Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD12-01698
StatusFinaled
Name HC COMPANY INC
Site Address 11005 W FAIRVIEW AVE
Project NameNAPA AUTO PARTS
Customer Number 
ePlanReviewNo
Description
NAPA Automotive Parts Store - To construct a new 9,605 square foot, one story, automotive parts store and related site improvements. This building is constructed of masonry exterior walls with interior steel columns and steel roof joists and girders. The building will be fully fire sprinkled. The storage area in this building will contain a two level rack storage system. The racks were not reviewed under this permit. A separate racking permit will be required before the installation of the proposed racking system. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/11/20136/26/2013 DONE
DetailsChristina Prado
faxed in 6-25-13
Print Statement  6/26/2013 DONE
DetailsChristina Prado
Permanent Occupancy  5/1/2013 DONE
BLD-Final4/30/20134/30/20134/30/2013PPASS
DetailsMike Jordan
contact 1/2 hr prior//Darren Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection4/26/20134/30/20134/30/2013APASS
DetailsTroy Cobbley
life safety passed
PubWorks Occupancy Approval4/30/20134/30/20134/30/2013 DONE
DetailsTiffany Lowery
Zoning Approval4/29/20134/29/20134/29/2013 PASS
DetailsJosh Wilson
Override - Parcel Holds  4/29/2013  
Override - Parcel Holds4/26/20131/1/19004/26/2013  
this is for fire inspection only
BLD-Conference4/25/20134/25/20134/25/2013PDONE
DetailsMike Jordan
please call 1/2 hr prior//Darren Phone #: ###-####
FIRE-Conference4/23/20134/23/20134/23/2013PDONE
DetailsTroy Cobbley
Darrin, myself and a gentleman from Enterprise Electric dicussed and agreed that emergency lighting, below the mezzanine would be modified from what has been installed. We agreed that three lights would be installed in each of the three long corridors and one light would be installed in the short corridors. This was decided after readings from a light meter.
Override - Parcel Holds4/23/20131/1/19004/23/2013  
fire conf
FIRE-Conference4/19/20134/19/20134/19/2013PDONE
DetailsTroy Cobbley
darren and I discussed fire extinguisher placement, addressing, facp room signage and emergency lighting
Override - Parcel Holds4/19/20131/1/19004/19/2013  
this is for a fire conf only
BLD-Framing/Rough-in4/10/20134/10/20134/10/2013PPASS
DetailsMike Jordan
please call 30min prior - darrin Phone #: ###-####. Blocking added to framing for exterior sign at nw end of bldg as per approved plans.
BLD-Framing/Rough-in4/4/20134/9/20134/9/2013APART
DetailsMike Jordan
call 1/2 hr prior//Jason Phone #: ###-####. Exterior steel stud framing for signatnwcorner of building. Need RFI from engineer of record showing the strapping at 4ft. oc. in leiu of steel studs. Ok pending electrical ri inspection.
BLD-Energy code compliance1/17/20131/18/20131/22/2013APASS
DetailsJim Sly
Darren Phone #: ###-####
All framing OK
BLD-Framing/Rough-in1/16/20131/17/20131/17/2013APART
DetailsJim Sly
Darren-PLease call at least 30 mins prior to inspection Phone #: ###-####
Exterior walls OK to insulate.... Need to see Engineering for Rest room and mezzanine framing.
BLD-Conference11/27/201211/27/201211/27/2012PPASS
DetailsMike Jordan
Reviewed special inspection reports and all work that is in progress.
BLD-Other11/9/201211/9/201211/9/2012PPASS
DetailsTom Arcoraci
steve Phone #: ###-#### - rebar brad from mti on site 408
Issue PAID IN FULL permit  10/25/2012 DONE
DetailsBarbara Stitt
Plan Reviewer's activity  7/31/2012 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/31/2012 DONE
DetailsJohn Menard
Print Occupancy Form  7/31/2012 DONE
Permit Ready to Issue  7/31/2012 DONE
DetailsTisha Gallop
Telephone call  7/31/2012 DONE
DetailsTisha Gallop
called Cornel Larson and left vm permit is ready, fees, need ACHD, RP, GC/rce/form.
Routing - PLAN CHECK7/12/2012 7/31/2012 PASS
DetailsJohn Menard
Plan assigned to (JCM)6/27/2012 7/31/2012 PASS
DetailsJohn Menard
Routing PW Sewer Rating  7/31/2012 PASS
DetailsBeverly Mountain
Plan resubmittals received  7/30/2012 DONE
DetailsTisha Gallop
received architectural response, structural response, three copies of strucural calcs and two copies of plan sheets 0, SP-1, C2.0, C2.2, C2.3, A-1, A-2, A-3, A-4, A-5, M2.0, M2.1, M3.0, P2.2, E2.0, E4.0, three copies of S1.1, S2.1, S3.1, S4.1; inserted by Cornel Larson and taken back to John Menard.
Plan resubmittals requested  7/18/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL6/27/2012 7/18/2012 FAIL
DetailsJohn Menard
Called Action Courier for pick up on 6-27-12 @ 1:45pm//BAS -
Received comment list from consulting engineer requesting revisions. JCM
Route to Impact Fee Review7/10/20127/13/20127/17/2012 PASS
DetailsCindy M. Gould
Routing - FIRE7/10/20127/10/20127/12/2012 PASS
DetailsScott Arellano
Attached Plan Review report to plans.
1st review completed  7/12/2012 FAIL
Failed Plan Check
Plan resubmittals requested  7/10/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING7/9/2012 7/10/2012 PASS
DetailsJosh Wilson
Josh Wilson
Routing - PLAN CHECK7/10/2012 7/10/2012 FAIL
DetailsJohn Menard
John Menard
Routing - PLUMBING7/6/2012 7/9/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing - Erosion and Sediment7/3/2012 7/6/2012 PASS
DetailsClint A Smith
ESC12-00663 plan approved with additional conditions attached to the permit.
Plan resubmittals received  7/5/2012 DONE
DetailsTisha Gallop
received three additional copies of drainage plans C1.0, C2.1, C2.2, C2.3; taken to Brian Murphy
Routing - PUBLIC WORKS6/29/2012 7/3/2012 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste7/3/2012 7/3/2012 PASS
DetailsPeter J. McCullough
Routing PW Drainage  7/2/2012 PASS
DetailsBrian Murphy
Routing PW Sewer Design7/2/2012 7/2/2012 PASS
DetailsJon R. Gunnerson
Connect onto existing service line provided.
Routing - PLANNING Land Div6/27/2012 6/28/2012 PASS
DetailsDave Abo
Parcel C on ROS 9196. City approval ROS12-00010.
Application received 6/27/20126/27/2012 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/27/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/27/2012 DONE
DetailsBarbara Stitt
Intake Approval  6/27/2012 PASS
DetailsDan Stuart
Pending Assignment by JCM6/27/2012 6/27/2012 DONE
DetailsJohn Menard