BLD-Conference | 7/29/2014 | 7/29/2014 | 7/29/2014 | A | PASS |
Dave Hannah
|
|
|
AM or PM per Jenifer G.,, call J. G. 1st or 415. 11 foot setback verified at corner. work scheduled to be completed by end of September. Doug will be in contact with parks and fire dept. for revegitation.
|
BLD-Conference | 7/25/2014 | 7/28/2014 | 7/29/2014 | A | PEND |
Dave Hannah
|
|
|
AM or PM per Jenifer G.,, call J. G. 1st or 415
|
BLD-Conference | 7/25/2014 | 7/25/2014 | 7/25/2014 | P | NH |
Tony Young
|
|
|
AM or PM per Jenifer G.,, owner is out of town.. wants to meet on Monday
|
BLD-Energy code compliance | 5/2/2013 | 5/3/2013 | 5/3/2013 | P | PASS |
Dave Hannah
|
|
|
Doug Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Dave Hannah
|
|
|
doug Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2013 | 4/23/2013 | 4/24/2013 | P | PART |
Dave Hannah
|
|
|
Doug Phone #: ###-#### c/n on site ok to insulate
|
BLD-Framing/Rough-in | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | NR |
Dave Hannah
|
|
|
doug Phone #: ###-#### needs fire sprinckler rough in and truss engineering on site
|
BLD-Framing/Rough-in | 3/12/2013 | 3/12/2013 | 3/13/2013 | P | NR |
Tony Young
|
|
|
Doug Phone #: ###-####,, conf only on fireblocking, truss bearing missed locations,, egress windows,, trades,, connections through top plates, (wood to steel)
|
BLD-Framing/Rough-in | 12/19/2012 | 12/20/2012 | 12/20/2012 | A | PART |
Dave Hannah
|
|
|
Doug--Shear inspection please Phone #: ###-#### ok to cover ext also all soffits are fire treated plywood ok to cover soffits
|
Plan resubmittals received | | | 11/14/2012 | | DONE |
|
|
|
new acca report
|
Routing - MECHANICAL | 11/14/2012 | | 11/14/2012 | | PASS |
Troy James
|
|
|
resubmitted acca report
|
Routing Walk-In (BLD) | 10/22/2012 | 10/22/2012 | 11/6/2012 | A | PASS |
Perry Paine
|
|
|
|
BLD-Foundation | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 9/18/2012 | | DONE |
|
|
|
|
BLD-Footing | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Dave Hannah
|
|
|
ALVARO Phone #: ###-####
|
BLD-Foundation | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | PART |
Dave Hannah
|
|
|
Alvardo Phone #: ###-#### garage walls ok to place concrete
|
BLD-Footing | 8/14/2012 | 8/14/2012 | 8/15/2012 | P | PART |
Dave Hannah
|
|
|
Alvardo Phone #: ###-#### garage ftg ok to pour
|
PubWorks Subgrade Approval | 8/7/2012 | 8/7/2012 | 8/7/2012 | | DONE |
Terry Records
|
|
|
footing subgrade approved by the geotechnical engineer
|
Plan assigned to (CDM) | 6/26/2012 | 6/26/2012 | 7/27/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/16/2012 | | 7/27/2012 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/27/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2012 | | DONE |
|
|
|
|
Telephone call | | | 7/27/2012 | | DONE |
|
|
|
Called Doug, permit ready, fees given
|
Permit Ready to Issue | | | 7/27/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 7/26/2012 | | 7/26/2012 | | PASS |
Terry Records
|
|
|
|
Routing PW Grading-Hillside | 7/18/2012 | | 7/18/2012 | | FAIL |
Terry Records
|
|
|
Revised plans were submitted that indicated the foundation wall was below grade.
|
Routing - PUBLIC WORKS GRADING | 7/16/2012 | | 7/17/2012 | | FAIL |
Terry Records
|
|
|
|
1st review completed | | | 7/16/2012 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/3/2012 | | 7/16/2012 | | PEND |
Carl D Madsen
|
|
|
Pending Grading approval 7-16-12 CDM
|
Routing - FIRE | 7/16/2012 | | 7/16/2012 | | PASS |
Scott Arellano
|
|
|
Attached Plan Review report to plans.
|
Route to Impact Fee Review | 6/26/2012 | 6/29/2012 | 7/5/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 7/2/2012 | | 7/3/2012 | | FAIL |
Scott Arellano
|
|
|
Emailed and faxed resubmittal items to Architect. Attached Plan Review report to permit case.
|
Routing - Erosion and Sediment | 6/29/2012 | | 7/2/2012 | | PASS |
Clint A Smith
|
|
|
Please refer to ESC12-00364, changed the permit from a grading to vertical construction.
|
Routing - MECHANICAL | 6/28/2012 | | 6/29/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/27/2012 | | 6/28/2012 | | PASS |
Joshua Johnson
|
|
|
|
Plan resubmittals received | | | 6/28/2012 | | DONE |
Tisha Gallop
|
|
|
received two additional copies of grading plan and rep. made notations on plans requested by Terry Records; plans taken back to Mechanical.
|
Routing PW Grading-Hillside | | | 6/27/2012 | | FAIL |
|
|
|
Need additional copy of the grading plan and elevations of footing and wall on foundation plan. Left message with applicant.
|
Routing - Addressing | 6/26/2012 | | 6/27/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2012 | | 6/27/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 6/26/2012 | | FAIL |
|
|
|
Missing eng stamp and mech/ele sheets
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/26/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Intake Approval | | | 6/26/2012 | | PASS |
Alexandra L. DeYoung
|
|
|
|
Application received | | 6/26/2012 | | | |
|
|
|
|