIL |
Daryl Spivey
|
|
|
Dishwasher and clean sink shall not be drained to grease trap.
|
Routing - PLAN CHECK | 9/26/2012 | | 10/1/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after the 2nd plan review.
|
Routing PW Environmental | 9/28/2012 | | 10/1/2012 | | PASS |
Walt Baumgartner
|
|
|
Two Canplas Endura low profile 25 gpm grease traps on bottom kithchen area w/ upper floor sinks routed down. GPM rating for traps to conform w/ Plumbing code requirements for discharge rate of attached fixtures.
|
Routing Off Site - C.D.H | 9/28/2012 | | 10/1/2012 | | PASS |
|
|
|
Approved by Lori Badigian.
|
Routing PW Sewer Rating | 9/28/2012 | | 10/1/2012 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/26/2012 | | |
|
|
|
|
1st review completed | | | 9/21/2012 | | FAIL |
|
|
|
Failed PW Environmental, Plumbing, and IBC Plan Review.
|
Routing - PLAN CHECK | 8/17/2012 | | 9/21/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Sept 20 and finished the next day. Revisions to the drawings were required. See the plan review report.
|
Routing Off Site - C.D.H | 8/17/2012 | | 8/23/2012 | | PASS |
|
|
|
|
Routing - Addressing | 8/17/2012 | | 8/22/2012 | | PASS |
April Wing
|
|
|
|
Routing - FIRE | 8/17/2012 | | 8/21/2012 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing PW Sewer Rating | 8/17/2012 | | 8/20/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 8/17/2012 | | 8/20/2012 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 8/17/2012 | | 8/20/2012 | | FAIL |
Walt Baumgartner
|
|
|
Resubmit plumbing plans. Show grease abatement for pre-rinse sink and triple sink ground level, and for triple sink & double sink in basement prep area. Canplas Endura passive trap or equivalent ok. Info sent to mechanical engineer - Otto w/ Tikker Eng. As of 9/5/12 he is waiting on architect before submitting redrawn plan sheets.
|
Routing - PLUMBING | 8/17/2012 | | 8/20/2012 | | FAIL |
Bill VanDegrift
|
|
|
Per Public Works install grease intercepter and grease lines.
May require additional backflow protection.
|
Payment Received | | | 8/17/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Pending Assignment by JCB | 8/17/2012 | | 8/17/2012 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 8/17/2012 | | PASS |
Carl Westfall
|
|
|
1) Justification for creating new duct openings in a property line wall and documentation (e.g. code alternate signed by the Building Official) will be provided later.
2) A copy of the agreement that allows mechanical equipment that serves this building to be located on the adjacent property will be provided later.
|
Telephone call | | | 8/17/2012 | | DONE |
Christina Prado
|
|
|
Sent email to architect giving fees due
|
Plan Reviewer's activity | | | 8/17/2012 | | DONE |
Jason Blais
|
|
|
Emailed architect rep to contact ACHD for evaluation of any impact fees due. Our Permit Counter will need written verification from ACHD prior to the building permit being issued.
|
Routing - Design Review | 8/17/2012 | | 8/17/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH12-00132
|
Routing - PUBLIC WORKS | 8/17/2012 | | 8/17/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 7/24/2012 | | FAIL |
|
|
|
The 1st plan intake was not approved. The following is needed before a plan intake can be done.
1) Provide completed Form #520 Major Tenant Improvement Submittal Checklist.
2) Provide the Food Establishment Plan Review and Approval form for the CDHD.
3) Provide justification for creating new duct openings in a property line wall and documentation (e.g. code alternate signed by the Building Official) that approves this. If this is not available, put the make-up air unit on the roof, provide justification for the added dead load, and put the make-up air duct in a 2-hr shaft all the way from the wall penetration at the bottom to the roof at the top.
4) Revise the drawings to show the grease duct within a 2-hr fire-resistance-rated shaft from the top of the grease hoods, through the exterior wall, to the termination of the grease duct at the roof. Show that the shaft will not obstruct the exterior stairway enclosure door or show the door filled in with a 2-hr exterior wall. Show proper clearance from combustible and noncombustible materials. Show cleanout openings.
5) If the make-up air duct penetration is allowed, provide a copy of the agreement that allows mechanical equipment that serves this building to be located on the adjacent property.
6) Provide the rest of Form #310 Statement of Special Inspections with all activities requiring special inspection listed.
|
Application received | | | 6/26/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2012 9:34AM
|